HomeMy WebLinkAboutwvrMHT 5 (2).pdf MHT 5 Controls for Re-Striping Operations * NOTES *
rry.uNamw Pro,ed Number N
West Vail Roundabout concrete&Stone Repair Sign Spacing = 100' Minimum for Urban Low Speed (MUTCD Table 6C-1).
Prima
Contractor
Sign Traffic Supply Channelizing Device Spacing (Candlesticks) = 1' per Speed Limit in Merging /
tor
Kraemer N/A Your Way Safety&Sign Supply Inc.
MUM Shoat
Nurnbar Date W E Shifting Tapers & 2' per Speed Limit in tangent areas (MUTCD Section 6F.63)
1/1 04/09/18
Prepared By
Mitch Stauffer S
* NOT TO SCALE * ROAD
WORK Chamonix
AHEAD
•IMIrEND
ROAD WORK
.- _7•z: --------\ ROAD
WORK
' —t-7 ,
AHEAD �� II N. Frontage Rd.
J ROAD WORK (::: :;17�� — — — — — — l
( ( (------"\\ ) \---_______
173
, / cii
' .1:7
ROAD
N. Frontage Rd. 12 wo K
WORK END ' ROAD WORK AHEAD
AHEAD ROAD WORK VY-
KIERNAN INTERSTATE
70 °--° I 70
ROAD
WORK
cli
AHEAD -_ ROAD
WORK
® END AHEAD
END -P ', - ROAD WORK
ROAD WORK '•-r �&-•a •
EVY 'S. Frontage Rd. r- S. Frontage Rd.
173 .
cli
ROAD
WORK SUMMARY. Th (OAD
ENT]AHEAD ORK ROAD WORK
AHEAD
(8) Road Work Ahead 48"x 48"
(7) End Road Work 18"x 36"
(3) Flagger Symbols 48"x 48" Owner:
Flaggers as necessary Marriot
Cones as necessary Contractor:
Prepared By: ��'G" / � 'l