Loading...
HomeMy WebLinkAboutprint_page_12-21-2017_5a3bf34e06513-0.pdfPermits Management (B17-0488) Fee Charges (7) Contacts (2) Contractors (1) Properties (1) Inspections (12) PERMITS MANAGEMENT PROJECT Project Name:North Fifth LLC 2017 Goto Case Name:3 BATHROOMS PROPERTY INFORMATION Properties:Primary: 303 GORE CREEK DR 7 (210108231001 7) (210108231001) DESCRIPTION Status:In Review Permit #:B17-0488 Submittal Date:12/21/2017 Issue Date: Last Inspection:Expiration Date: Permit Type:Construction Permit Subcases :Multi-Family Project Valuation:0.00 Date Closed: PROJECT DESCRIPTION Description of Work: Remove tub and install shower. Move toilet supply lines. Move vanity water supply lines and drains. ADDITIONAL INFORMATION PARCEL DATA Vail Village Townhouse Village Master Plan PROJECT CRITERIA Zoning:Land Use: Block:Legal Subdivision: Subdivision:Lot Area: Lot #: Type: Construction Multi-Family Start Date: 12/21/2017 Status: In Review Issued Date: Scope of Work: Remove tub and install shower. Move toilet supply lines. Move vanity water supply lines and drains. Show all 7 Fee Charges Item: Building Plan Review Fee Amount: $217.91 Fee Assessed By: Carolyn Godfrey Item: Plumbing Plan Review Fee Amount: $60.00 Fee Assessed By: Carolyn Godfrey Item: Building Permit Fee Amount: $335.25 Fee Assessed By: Carolyn Godfrey Item: Construction Use Tax Fee Amount: $220.00 Fee Assessed By: Carolyn Godfrey Item: Plumbing Permit Fee Amount: $240.00 Fee Assessed By: Carolyn Godfrey Total Amount: $1,083.16 Amount Paid: $277.91 Amount Due: $805.25 Property Owner Applicant NORTH FIFTH LLC Email: EDIT Michael Johnson ( Cadillac Construction ) P.O. Box 3556 . Vail, CO 81658 Email: cadillac@vail.net EDIT Cadillac Construction Date Exp: 04/30/2020 Status: Active Contractor #: CT-0642 State License #: Contractor Type: General [210108231001] 7 303 GORE CREEK DR 7 Land use Village Master Plan Zone District Designation Vail Village Townhouse TOV Subdivision VAIL VILLAGE FILING 1 Legal Subdivision VAIL VILLAGE FILING 1 TOV Block 5 Lot Area No Data Lot #7 Spray Applied Insulation Date: Status: Unscheduled Inspector: Results: Uninspected U Value of Glazing Date: Status: Unscheduled Inspector: Results: Uninspected View Documents (1) Tagged Cases (0) Activities (34) Add Tag Standard Building Building Plumbing Alteration/Repair Paper PROJECT DATA BUILDING USES Condominium 434 Dwelling Addition/Alteration BUILDING DESCRIPTION Throughout 2015 5000 PLUMBING DATA 16000 TOTAL VALUATION 21000 PERMIT FEES 335.25 240 220 Route Type:Route To: Permit Type:Plan Check Type: 3 Stories or Less?:Submittal Type: Number of Uses (#): Use: Occupancy Class: Occupant Load:Construction Class: Construction Type: New Floor Area (S.F.): Fire Sprinklers: Code Edition:Valuation: Plumbing Description: Valuation: Total Current Valuation: Total Project Valuation: Previous Total Valuation: Original Building Fee: Current Building Fee: Original Mechanical Fee: Current Mechanical Fee: Original Plumbing Fee: Current Plumbing Fee: Original Construction Fee: Current Construction Fee: Original Mechanical PR Fee: Current Mechanical PR Fee: Show all 12 Inspections Rough Mechanical Date: Status: Unscheduled Inspector: Results: Uninspected Rough Plumbing Date: Status: Unscheduled Inspector: Results: Uninspected Batt Insulation Date: Status: Unscheduled Inspector: Results: Uninspected No Description uploaded on 12/21/2017 fees_receipt_81900_2116_81900_12- 21-2017-0.pdf There are no Tagged Cases at this time. Fee Charged. Magnet has charged the fee Will Call Fee (Plumbing Scope) in the amount of $5.00 10:45:35 AM / Thu, Dec 21st, 2017 Carolyn Godfrey Fee Charged. Magnet has charged the fee Will Call Fee (Building Scope) in the amount of $5.00 10:45:35 AM / Thu, Dec 21st, 2017 Carolyn Godfrey Fee Charged. Magnet has charged the fee Plumbing Permit Fee in the amount of $240 10:45:35 AM / Thu, Dec 21st, 2017 Carolyn Godfrey Fee Charged. Magnet has charged the fee Construction Use Tax Fee in the amount of $220 10:45:35 AM / Thu, Dec 21st, 2017 Carolyn Godfrey Fee Charged. Magnet has charged the fee Building Permit Fee in the amount of $335.25 10:45:35 AM / Thu, Dec 21st, 2017 Carolyn Godfrey Show all 34 Activities 60 217.9125 CONDITIONS Original Plumbing PR Fee: Current Plumbing PR Fee: Current Building PR Fee: Number of Conditions: