HomeMy WebLinkAboutfinal inspections PERMITS MANAGEMENT Permits Management(B14-0476)
Type: COMBINATION BLDG PERMIT
L Start Date: 12/12/2014
Inspectionsit
DateStatus: e12/12/2014
Scope of Work:Addition &Remodel
includes new roof,windows,kitchen and
Create New Inspection: select options _ Create— boiler.Move 2 exterior walls. Raise partial
o to Main Inspection Grid roof.Add dormer.
Fee Charges(10)
1 X11 +1
Item: BUILDING PERMIT FEES
Electrical Final (Pass) Inspector:Outside Resource Cif
0 Amount: $6,448.25Fee Assessed By:
Info Checklist Edit InfoItem: PLUMBING PERMIT FEES
0 Amount: $525.00
Status Completed Fee Assessed By:
Item: MECHANICAL PERMIT FEES
Estimated Duration 1 1-bur(s) O Amount: $900.00
Fee Assessed By:
Permit Number Not Issued Item: ELECTRICAL PERMIT FEES
Parcel I'▪d Amount: $201.25
Fee Assessed By:
Requested Date 05/05/2016 Item: ELEC PLAN REVIEW
Inspection1 Fee▪ Amount:A
Date 05/05/2016 $
Fee Assesseedd By:
Inspection Time Morning Total Amount: $37,459.82
Amount Paid: $37,459.82
Date Completed 05/05/2016 i Amount Due: $0.00
Schedule Notes rShow all 10 Fee Charges
Result Pass Contacts(0)
There are no Contacts at this time.
Outside Resource at 05/05/2016 10:51:18 am "
Inspector Signature Contractors(1)
Ulf&Associates LLC
Date Exp: 04/30/2020
Status:Active
Contractor#: CT-0051
State
Result commentsLicenseType:
Contractor
General
Outside Resource at 05/05/2016 10:51:18 am.r`
Applicant Signature Properties(1)
[210109101016]
1B
1628 GOLF TER 1B
Land use Medium Density
Residential
Insert Re-Inspection Send Notification Zoning Two-Family Residential
TOV WARREN PULIS
Subdivision SUBDIVISION
Legal WARREN PULIS
1 x + Subdivision SUBDIVISION
TOV Block No Data
Planning Final(Pass) Inspector:Jonathan Spence i
Lot Area No Data
Info Checklist Edit Info
Lot# 1
Status Completed
Estimated Duration 1 Fiour(s) Inspections(30)
Permit Number Not Issued Building Final
Date: 05/27/2016 08:00 AM
Parcel Status: Completed
Inspector: Florencio (JR)Mondragon
Requested Date 05/04/2016 Results: Pass
Building Final
Inspection Date 05/25/2016 Date: 05/25/2016 08:00 AM
Inspection Time MorningStatus: Completed
Inspector: Florencio (JR)Mondragon
Date Completed 05/27/2016 Results: Fail
Planning Final
Schedule Notes Date:05/25/2016 08:00 AM
Status: Completed
Result Inspector:Jonathan Spence
Results: Pass
Result comments
Electrical Final
Date:05/05/2016 08:00 AM
Insert Re-Inspection Send Notification Status: Completed
Inspector: Outside Resource
Results: Pass
Building Final
x 2 x 3 x Date:05/05/2016 08:00 AM
Status: Completed
Building Final (Pass) Inspector: Florencio(JR)Mondragon fi Inspector: Florencio (JR)Mondragon
Results: Fail
Info [ Checklist Edit Info
IrShow all 30 Inspections
Status Completed Documents(0)
Estimated Duration 1 Hour(s) There are no Documents at this time.
Permit Number Not Issued Tagged Cases(0)
Parcel There are no Tagged Cases at this time.
Requested Date 05/04/2016 p Add Tag
Inspection Date 05/27/2016 Activities(30) IdEr
Inspection Time Morning
Fee Charged.
Date Completed 05/27/2016 Magnet has charged the fee Building
Permit Fee in the amount of$0
Schedule Notes 12:04:07 PM/Mon,Dec 18th,2017
Danielle Couch
Result Permits Management Case Updated.
Danielle Couch altered permits
Florencio (JR)Mondragon at 05/27/2016 08:58:36 management case #B14-0476 from
ISSUED to Closed.
am 12:04:06 PM/Mon,Dec 18th,2017
Final approved Danielle Couch
Inspection Results Recorded.
jspence has marked the inspection
Florencio (JR)Mondragon at 05/27/2016 08:58:43 Planning Final(15005)as Pass
04:00:25 PM/Fri,May 27th,2016
am '' Jonathan Spence
Applicant Signature Notification Sent.
Florencio (JR)Mondragon has sent
Result COlriltellt5 inspector_summary.pdf to Ulf Lindroth,
ulf@ulfbuilt.com regarding Building Final
(16829).
08:59:09 AM/Fri,May 27th,2016
Florencio (JR)Mondragon
Florencio (JR)Mondragon at 05/27/2016 08:58:43 Inspection Updated.
am ,. Florencio (JR)Mondragon has updated the
inspection Building Final(16829)
Inspector Signature 08:58:48 AM/Fri,May 27th,2016
Florencio (JR)Mondragon
CO Active ies
Insert Re-Inspection Send Notification
1 x +
Plumbing Final (Pass) :Inspector: Florencio(JR)Mondragon ti)
Info I Checklist Edit Info
Status Completed
Estimated Duration 1 Hour(s)
Permit Number Not Issued
Parcel
Requested Date 04/22/2016
Inspection Date 04/25/2016
Inspection Time Morning
Date Completed 04/25/2016
Schedule Notes
Result Pass
Florencio (JR)Mondragon at 04/25/2016 10:26:39
am "
Approved
Florendo (JR)Mondragon at 04/25/2016 10:26:43
am
Inspector Signature
Result comments Florencio (JR)Mondragon at 04/25/201610:26:43
am "
Applicant Signature
Insert Re-Inspection Send Notification
1 x „
BLDG-Sheetrock Nail (Pass) Inspector:shane U
4'
1 x +
BLDG-Misc. (Pass) Inspector: Florencio(JR)Mondragon U
1 x +
BLDG-Misc. (Pass) Inspector:Florencio(JR)Mondragon U
x +
BLDG-Insulation(Pass) Inspector: Florencio(JR)Mondragon
1 x +
BLDG-Framing(Pass) Inspector:shane U
1 x +
ELEC-Rough (Pass) Inspector:shane U
4
1 xl1 +1
MECH-Heating (Pass) Inspector:shane Q
4
1 x +
PLMB-Rough/Water(Pass) Inspector:shane ti)
1 x +
PLMB- h/D.W.V. Pass Inspector:shane Q
ff4
I� 1 x +
MECH-Rough (Pass) Inspector:Florencio(JR)Mondragon iD
�1 x +
BLDG-FOOTING (Pass) Inspector: shane fi
1 x +
BLDG-Sheetrock Nail (Fail) Inspector:shane U
1 x +
BLDG-FOOTING (Pass) Inspector:Florencio(JR)Mondragon (i)
1 x +
PLMB-Gas Piping (Pass) Inspector:Florencio(JR)Mondragon U
II 1 x +
ELEC-Rough (Fail) Inspector:shane 0
4
1 x +
BLDG-FOOTING (Fail) Inspector:Martin Haeberle
�1 x +
BLDG-FOOTING (Fail) Inspector:shane U
1 x +
PLMB-Underground (Pass) "Inspector: Florencio(JR)Mondragon ti)
f�
II 1 xll
BLDG-FOOTING (Fail) Inspector:shane
1 x +
BLDG-Sheetrock Nail(Fail) Inspector:shane CO
1 x +
BLDG-Sheetrock Nail(Fail) Inspector:shane 0
II x
BLDG-FOOTING (Fail) _Inspector: Florencio(JR)Mondragon 1
1 x +
BLDG-Fatxiation/Steel (Pass) Inspector:shane 4
1 x +
BLDG-Fou-dation/Steel (Fail) Inspector:Martin Haeberle (1)
Ii