HomeMy WebLinkAboutwvrMHT 3 (2).pdf MHT 3 West Vail Underpass Shift(West) Chamonix
Project Name Pmject Number 1 N
( \ \----j
West Vail Roundabout Concrete&Stone Repair
PAme contractor ttemc Cored Cmbedor
Kraemer N/A Your Way Safety&Sign Supply Inc. ..... E
Phone Sheet Number Date; ,-.
1/1 01/24/18
Premed By
Mitch Stauffer S
* NOT TO SCALE
N. Frontage Rd. / / i: -. 7 _
- - - - - - - - -
173
N. Frontage Rd. * NOTES *
To Be used in Conjunction with MHT 1 (Advanced Warning Plan)
Channelizing Device Spacing(Candlesticks)= 1'per Speed Limit in Merging/
.IIPShifting Tapers&2'per Speed Limit in tangent areas (MUTCD Section 6F.63)
KEEP Sign Spacing= 100'Minimum for Urban Low speed(Guide signs and Chevrons
as Depicted)(MUTCD Table 6C-1)
RIGHT 1_
Conflicting Signs to be Covered
_ _ _ L I Z _ _ _ _
1 10
INTERSTATE
COLORADO I I .
COLORADO
7 /
INTERSTATE
0
\ . .
/ 70
!I'l :
1-- i
— — — — — — —
Lir r
/ L. KEEPS
I RIGHT
____ ,, r _....._
, (
1I
S. Frontage Rd.
S. Frontage Rd.
SUMMARY: �� - - " Owner:
(2) Keep Right/Arrow 24"x 30"
Contractor:
Candlesticks as necessary
Marriot Prepared By: vv/—