Loading...
HomeMy WebLinkAboutprint_page_02-19-2018_5a8b5904c5f48-0.pdf PERMITS MANAGEMENT Permits Management(B15-0271) Type: COMBINATION BLDG PERMIT Start Date: 08/03/2015 Status: Closed Issued Date: 08/03/2015 Scope of Work:Add new bath in bedroom #3,remove wall in hall bath,add new Inspections cabinets/tops,tile in all thir floor baths. Change wall heaters to in floor heat in 3rd floor baths. This case is locked Fee Charges(7) Go to Main Inspection GridItem: BUILDING PERMIT FEES 0 Amount: $860.75 Fee Assessed By: 1 'Item: PLUMBING PERMIT FEES la Plumbi Final (Pass) Inspector:Charlie Davis i Amount: $285.00 I Fee Assessed By: Info Checklist Item: ELECTRICAL PERMIT FEES 0 Amount: $57.50 Status Completed Fee Assessed By: Item: ELEC PLAN REVIEW Estimated Duration 1 Hour(s) 0 Amount: $37.38 Fee Assessed By: Permit Number B15-0271Item: PLAN CHECK FEES " Amount: $630.74 Parcel Fee Assessed By: Requested Date 05/10/2016 Total Amount: $3,296.37 Amount Paid: $3,296.37 Inspection Date 05/11/2016 Amount Due: $0.00 Inspection Time Morning rShow all 7 Fee Charge Date Completed 05/11/2016 Contacts(1) Schedule Notes BEP finals key above door Applicant Jeff Lutz Builders Result Pass JEFF LUTZ EAGLE,CO 81631 Email:jlbuildersinc@hotmail.com Charlie Davis at 05/11/2016 11:47:11 ami` Contractors(1) Inspector Signature Jeff Lutz Builders Date Exp: 04/30/2020 Status:Active Contractor#:CT-0094 State License#: Contractor Type:General Result corTrTlentS Charlie Davis at 05/11/2016 11:47:11 am Properties(1) Applicant Signature [NO PARCEL] 1610 SUNBURST DR VAIL(210109104016) Inspections(10) Building Final Charlie Davis at 05/11/2016 11:47:07 ami' Date: 05/19/2016 08:00 AM Status: Completed Approved Inspector: Florencio (JR)Mondragon Results: Pass Plumbing Final Date:05/11/2016 08:00 AM 1 Status: Completed Inspector: Charlie Davis Electrical Final (Pass) Inspector:Outside Resource i Results: Pass Electrical Final Info Checklist Date:05/11/2016 08:00 AM Status: Completed Inspector: Outside Resource Status Completed Results: Pass Estimated Duration 1 Hour(s) Building Final Date:05/11/2016 08:00 AM Permit Number B15-0271 Status: Completed Inspector: Charlie Davis Parcel Results: Fail Requested Date 05/10/2016 PLMDate: 9/30/2015t12:00 AM Inspection Date 05/11/2016 Status: Completed Inspector: shane Inspection Time Morning Results: Pass Date Completed 05/11/2016 Show all 10 Inspections Schedule Notes key above door D RIMMIRMIr Result Pass There are no Documents at this time. Tagged Cases CO) There are no Tagged Cases at this time. Outside Resource at 05/11/2016 08:47:50 am Activities(18) Inspector Signature Case Closed. arogers has closed this case. 03:56:49 PM/Thu,Apr 20th,2017 Andrew Rogers Notification Sent. Florencio (JR)Mondragon has sent inspector_summary.pdf to Jeff Lutz, Result comments Outside Resource at 05/11/2016 08:47:50 am jlbuildersinc@hotmail.com regarding Building Final(16136). Applicant Signature 10:16:32 AM/Thu,May 19th,2016 Florencio (JR)Mondragon Inspection Updated. Florencio (JR)Mondragon has updated the inspection Building Final(16136) 10:16:11 AM/Thu,May 19th,2016 Florencio (JR)Mondragon Notification Sent. Florencio (JR)Mondragon has sent .pdf to Florencio (JR)Mondragon, jmondragon@vailgov.com 1 2 Jeff Lutz Builders, jlbuildersinc@hotmail.com regI(Pass) Inspector:Florencio JR Mondragon 1 03:58:44g Building Final(16136).,2016� � � ag 03:58:44 PM/Wed,May 18th,2 Florencio (JR)Mondragon Info Checklist Inspection Scheduled For 05/19/2016 jmondragon has scheduled the inspection Status Completed Building Final(16136)for 05/19/2016 to Florencio (JR)Mondragon Estimated Duration 1 Hour(s) 03:58:38 PM/Wed,May 18th,2016 Permit Number B15-0271 Florencio (JR)Mondragon Parcel Show all 18 Activities Requested Date 05/10/2016 Inspection Date 05/19/2016 Inspection Time Homing Date Completed 05/19/2016 Schedule Notes KEY OVER DOOR Result Pass Florencio (JR)Mondragon at 05/19/201610:16:00 am Approved Florencio (JR)Mondragon at 05/19/2016 10:16:06 am Inspector Signature Result comments Florencio (JR)Mondragon at 05/19/2016 10:16:06 am Applicant Signature PWIB-Rough/Water(Pass) Inspector:shane 0 PWIB-Rough/Water(Fail) Inspector:shane 0 ELEC-Rough (Pass) Inspector:shane til PLMB-Rough/Water(Pass) ,Inspector:shane ti) 0 PLMB-Rough/D.W.V. (Pass) Inspector:shane t) PLMB-Underground (Pass Inspector: shane fi