Loading...
HomeMy WebLinkAboutPEC17-0054 Utility Verifications.pdf UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements will not Impact any existing or proposed utility services,and also to verify service availability and location for new construction and should he used in conjunction with preparing your utility plan and scheduling installations. A site plan,including grading plan,floor plan,and elevations,shall he submitted to the following utilities for approval and verification,PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. ,�.Y� f$ ,y� Subject Property Address: �ri'$r4Ta mit' OR, Lot 2. Block I Subdivision: rte+-l'�'r`dfrr'%,if Tre4 Primary Co. - et nor Re entative: 14�01 'te r-k Phone: TM 39 aft gasi Plans Dated: t ('2.2.I f Primary C r,ener Repr entative Signature Authorized Signature Comments Data CENTURY LINK 970.328.8288(tel) 970,328,8282(fax) Contacts:Kelly Maclernon kelly,mcolernon@centurylInk.com XCEL HIGH PRESSURE GAS Xt. melee.% cVoesnot h4Ve any 303.572,6479(cell 1 303.570.8469(cell) �J -44 Pres,twe HP6)et> s yis 970.488.1401(tax) A• Mtl•hfn yR¢ vii en k�)or 79-,a7/0 Contact:John Saone Gddie&S Abate, 1196 /S C/eCc. l )ohn.w,sureIto<c xcelenergy.com HOLY CROSS ENERGY 970.947,5426(tel) 970,946,4081 (fax) Contact:Jeff Vroom jvroom@holycross.com XCEL Energy 970.262,4032(tel) 970,282.4038(fax) Contacts:Brill Mace brillany.MaCe@xcelenergy.com EAGLE RIVER WATER&SANITATION DISTRICT 970.477.5449(tel) 970.845.7218(fax) Contact:Tug Birk dbirk@erwsd,org COMCAST CABLE 970.930.4713(tel) 303.003.1004(fax) Contact:Michael Johnson Michael john son@cable,comcast,com COOT(Only In COOT Right-of-way) 970,B83.6283.62tl4(tel) Contact:Dan Roussin DanleLroussin@doLetate,00.us NOTES( 1, Utility locations must be obtained before digging, 2, A Revocable Right-of-Way Permit may be required for any Improvements within a street right-of-way, Contact the Public Works Department for verification 970,979,2198. 3, It Is the responsibility of the utility company and the applicant to resolve problems Identified above. 9, The Primary Contact/Owner Representative Is required to submit any revised drawings to the above agencies for re-approval&re-verification If the submitted plans are altered in any way after the authorized signature date, UTILITY APPROVAL&VERIFICATION This form seives to verify that the proposed Improvements will not impact any existing or proposed utility services,and also to verify service availability and location for new construction and should be used In conjunction with preparing your utility plan and scheduling installations. A site plan,Including grading plan,floor plan,and elevations,shall be submitted to the following utilities for approval and verification,PLEASE ALLOW UP To 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES, If you are unable to obtain comments within that timeframe please contact The Town of Vail. 3 Subject Property Address:, i/7 I3i' >17,sf*rat oft Lot 2_ Block / Subdivision:1414.)t'07'dl*J'ur r eyttr-r Primary Cor nerRe entalive: (VrC—t' P4LC(, Phone: 91D 390 CoAct s� Plans Dated: 1 ('L2.J 1 R Primary r filer Repr entat)ve Signature faitherized Signature Comments Date CENTURY LINK 970.328.8288(tel) 970.328.8282(fax) Contacts:Kelly McCiernon kelly.moulernon@centuryllnk.com XCEL HIGH PRESSURE GAS .� 970.262.4077(tel) 303.570,5459(cell) 970.468.1401(fax) Contact:John Surette john.w.surette@xcelenorgy.com _ HOLY CROSS ENERGY 970.947.5425(tel) 970,945,4081 (fax) Contact:Jeff Vroom Jvroom@holycross.com XCEL Energy 970.262,4032(tel) 970.262,4038(fax) Contacts:Britt Mace briltany.mace@xeelenergy.com EAGLE RIVER WATER&SANITATION DISTRICT /kp4w l 970,477,5449(tel) pr/ 970.845,7218(fax) 1 2.12—i it o Contact:Tug Dirk dblrk@arwsd,org COMCAST CABLE 970,930.4713(tel) 303.603.1004(fax) Contact:Michael Johnson Mlchasljohnson@e able.ccmcast,coin COOT(OnlyIn COOT Right-o(.Way) 970.083.0284(tel) Contact::DaDan Roussin - Daniol,roussIn@dot,state,co,us NOTES: 1. Utility locations must be obtained before digging. Z. A Revocable Right-of-Way Permit may be required for any Improvements within a street right-of-way, Contact the Public Works Department for verification 970.479,2198. 3. It Is the responsibility of the utility company and the applicant to resolve problems Identified above. 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval&re-verification if the submitted plans are altered in any way after the authorized signature date, UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements wit not impact any existing or proposed utility services,and also to verify service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. A site plan,Including grading plan,floor plan,and elevations,shall be submitted to the following utilities for approval and verification.PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES, If you are unable to obtain comments within that timefreme please contact The Town of Vail. �ry n Subject Property Address:tx'ct finh`ro Moltt/F', Lot 2 Stock Subdivision: -It„- fl'^r511.r iJt f'fuY-' Primary Co r, _�nor Repro,entative: `�'_t ).._?_.. �->14 4�L(?`', .._... Phone:_ij?D (CD: C Plans Dated:,„4'-.21}-1 — Primary Co tact ep e Signature ��— -- Authorized Signature Caplments Date .. CENTURY LINK 970.328.8288(let)070.3282282(fax) 4vL. t Contacts:Kelly McClemon cz .J 1 kelly.mcolernun@uonturylintccom XCEL HIGIi PRESSURE GAS • 970.262 4077(tel) • 303.570.5459(cell) 970.468.1401(rex) Contact:John Surette )ohn.w.suretter xoelener .corn _ HOLY CROSS ENERGY 970.947.5425(tel) 970,945.4081(fax) Contact:Jeff Vroom iv i oomcN,holycross.com XCEL Energy 970.262.4032(tel} 070.2624038(fax} Contacts:Britt Mace brittany.rnace©xcelenergy.com EAGLE RIVER WATER&SANITATION DtSIRICT 970,477,5149(tel) 970,845.7218(fax) Contact;Tug Birk ahlncferwsd.urg COMCAST CABLE.._ 9702304713(tet) A ? 30 003.1004(fax) Contact:Michael Johnson tttp'J/. Michael�ohnson@cable.comcest.com S/!et_ cum'(Only in CNA'RigllfoFWay) 970.683.6284(fel) Contact:Dan Rous sir, iDeniel.roussin@datirtakno.us NOTfs: 1. Utility locations must be obtained before digging. 2, A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. contact the Public.Works Department for verification 970.479.2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above, 4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for re-approval&re-verification If the submitted plans are altered in any way after the authorized signature date. UTILITY APPROVAL&VERIFICATION This form serves to verify that the proposed improvements will not Impact any existing or proposed utility services, and also to verify service availability and location for new construction and should be used In conjunction with preparing your utility plan and scheduling installations. A site plan,including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and verification, PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COM- MENTS FROM THE UTILITY COMPANIES. If you are unable to obtain comments within that timeframe please contact The Town of Vail. nn II '' Subject Property Address:r°57s 1-kw JT'4't t' //6?' Lot 7, Block / Subdivision:YAlr•-Alfrlhr;;,n ,J;PcW-fr Primary Co s per Re entative: geticb P 4uU v-s. Phone: RSD 390 6 of39 tat_ Plans Dated: L (-47-f t Primary Co •- O ner Repr=entative Ignature Authorized Signature Comments Date CENTURY LINK 970.328.8288(tel) 970.328.8282(fax) Contacts:Kelly McClernon kelly.mcclernon@centurylink.com XCEL HIGH PRESSURE GAS 970.262,4077(lel) 303.510.5459(cell) 970.468.1401 (Mx) Contact:John Surelte john.w.surette@xcelonergy.com HOLY CROSS ENERGY 970.947.5425(lel) 970,946.4081 (fax) " ' � 2/6/18 Contact:Jeff Vroom jvroom @holycross.conl XGEL Energy 970.262.4032(tel) 970.262.4038(fax) Contacts:Britt Mace brittanymace@xcelenergy.com EAGLE RIVER WATER 8 SANITATION DISTRICT 970.477.5449(lel) 970.845.7218(fax) Contact:Tug Birk dblrk@erwsd.org COMCAST CABLE 970.930.4713(lel) 303.603.1004(tax) Contact:Michael Johnson MidhaelJohn son@c a bl e.co Inc es t,com COOT(Only in COOT Right-of-way) 970.683.6284(tel) Contact: Den Raussln Daniel.roussin@dotslate.co.us \` NOTES: 1. Utility locations must be obtained before digging. 2. A Revocable Right-of-Way Permit may be required for any Improvements within a street right-of-way. Contact the Public Works Department for verification 970.479,2198. 3. It is the responsibility of the utility company and the applicant to resolve problems identified above, 9, The Primary Contact/Owner Representative Is required to submit any revised drawings to the above agencies for re-approval&re-verification If the submitted plans are altered In any way after the authorized signature date,