Loading...
HomeMy WebLinkAboutB18-0066_01.G-0_1523647561.pdf600 WEST LIONSHEAD PLACE VAIL, COLORADO 81657 LIONS SQUARE LODGE PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS PROJECT: LIONS SQUARE LODGE PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS 600 WEST LIONSHEAD PLACE VAIL, COLORADO 81657 CLIENT: LIONS SQUARE LODGE HOA 600 WEST LIONSHEAD PLACE VAIL, COLORADO 81657 ENGINEER: BC&E, LLC 1520 West Canal Court, Suite 240 Littleton, Colorado SONJA HINISH 303-350-1000 INDEX TO DRAWINGS G - 0 - GENERAL NOTES AND SCOPE OF WORK R - 1 - STRUCTURAL REPAIR PLAN R - 2 - PLAZA LEVEL DEMOLITION PLAN R - 3 - PLAZA LEVEL DRAINAGE AND REPAIR PLAN R - 4 - PLAZA LEVEL PAVING PLAN R - 4A - PLAZA LEVEL PAVING PLAN - ALTERNATE R - 5 - STRUCTURAL AS-BUILT DETAILS R - 6 - STRUCTURAL REPAIR DETAILS R - 7 - WATERPROOFING DETAILS - 1 R - 8 - WATERPROOFING DETAILS - 2 R - 9 - WATERPROOFING DETAILS - 3 SITE MAP Sheet Title Sheet Scale BC&E No.ProjectISSUED FOR PRICINGAS NOTED1/12/18PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS - LIONS SQUARE LODGE HOAGENERAL NOTES AND SCOPE OF WORKG-0 Date 1520 West Canal Court, Suite 240Littleton, Colorado 80120 303.350.1000 Tel | 303.350.1004 FaxPlotted: 4/4/2018 12:04 PM by: Sonja File Name: LSL - PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS.dwg 16121 2/12/2018IMAGE COURTESY OF GOOGLE MAPS PROJECT LOCATION 1. GENERAL 1.1. THESE GENERAL NOTES APPLY EXCEPT WHERE OTHERWISE INDICATED BY THESE DRAWINGS. 1.2. THESE DRAWINGS INDICATE TYPICAL AND SPECIFIC DETAILS OF THE CONSTRUCTION. ALL FEATURES OF THE CONSTRUCTION NOT SPECIFICALLY SHOWN SHALL BE OF THE SAME TYPE AND CHARACTER AS THOSE SHOWN FOR SIMILAR CONDITIONS, SUBJECT TO APPROVAL BY THE ENGINEER. 1.3. ALL CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH THE APPLICABLE BUILDING CODES. 1.4. ALL WORK SHALL BE SCHEDULED AND PERFORMED TO MAINTAIN SAFETY AT ALL TIMES, AND SHALL BE COORDINATED WITH THE OWNER'S REPRESENTATIVE AND OTHER ON-SITE CONTRACTORS FOR LIMITED DISRUPTIONS. 1.5. THE CONTRACTOR SHALL VERIFY ALL SITE CONDITIONS, ELEVATIONS, DIMENSIONS, ETC. PRIOR TO FABRICATIONS AND CONSTRUCTION AND SHALL NOTIFY THE ENGINEER OF ANY VARIATIONS FROM THE CONTRACT DOCUMENTS. 1.6. THE CONTRACTOR SHALL PROVIDE ADEQUATE SHORING AND BRACING FOR ALL STRUCTURAL AND ARCHITECTURAL ELEMENTS DURING THE REPAIRS. SHORING AND BRACING MUST ENSURE THE SAFETY OF THE STRUCTURE & THE JOB-SITE PERSONNEL. DESIGN AND PLACEMENT OF THE SHORING IS THE RESPONSIBILITY OF THE CONTRACTOR. 1.7. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF LIGHTING, ELECTRICAL, PLUMBING PENETRATIONS ETC. 1.8. THE CONTRACTOR IS RESPONSIBLE FOR ALL PERMITS. 1.9. THE CONTRACTOR SHALL COORDINATE TRAFFIC AND PARKING CLOSURES WITH THE OWNER PRIOR TO AND DURING THE COURSE OF THE REPAIRS. 2. DISCOVERY AND FIELD VERIFICATION 2.1. DURING CONSTRUCTION, THE CONTRACTOR MAY ENCOUNTER EXISTING CONDITIONS WHICH ARE NOT NOW KNOWN OR ARE AT VARIANCE WITH PROJECT DOCUMENTATION (DISCOVERY). SUCH CONDITIONS MAY INTERFERE WITH REPAIR WORK OR REQUIRE PROTECTION AND/OR SUPPORT OF EXISTING WORK DURING CONSTRUCTION, OR MAY CONSIST OF DAMAGE TO STRUCTURAL MATERIALS OR COMPONENTS WHICH COULD JEOPARDIZE THE STRUCTURAL INTEGRITY OF THE NEW WORK. 2.2. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ALL DISCOVERIES HE BELIEVES MAY INTERFERE WITH THE PROPER EXECUTION OF THE WORK OR JEOPARDIZE THE STRUCTURAL INTEGRITY OF THE WORK PRIOR TO PROCEEDING WITH WORK RELATED TO SUCH DISCOVERIES. 2.3. THE DESIGN DOCUMENTS MAY SPECIFY DIMENSIONS, ELEVATIONS AND CONSTRUCTION CONDITIONS TO BE FIELD VERIFIED. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFICATION OF ALL SPECIFIED CONDITIONS PRIOR TO PROCEEDING WITH THE CONSTRUCTION OR FABRICATION OF ANY COMPONENTS RELATED TO SUCH CONDITIONS. THIS FIELD VERIFICATION SHALL BE MADE IN A TIMELY MANNER SO AS TO CAUSE NO DELAYS IN EXECUTION OF THE WORK. 3. STRUCTURAL STABILITY DURING CONSTRUCTION 3.1. THE STRUCTURAL DRAWINGS ILLUSTRATE THE COMPLETED STRUCTURE WITH ALL ELEMENTS IN THEIR FINAL POSITIONS, PROPERLY SUPPORTED AND BRACED. 3.2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION MEANS AND METHODS. 3.3. THE CONTRACTOR, IN THE PROPER SEQUENCE, SHALL PROVIDE PROPER SHORING AND BRACING AS MAY BE REQUIRED DURING CONSTRUCTION TO ACHIEVE THE FINAL COMPLETED STRUCTURE. 3.4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL SITE SAFETY ISSUES AS MANDATED BY FEDERAL, STATE AND LOCAL LAWS AND REGULATIONS. THE CONTRACTOR SHALL EMPLOY A "COMPETENT PERSON" AS DEFINED IN OSHA REGULATIONS TO IDENTIFY SAFETY ISSUES. THE CONTRACTOR SHALL EMPLOY A "QUALIFIED PERSON" AS DEFINED IN OSHA REGULATIONS TO SPECIFY THE RESOLUTION OF SAFETY ISSUES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR IDENTIFYING AND SPECIFYING ANY MODIFICATIONS TO THE STRUCTURE REQUIRED FOR COMPLIANCE WITH OSHA REGULATIONS AND GENERALLY ACCEPTED PRINCIPLES OF CONSTRUCTION. THE CONTRACTOR SHALL PROPOSE ALL SUCH MODIFICATIONS TO THE ENGINEER FOR REVIEW PRIOR TO CONSTRUCTION. THE FOLLOWING IS A GENERAL DESCRIPTION OF THE SCOPE OF THE REPAIRS. MEANS AND METHODS OF THE REPAIR ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. THEREFORE, ITEMS WHICH ARE NOT CONTAINED HEREIN, WHICH AFFECT THE SAFETY OF THE PUBLIC, WORKERS, AND SUCCESSFUL COMPLETION OF THE PROJECT SHALL BE INCORPORATED INTO THE SEQUENCE AS APPROPRIATE. 1.0 LUMP SUM WORK: 1.1. MOBILIZATION AND DEMOBILIZATION. 1.2. GENERAL CONDITIONS. 1.3. REMOVE ABANDONED ELECTRICAL AND PLUMBING CONDUIT/PIPE IN PARKING GARAGE. 1.4. REMOVE EXISTING CONCRETE TOPPING SLAB IN ITS ENTIRETY AS INDICATED ON SHEET R-2 AND SHOT BLAST TOP OF EXISTING PRECAST CONCRETE DOUBLE TEE BEAMS TO PREPARE SUBSTRATE FOR WATERPROOFING INSTALLATION. 1.5. REMOVE EXISTING LANDSCAPING AND PAVEMENT (INCLUDING LARGE LANDSCAPING STONES TO EXPOSE NORTH AND WEST FOUNDATION WALLS AS INDICATED ON SHEET R-2. REMOVE EXISTING CONCRETE SIDEWALK ALONG WEST SIDE OF PLAZA. REMOVE ASPHALT PAVING AND LANDSCAPING OVER TUNNEL STRUCTURE AT NORTHWEST CORNER OF PLAZA. REINSTALL OR REPLACE EXISTING LANDSCAPING, PAVEMENT, AND SIDEWALK FOLLOWING COMPLETION OF WATERPROOFING REPAIRS AS INDICATED ON SHEET R-3. 1.6. EXCAVATE TRENCH ALONG WEST SIDE OF PLAZA TO ALLOW FOR TIE-IN OF NEW DRAIN PLUMBING TO EXISTING STORM SEWER AND BACKFILL ONCE TIE-IN AND WATERPROOFING REPAIRS ARE COMPLETE. INSTALL PENETRATION FOR NEW DRAIN PIPE THROUGH WEST FOUNDATION WALL AND TIE-IN TO EXISTING STORM SEWER PIPE. SEE DETAIL 9/R-7. 1.7. REMOVE AND SALVAGE LOWER PORTION OF STONE VENEER AT KNEE-WALLS AS INDICATED ON SHEET R-2. REINSTALL VENEER FOLLOWING COMPLETION OF WATERPROOFING REPAIRS. 1.8. PERFORM STRUCTURAL REPAIRS TO EXISTING PRECAST CONCRETE PARKING GARAGE STRUCTURE INDICATED ON SHEET R-1 AND AS DETAILED ON SHEET R-6. 1.9. REMOVE AND SALVAGE EXISTING BAND OF BRICK PAVERS AND BRICK PAVERS BETWEEN BAND AND EXPANSION JOINT AS SHOWN ON SHEET R-2. INSTALL NEW SNOW-MELT SYSTEM WITHIN SAND SETTING BED. REINSTALL SALVAGED PAVERS. 1.10. INSTALL POLYURETHANE JOINT SEALANT AND BACKER ROD AT ALL JOINTS IN PRECAST CONCRETE STRUCTURE PRIOR TO THE INSTALLATION OF THE NEW WATERPROOFING ASSEMBLY. REFER TO DETAILS 4 AND 5 ON SHEET R/8. 1.11. INSTALL NEW SNOW-MELTED PLAZA ASSEMBLY AND HOT FLUID-APPLIED, FABRIC REINFORCED WATERPROOFING SYSTEM OVER EXISTING PRECAST CONCRETE PARKING GARAGE STRUCTURE AS INDICATED ON SHEETS R-3 AND R-4. REFER TO MECHANICAL DRAWINGS FOR SNOW-MELT SYSTEM DETAILS. 1.12. INSTALL THREE (3) NEW ZURN Z158-85 BI-LEVEL DRAINS WITH PERFORATED DRAIN EXTENSIONS PER DETAIL 3/R-7 AND NEW DRAIN PIPING. 2.0 UNIT PRICE REPAIRS: AT ADDITIONAL LOCATIONS NOT INDICATED ON SHEET R-1, PROVIDE UNIT PRICE TO: 2.1. REPAIR FLANGE TO FLANGE CONNECTION AT DOUBLE-TEE. SEE DETAIL 7/R-6. (PER EACH) 2.2. REPAIRED INVERTED TEE BEAM DETERIORATION. SEE DETAILS 4/R-6 AND 5/R-6. (PER EACH) 2.3. REMOVE AND REPLACE DETERIORATED STEEL BEARING PLATE AT INVERTED TEE BEAM BEARING AT TOP OF COLUMN. SEE DETAIL 3/R-5. (PER EACH) 2.4. REMOVE AND REPLACE DETERIORATED STEEL BEARING PLATE AT DOUBLE-TEE BEARING. SEE DETAIL 2/R-6. (PER EACH) 2.5. REPAIR DETERIORATED STEM OF DOUBLE TEE. SEE DETAIL 1/R-6. (PER EACH) 2.6. REPAIR CONCRETE SPALL AT FLANGE OF DOUBLE TEE. SEE DETAIL 9/R-6. (PER EACH) GENERAL NOTES SCOPE OF WORK ISSUED FOR CONSTRUCTION12/12/183.0 ALTERNATES: 3.1. INSTALL SNOW-MELT SYSTEM IN NEW SIDEWALK ALONG WEST END OF STRUCTURE. 3.2. PROVIDE ALTERNATE CONCRETE CURB AND PAVER LAYOUT AS SHOWN ON SHEET R-4A. PROPOSED INTENT AND PERFORMANCE EXPECTATION OF THE WORK · THE EXISTING CONSTRUCTION OF THE PARKING GARAGE INCLUDES PRECAST CONCRETE DOUBLE-TEES BEARING ON INVERTED TEE-BEAMS AND CONCRETE COLUMNS SUPPORTING AN UNBONDED CONCRETE TOPPING SLAB. THE TOPPING SLAB MAY HAVE ORIGINALLY BEEN BONDED TO THE TOP SURFACE OF THE DOUBLE-TEES (BUT IS NO LONGER BONDED AS DISCOVERED BY EXPLORATORY OPENINGS) AND VARIES IN THICKNESS FROM ABOUT 4-INCHES TO MORE THAN 9-INCHES. PORTIONS OF THE BELOW-GRADE PARKING GARAGE HAVE EXPERIENCED LEAKAGE AND/OR DETERIORATION OF THE STRUCTURAL ELEMENTS DUE TO PROLONGED EXPOSURE TO WATER. THE CONDITION OF THE STRUCTURE AND EXISTING PAVEMENT HAVE BEEN DOCUMENTED BY A REPORT AND DISCUSSED WITH THE BOARD. · BC&E, LLC PERFORMED A LIMITED STRUCTURAL ANALYSIS OF THE EXISTING PARKING STRUCTURE INCLUDING A CODE-PRESCRIBED LOAD TEST TO DETERMINE IF THE EXISTING STRUCTURE HAD SUFFICIENT LOAD-CARRYING CAPACITY TO SUPPORT AN UNBONDED PAVEMENT ASSEMBLY. THE EXISTING, UN-REPAIRED STRUCTURE PASSED THE TESTING AND DEMONSTRATED THAT IT WAS CAPABLE OF SUPPORTING THE PROPOSED PAVEMENT ASSEMBLY INCLUDED IN THIS DESIGN AND THE REQUIRED LIVE LOADS. THE LOAD TEST WAS DOCUMENTED IN A REPORT TO THE BOARD. · THE FOCUS OF THE REPAIR WORK DETAILED IN THESE DOCUMENTS IS SPECIFICALLY FOR THE OBSERVED DETERIORATION WITHIN THE GARAGE. WE ARE NOT PROPOSING TO REPLACE THE WATERPROOFING SYSTEMS ELSEWHERE ON THE PROPERTY. · THE INTENT OF THE REPAIRS IS SUCH THAT OVER THE NEXT 10 YEARS, LITTLE, IF ANY SIGNIFICANT REPAIR WORK SHOULD BE REQUIRED WITHIN THE GARAGE AND THAT NO SIGNIFICANT LEAKAGE SHOULD OCCUR AT THE REPAIRED AREAS WHEN PROPER PERIODIC INSPECTIONS AND MAINTENANCE OF THE WATERPROOFING ELEMENTS ARE PERFORMED. IT SHOULD BE ANTICIPATED THAT MINOR CRACKING IN THE NEW CONCRETE CURBS AND REPAIRS MAY OCCUR. · OUR DESIGN WAS LIMITED BY SEVERAL ITEMS WHICH CANNOT REASONABLY CHANGED OR MODIFIED. THESE INCLUDE, BUT ARE NOT LIMITED TO: EXISTING ELEVATIONS OF STAIRS, ENTRIES, LOAD CAPACITY OF THE STRUCTURE, AND TRANSITIONS TO OTHER PAVEMENT SYSTEMS. THE STRUCTURAL AND WATERPROOFING ISSUES WERE INVESTIGATED AND DISCUSSED WITH THE BOARD MEMBERS WHO ALSO UNDERSTAND AND ACCEPT THESE CONSTRAINTS. REPAIR DESIGN CRITERIA BASIS OF DESIGN: ORIGINAL STRUCTURAL DESIGN DRAWINGS DATED MARCH 17, 1972 REPAIR DESIGN: STRUCTURAL REPAIRS DESIGNED IN ACCORDANCE WITH THE 2015 INTERNATIONAL BUILDING CODE (IBC 2015) INCLUDING THE AMERICAN CONCRETE INSTITUTE BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318-14) -LIVE LOAD: 250 PSF -GROUND SNOW LOAD: 145 PSF SPECIAL INSPECTION REQ. · STEEL ANGLES, CHANNELS, AND PLATES TO BE ASTM A36 STEEL 1. THE SPECIAL INSPECTOR SHALL BE AN "APPROVED AGENCY" AS SET FORTH IN CHAPTER 17 OF THE 2015 IBC, AND SHALL DEMONSTRATE SUCH COMPETENCY TO THE SATISFACTION OF THE BUILDING OFFICIAL AND THE ENGINEER. BC&E AS THE "REGISTERED DESIGN PROFESSIONAL IN CHARGE" WILL ACT AS THE SPECIAL INSPECTOR FOR THE STRUCTURAL MODIFICATIONS AND REPAIRS OF THIS PROJECT PER 1704.2.1. 2. THE SPECIAL INSPECTOR SHALL ISSUE REPORTS ON A REGULAR BASIS THROUGHOUT THE COURSE OF THE WORK, THE REPORTS SHALL IDENTIFY THE OBSERVATION AND FINDINGS MADE AND SHALL IDENTIFY ANY DEFICIENCIES. UPON COMPLETION OF THE WORK, THE SPECIAL INSPECTOR SHALL ISSUE A FINAL REPORT TO THE CONTRACTOR AND THE ENGINEER WITH THEIR STAMP AND SIGNATURE ATTESTING TO THEIR INSPECTION, OBSERVATIONS, AND FINDINGS. THIS FINAL REPORT SHALL ALSO IDENTIFY ANY REPORTED DEFICIENCIES WHICH HAVE NOT BEEN RESOLVED.REVISIONS FOR PERMITTING24/04/18SPECIAL INSPECTION SCHEDULE BASED ON IBC CHAPTER 17 VERIFICATION AND INSPECTION FREQUENCY REFERENCED STANDARD 1. Structural Observations of structural modifications Periodic IBC Sections 1704.6 2. Structural steel Periodic IBC 1705.2.1 3. Concrete Construction IBC 1705.3 -Inspect reinforcement Periodic ACI 318-14 -Inspect post-installed anchors Periodic ACI 318-14 -Verify use of required design mix Periodic ACI 318-14 -Verify maintenance of specified curing temperature and design mix Periodic ACI 318-14 04/13/18 STORAGEMEETING ROOM MEETING ROOM REPAIR FLANGE-TO-FLANGE CONNECTION AT DOUBLE-TEES. SEE DETAIL 7/R-6. REPAIR INVERTED TEE BEAM DETERIORATION. SEE DETAILS 4/R-6 AND 5/R-6. REMOVE AND REPLACE DETERIORATED STEEL BEARING PLATES AT INVERTED TEE BEAM BEARING AT TOP OF COLUMN. SEE DETAIL 3/R-6. REMOVE AND REPLACE DETERIORATED STEEL BEARING PLATE AT DOUBLE-TEE BEARING. SEE DETAIL 2/R-6. REPAIR DETERIORATED STEM OF DOUBLE TEE. SEE DETAIL 1/R-6. REPAIR CONCRETE SPALL AT FLANGE OF DOUBLE TEE. SEE DETAIL 9/R-6. SANDBLAST CLEAN AND PAINT CORRODED STEEL REPAIRS, TYPICAL. SEE DETAIL 6/R-6 AND 8/R-6. 21'-0"130'-8" 152'-8" NOTE: DIMENSIONS PROVIDED ARE BASED ON THE ORIGINAL STRUCTURAL DESIGN DRAWINGS DATED MARCH 17, 1972. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS AND STARTING WORK. 72'-0" 21'-0"7'-6" 48'-0" 3'-2" 1'-0"14'-0"29'-6" 19'-6" RAMP DOWN15'-4"8'-8"6"6"63'-6"5 R-5 1 R-5 Sheet Scale BC&E No. AS NOTED 16121STRUCTURAL REPAIR PLANR-1 Date Plotted: 4/4/2018 12:04 PM by: Sonja File Name: LSL - PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS.dwg 1 SHEET R-1 PARTIAL GARAGE STRUCTURAL REPAIR PLAN SCALE: 1/8" = 1'-0" 12 3 4 5 6 7 8 9 10 11 12 13 1415 16 17 18 19 2021 22 2324 25 26 27 28 29 30 31 32 33 34 35 36 37 38 EXISTING EXPANSION JOINT EXISTING DOUBLE TEE BEAM (TYP.) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 11 1 1 11 1 1 2 KEY 2 4 4 4 3 3 3 3 6 5 5 5 5 5 5 5 1 1 5 5 5 6 5 6 5 6 6 6 6 7 4 3 5 6 7 TYP. 7 TYP. 2/12/2018 2 Sheet TitleProjectISSUED FOR PRICING 1/12/18PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS - LIONS SQUARE LODGE HOA1520 West Canal Court, Suite 240Littleton, Colorado 80120 303.350.1000 Tel | 303.350.1004 FaxISSUED FOR CONSTRUCTION 12/12/18REVISIONS FOR PERMITTING2 4/04/1804/13/18 EXISTING SNOW-MELTED BRICK PAVER SYSTEM OVER WATERPROOFING SYSTEM TO REMAIN EXISTING EXPANSION JOINT SYSTEM WITH CONCRETE CURBS EACH SIDE TO REMAIN EXISTING EXIT DRIVE LANE EXISTING ENTRANCE DRIVE LANE EXISTING STONE CLAD KNEE-WALL; REMOVE AND SALVAGE EXISTING STONE VENEER; DO NOT DAMAGE EXISTING RAILING (TYP.) REMOVE EXISTING TOPPING SLAB IN ITS ENTIRETY; AVERAGE THICKNESS OF 6"; THICKNESS VARIES FROM 4" TO 10"; SHOTBLAST DOUBLE TEES TO PREPARE SUBSTRATE FOR NEW WATERPROOFING EXTERIOR 12" THICK FOUNDATION WALL BELOW EXISTING BOLLARDS SOUTH OF SHED AND CONCRETE FOUNDATIONS TO REMAIN REMOVE EXISTING 4' SECTION OF PAVEMENT SOUTH OF CONTROL JOINT ACROSS ENTIRE WIDTH OF DRIVE LANE REMOVE EXISTING LANDSCAPING AND PAVEMENT (INCLUDING LARGE LANDSCAPING STONES) IN 3 FEET WIDE STRIPS AT NORTH AND WEST FOUNDATION WALLS EXISTING NON SNOW-MELTED PAVER SYSTEM; REMOVE AND SALVAGE BAND OF BRICK PAVERS AND BRICK PAVERS BETWEEN BAND AND EXPANSION JOINT REMOVE ASPHALT PAVING AND LANDSCAPING OVER TUNNEL STRUCTURE BELOW EXTERIOR 6" THICK FOUNDATION WALL BELOW 3'-0"EXISTING MECHANICAL SHED TO REMAIN; DO NOT DAMAGE EXISTING STAIR (NOT IN SCOPE) EXISTING STAIR (NOT IN SCOPE) EXISTING STONE CLAD KNEE-WALL; REMOVE AND SALVAGE EXISTING STONE VENEER; DO NOT DAMAGE EXISTING RAILING (TYP.) NOTE: CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS AND STARTING WORK. 3'-0" DEMOLISH EXISTING CONCRETE SIDEWALK EXISTING STONE CLAD WALL; REMOVE AND SALVAGE EXISTING STONE VENEER EXCAVATE TRENCH FOR TIE-IN OF NEW DRAIN PLUMBING TO EXISTING STORM SEWER; CONNECTION TO BE DETERMINED; ASSUME MIN. EXCAVATION DEPTH OF 4 FEET REMOVE EXISTING LANDSCAPING AND PAVEMENT (INCLUDING LARGE LANDSCAPING STONES) IN 3 FEET WIDE STRIP AT WEST FOUNDATION WALL CUT AND DISCARD BASE OF STUCCO ALONG WALLS; SEE DETAIL 6/R-7 REMOVE AND SALVAGE STONE VENEER TO ALLOW FOR WATERPROOFING TERMINATION; SEE DETAIL 6/R-8 (E) STORM SEWER PIPE( E ) S T O R M S EW E R PI P E (E) SAND/OIL PIPE (E) STORM SEWER PIPE(E) SAND/OIL INTERCEPTOR Sheet Scale BC&E No. AS NOTED 16121PLAZA LEVEL DEMOLITION PLANR-2 Date Plotted: 4/4/2018 12:04 PM by: Sonja File Name: LSL - PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS.dwg 1 SHEET R-2 PLAZA LEVEL DEMOLITION PLAN SCALE: 1/8" = 1'-0" 2/12/2018Sheet TitleProjectISSUED FOR PRICING 1/12/18PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS - LIONS SQUARE LODGE HOA1520 West Canal Court, Suite 240Littleton, Colorado 80120 303.350.1000 Tel | 303.350.1004 FaxISSUED FOR CONSTRUCTION 12/12/18REVISIONS FOR PERMITTING2 4/04/1804/13/18 EXISTING ENTRANCE DRIVE LANE; REPAIR ASPHALT REMOVED DURING WATERPROOFING REPAIRS REINSTALL SALVAGED STONE VENEER FOLLOWING COMPLETION OF WP REPAIRS; DO NOT DAMAGE EXISTING RAILING (TYP.) INSTALL NEW SNOW-MELTED PAVEMENT ASSEMBLY (DETAIL 1/R-7) OVER TUNNEL STRUCTURE NOTE: CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS AND STARTING WORK. REINSTALL OR REPLACE EXISTING LANDSCAPING AND PAVEMENT (INCLUDING LARGE LANDSCAPING STONES) AT NORTH PERIMETER WALL OF THE GARAGE FOLLOWING COMPLETION OF WATERPROOFING REPAIRS EXISTING MECHANICAL SHED TO REMAIN; DO NOT DAMAGE EXISTING EXIT DRIVE LANE; REPAIR 4' SECTION OF CONCRETE REMOVED DURING WATERPROOFING REPAIRS INSTALL (N) SNOW-MELT TUBING EMBEDDED IN SAND SETTING BED SUPPORTED ON WELDED-WIRE FABRIC OVER (E) WP SYSTEM; REINSTALL SALVAGED PAVERS FOLLOWING REPAIRS INSTALL NEW SNOW-MELTED PAVEMENT ASSEMBLY (DETAIL 1/R-7) SLOPED TO NEW DRAIN LOCATIONS INSTALL NEW BI-LEVEL ZURN Z158-85 DRAIN WITH PERFORATED DRAIN EXTENSION (TYP.) TIE-IN NEW DRAIN PIPE TO EXISTING STORM SEWER AND BACKFILL TRENCH FOLLOWING REPAIRS EXTERIOR FOUNDATION WALL BELOW (TYP.) INSTALL NEW CONCRETE SIDEWALK FOLLOWING COMPLETION OF WATERPROOFING REPAIRS; PROVIDE OPTION TO SNOW-MELT SIDEWALK REINSTALL SALVAGED STONE VENEER FOLLOWING COMPLETION OF WATERPROOFING REPAIRS REINSTALL SALVAGED STONE VENEER FOLLOWING COMPLETION OF WP REPAIRS; DO NOT DAMAGE EXISTING RAILING (TYP.) INSTALL (N) POLYURETHANE JOINT SEALANT AND BACKER ROD BETWEEN FLANGES OF ALL (E) DOUBLE TEE BEAMS AND ALONG LENGTH OF INVERTED TEE BEAM (BOTH SIDES) (TYP.); SEE DETAILS 4/R-8, 5/R-8 AND 2/R-9 FOR TREATMENT OF JOINTS INSTALL (N) POLYURETHANE JOINT SEALANT AND BACKER ROD AT JOINT BETWEEN ENDS OF (E) DOUBLE TEE BEAMS AND NORTH, SOUTH, AND WEST FOUNDATION WALLS (TYP.) INSTALL (N) POLYURETHANE JOINT SEALANT AND BACKER ROD AT JOINTS BETWEEN (E) PRECAST CONCRETE PLANKS AT TUNNEL; NUMBER AND LOCATION OF JOINTS TO BE FIELD VERIFIED; SEE DETAIL 5/R-8 9 R-8 7 R-8 9 R-7 SIM. 6 R-8 1 R-7 TYP. 8 R-8 5 R-7 5 R-7 5 R-7 3 R-7 1 R-9 3 R-7 SIM. 4 R-7 7 R-7 6 R-7 8 R-7 BENCHMARK CENTERED ON TOP OF WALL EL: 100.00' MATCH EXISTING FINISH EL: 97.18' MATCH EXISTING FINISH EL: 97.22' MATCH EXISTING FINISH EL: 95.82' MATCH EXISTING FINISH EL: 96.82' MATCH EXISTING FINISH EL: 96.37' MATCH EXISTING FINISH EL: 96.46' MATCH EXISTING FINISH EL: 95.87' NEW FINISH EL: 97.0' NEW FINISH EL: 96.4' NOTE: THE STRUCTURAL LEVEL IS SLOPED FROM THE NORTH AND SOUTH EDGES OF THE PARKING LOT TOWARDS THE INVERTED T-BEAM AND FROM THE EAST END TOWARD THE WEST END OF PARKING LOT 4'-0"INSTALL NEW EXTRUDED POLYSTYRENE (XPS) RIGID FOAM INSULATION ON TOP OF NEW WP MEMBRANE TO PROVIDE SLOPE FOR PAVERS; STARTING AT SOUTH WALL, INSTALL XPS INSULATION 4 INCHES IN THICKNESS TAPERING TO ZERO AT 4 FEET FROM THE INVERTED TEE BEAM (COMPRESSIVE STRENGTH OF XPS TO BE 100 PSI) MATCH EXISTING FINISH EL: 96.92' MATCH EXISTING FINISH EL: 97.53' EXISTING INVERTED TEE BEAM BELOW 9 R-7 (E) STORM SEWER PIPE( E ) S T O R M S EW E R PI P E (E) SAND/OIL 8" DIAM. PIPE (E) STORM SEWER PIPE(E) SAND/OIL INTERCEPTOR (E) RIM NORTH EL. = 8115.6' TYP. TYP. SIM. -TOP OF (E) STRUCTURE: 96.54'* -TOP OF (N) DRAIN FINISH EL: 96.95' -TOP OF (E) STRUCTURE: 95.93'* -TOP OF (N) DRAIN FINISH EL: 96.35'-TOP OF (E) STRUCTURE: 95.22'* -TOP OF (N) DRAIN FINISH EL: 95.64' 4.5" OF XPS INSULATION; TAPER TO ZERO AT DRAINS4.5" OF XPS INSULATION; TAPER TO ZERO AT DRAINS 4" OF XPS INSULATION 0" OF XPS INSULATION 3" OF XPS INSULATION 3" OF XPS INSULATION *NOTE: ELEVATIONS AT TOP OF STRUCTURE ARE ESTIMATED BASED ON LIMITED CORES TAKEN FROM THE EXISTING TOPPING SLAB. ELEVATIONS MAY NEED ADJUSTED ONCE TOPPING SLAB IS REMOVED TO REFLECT ACTUAL CONDITIONS.3'-0"(E) 8" INV EL. = 8107.00' (E) 8" INV EL. = 8107.71' (E) MANHOLE, RIM EL. = 8123.85' PROPOSED (N) TIE-IN EL: 8119' 32' VIF Sheet Scale BC&E No. AS NOTED 16121PLAZA LEVEL DRAINAGE AND REPAIR PLANR-3 2/12/2018 Date Plotted: 4/4/2018 12:04 PM by: Sonja File Name: LSL - PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS.dwg R-3 SHEET 1 NEW PLAZA DRAINAGE AND REPAIR PLAN SCALE: 1/8" = 1'-0"Sheet TitleProjectISSUED FOR PRICING 1/12/18PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS - LIONS SQUARE LODGE HOA1520 West Canal Court, Suite 240Littleton, Colorado 80120 303.350.1000 Tel | 303.350.1004 FaxISSUED FOR CONSTRUCTION 12/12/18REVISIONS FOR PERMITTING2 4/04/1804/13/18 NEW PAVER SYSTEM PATTERN TO INCORPORATE DRAINS SURROUNDED BY CONCRETE CURBS NEW CONCRETE BANDS 16" WIDE SHALL HAVE CONTROL JOINTS SPACED AT 4 FEET O.C. (TYP.); IN ADDITION, INSTALL CONTROL JOINTS AT JOINTS BETWEEN INVERTED TEE BEAM AND DOUBLE TEES AND AT DECORATIVE ELEMENT AROUND DRAINS EXISTING PLAZA (NOT IN SCOPE) REINSTALL SALVAGED PAVERS NOTE: CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS AND STARTING WORK. 9 R-8 7 R-8 9 R-7 9 R-7 SIM. 6 R-8 1 R-7 8 R-8 5 R-7 5 R-7 5 R-7 3 R-7 3 R-7 SIM. 4 R-7 7 R-7 6 R-7 TYP.2 R-7 TYP. 2 R-7 SIM. TYP. 8 R-7 EXISTING INVERTED TEE BEAM BELOW 3'-0"16" 1'-0"6"6"16" ALIGN CONCRETE CURB WITH END OF EXISTING WALL PAINT STRIPING FOR PARKING STALLS; COORDINATE WITH OWNER 16" 16" 16" 16" 16" ALIGN CONCRETE CURBS WITH CENTER AND END OF (E) WALL 1 R-9 TYP. Sheet Scale BC&E No. AS NOTED 16121PLAZA LEVEL PAVING PLANR-4 2/12/2018 Date Plotted: 4/4/2018 12:04 PM by: Sonja File Name: LSL - PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS.dwg 1 SHEET R-4 NEW PLAZA PAVING PLAN SCALE: 1/8" = 1'-0"Sheet TitleProjectISSUED FOR PRICING 1/12/18PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS - LIONS SQUARE LODGE HOA1520 West Canal Court, Suite 240Littleton, Colorado 80120 303.350.1000 Tel | 303.350.1004 FaxISSUED FOR CONSTRUCTION 12/12/18REVISIONS FOR PERMITTING2 4/04/1804/13/18 NEW PAVER SYSTEM PATTERN TO INCORPORATE DRAINS SURROUNDED BY CONCRETE CURBS NEW CONCRETE BANDS 16" WIDE SHALL HAVE CONTROL JOINTS SPACED AT 4 FEET O.C. (TYP.); IN ADDITION, INSTALL CONTROL JOINTS AT JOINTS BETWEEN INVERTED TEE BEAM AND DOUBLE TEES AND AT DECORATIVE ELEMENT AROUND DRAINS EXISTING PLAZA (NOT IN SCOPE) REINSTALL SALVAGED PAVERS NOTE: CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS AND STARTING WORK. 9 R-8 7 R-8 9 R-7 9 R-7 SIM. 6 R-8 1 R-7 8 R-8 5 R-7 5 R-7 5 R-7 3 R-7 3 R-7 SIM. 4 R-7 7 R-7 6 R-7 TYP. 2 R-7 TYP. 2 R-7 SIM. TYP. 8 R-7 ALIGN CONCRETE CURBS WITH CENTER AND END OF (E) WALL EXISTING INVERTED TEE BEAM BELOW 3'-0"16" 1'-0"6"6"16" ALIGN CONCRETE CURB WITH END OF EXISTING WALL PAINT STRIPING FOR PARKING STALLS; COORDINATE WITH OWNER 16" 16" 16" 1 R-9 TYP. Sheet Scale BC&E No. AS NOTED 16121PLAZA LEVEL PAVING PLAN - ALTERNATE R-4A 2/12/2018 Date Plotted: 4/4/2018 12:04 PM by: Sonja File Name: LSL - PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS.dwg 1 SHEET R-4 NEW PLAZA PAVING PLAN - ALTERNATE PATTERN SCALE: 1/8" = 1'-0"Sheet TitleProjectISSUED FOR PRICING 1/12/18PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS - LIONS SQUARE LODGE HOA1520 West Canal Court, Suite 240Littleton, Colorado 80120 303.350.1000 Tel | 303.350.1004 FaxISSUED FOR CONSTRUCTION 12/12/18REVISIONS FOR PERMITTING2 4/04/1804/13/18 8'-0"3.5" 2" 4"8"+/- 6" 2'-3 1/2"1'-6 1/2" 3'-11" 1'-6 1/2"4 1/2"6" 2" 2"(E) 316" DIAM. WWF 6"X6" TYP. IN STEMS 2" 3.5" 2.5" 3.5"2"(E) #3 BARS @ 6" O.C. IN FLANGE (E) 516" DIAM. WWF 6"X8" (E) #3 BARS @ 6" O.C. IN FLANGE (E) 516" DIAM. WWF 6"X8" 22'-6" +/- (E) (1) 12" DIAM. TENDON LAID STRAIGHT (E) (4) 12" DIAM. TENDONS DRAPED1'-6" 45'-0" 1'-6" DAP END (E) UN-BONDED TOPPING SLAB; 6" AVG. THICKNESS (THICKNESS VARIES FROM 4" TO 10") 2 R-5 3 R-5 4 R-5 (E) UN-BONDED TOPPING SLAB; 6" AVG. THICKNESS (THICKNESS VARIES FROM 4" TO 10") (E) PRECAST CONCRETE DOUBLE TEE BEAM (E) PRECAST CONCRETE INVERTED L-BEAM (E) PRESTRESSING TENDONS WITHIN T-BEAM; DO NOT DAMAGE (E) 516" DIAM. WWF 6"X8" (E) 12" DIAM. TENDONS IN WEB OF DOUBLE TEE BEAM (E) #3 BARS @ 6" O.C. IN FLANGE 6"1'-0"2'-2 1/2"TENDON LAYOUT AT MID-SPAN 2"2.5"3"Sheet Scale BC&E No. AS NOTEDSTRUCTURAL AS-BUILT DETAILSR-5 Date 2 SHEET R-5 SECTION - NORTH SCALE: 1" = 1'-0"Plotted: 4/4/2018 12:04 PM by: Sonja File Name: LSL - PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS.dwg 3 SHEET R-5 SECTION - CENTER SCALE: 1" = 1'-0" 4 SHEET R-5 SECTION - SOUTH SCALE: 1" = 1'-0" 1 SHEET R-5 TYPICAL DOUBLE TEE ELEVATION SCALE: 1/2" = 1'-0" 5 SHEET R-5 INVERTED T-BEAM SCALE: 1-1/2" = 1'-0" 16121 2/12/2018 NOTES: 1. DOUBLE-TEES ARE LIGHT WEIGHT CONCRETE 2. ORIGINAL DESIGN CRITERIA 1972 WAS FOR AASHTO H15-44 TRUCK LOADING 3. UN-BONDED NORMAL WEIGHT CONCRETE TOPPING IS INSTALLED ON DOUBLE-TEES (TOPPING NOT SHOWN IN SECTIONS FOR CLARITY) Sheet TitleProjectISSUED FOR PRICING 1/12/18PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS - LIONS SQUARE LODGE HOA1520 West Canal Court, Suite 240Littleton, Colorado 80120 303.350.1000 Tel | 303.350.1004 FaxISSUED FOR CONSTRUCTION 12/12/18REVISIONS FOR PERMITTING2 4/04/1804/13/18 REMOVE DETERIORATED CONCRETE; CLEAN EXPOSED REINFORCING DOWN TO GRAY METAL AND PAINT WITH CORROSION INHIBITING COATING; INSTALL (N) CONCRETE REPAIR MATERIAL AND PAINT SURFACE TO MATCH (E) BEAM AT LOCATIONS INDICATED ON SHEET R-2; DO NOT DAMAGE EMBEDDED PRESTRESSING TENDONS IN WEB DURING REPAIRS END OF (E) DOUBLE-TEE INSTALL (N) STEEL DOWELS (4 MIN.) AND (N) WIRE MESH TO SECURE AND REINFORCE (N) CONCRETE PATCH; OR INSTALL (2) ROWS OF 316" DIAMETER TAPCONS AT 6" O.C. 2'-0" 6 "6"(E) STEEL BEARING PLATE AT END OF DOUBLE TEE; REMOVE AND REPLACE IN KIND; ASSUME (N) 6"X12"X12" STEEL PLATE AND NEOPRENE BEARING PAD AT LOCATIONS INDICATED ON SHEET R-2 (E) STEEL BEARING PLATES AT COLUMN; REMOVE AND REPLACE IN KIND; ASSUME (N) 10"X24"X12" STEEL PLATES AT LOCATIONS INDICATED ON SHEET R-2 REMOVE (E) ABANDONED ELECTRICAL AND PLUMBING CONDUIT (E) 14"X14" CONCRETE COLUMN REMOVE (E) DETERIORATED CONCRETE; INSTALL (N) STEEL DOWELS (2 MIN.) TO ANCHOR (N) PATCH; INSTALL (N) CONCRETE REPAIR MATERIAL (TYPICAL SIZE: 6"X6"X3"); DO NOT DAMAGE EMBEDDED PRESTRESSING TENDONS WITHIN BOTTOM FLANGE OF INVERTED TEE-BEAM DURING REPAIRS REMOVE DETERIORATED CONCRETE AT INVERTED T-BEAM; CLEAN EXPOSED REINFORCING DOWN TO GRAY METAL AND PAINT WITH CORROSION INHIBITING COATING; INSTALL (N) CONCRETE REPAIR MATERIAL AND PAINT SURFACE TO MATCH (E) BEAM AT LOCATIONS INDICATED ON SHEET R-2; DO NOT DAMAGE EMBEDDED PRESTRESSING TENDONS WITHIN BOTTOM FLANGE OF L-BEAM DURING REPAIRS INSTALL (N) 14" DIAM. STAINLESS STEEL THREADED RODS AT 12" O.C. OR (2) ROWS OF 316" DIAM. TAPCONS AT 6" O.C.; AND (N) WIRE MESH TO SECURE AND REINFORCE (N) CONCRETE PATCH VARIES 26"4"CLEAN (E) STEEL ANGLE RETROFITS AND SUPPORTS AT INVERTED TEE BEAM DOWN TO GRAY METAL; INSTALL 2 COATS OF (N) ZINC-RICH PRIMER AND (N) ENAMEL TOP COAT (TYP.) 2'-6" 5" 7 3/4" 2" 1/2" SECTION A R-6 (N) (8) 12" DIAM. ASTM A307 GR. A THROUGH BOLT (N) GALVANIZED C10X25X2'-6" (E) TOPPING SLAB TO BE REMOVED (E) PRECAST CONCRETE DOUBLE TEE BEAM4.5"IF ELEVATION OF BOTTOM FLANGE OF ADJACENT DOUBLE TEE VARIES BY 18" OR MORE, WELD (N) GALVANIZED STEEL SHIM TO CHANNEL (SIZE: 2"X12") IF ELEVATION OF BOTTOM FLANGE OF ADJACENT DOUBLE TEES VARIES BY 18" OR MORE, WELD (N) GALVANIZED STEEL SHIM TO CHANNEL (SIZE: 2"X12") (E) PRECAST CONCRETE DOUBLE TEE FLANGE (TOPPING SLAB NOT SHOWN) (N) (8) 12" DIAM. ASTM A307 GR. A THROUGH BOLT (E) STEEL REINFORCING TO REMAIN; DO NOT DAMAGE (N) GALVANIZED C10X25X2'-6"A (N) 2'-6" X 10" X 12" STEEL PLATE 10" (N) 2'-6" X 10" X 12" STEEL PLATE (N) 38" NEOPRENE BEARING PAD BETWEEN CHANNEL AND BOTTOM OF FLANGE (N) 38" NEOPRENE BEARING PAD BETWEEN CHANNEL AND BOTTOM OF FLANGE CLEAN (E) STEEL ANGLE RETROFITS AT NORTH WALL DOWN TO GRAY METAL; INSTALL 2 COATS OF (N) ZINC-RICH PRIMER AND (N) ENAMEL TOP COAT (TYP.) REMOVE DETERIORATED CONCRETE AT FLANGE OF DOUBLE TEE; CLEAN EXPOSED REINFORCING DOWN TO GRAY METAL AND PAINT WITH CORROSION INHIBITING COATING; INSTALL (N) STEEL DOWELS (2 MIN.) TO ANCHOR (N) PATCH; INSTALL (N) CONCRETE REPAIR MATERIAL AND PAINT SURFACE TO MATCH (E) DOUBLE TEE AT LOCATIONS INDICATED ON SHEET R-2; (TYPICAL SIZE: 24"X8"X4.5") 8"2'-0" Sheet Scale BC&E No. AS NOTEDSTRUCTURAL REPAIR DETAILSR-6 Date 1 SHEET R-6 DOUBLE TEE STEM REPAIR NOT TO SCALE Plotted: 4/4/2018 12:04 PM by: Sonja File Name: LSL - PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS.dwg 2 SHEET R-6 BEARING BAD REPLACEMENT AT DOUBLE TEE NOT TO SCALE 3 SHEET R-6 BEARING PAD REPLACEMENT AT COLUMN NOT TO SCALE 4 SHEET R-6 INVERTED TEE BEAM REPAIR NOT TO SCALE 5 SHEET R-6 INVERTED TEE BEAM REPAIR NOT TO SCALE 6 SHEET R-6 CLEAN AND COAT EXISTING STEEL REPAIRS NOT TO SCALE 7 SHEET R-6 FLANGE TO FLANGE CONNECTION REPAIR SCALE: 1" = 1'-0" 8 SHEET R-6 CLEAN AND COAT EXISTING STEEL REPAIRS NOT TO SCALE 9 SHEET R-6 DOUBLE TEE FLANGE REPAIR NOT TO SCALE 16121 2/12/2018Sheet TitleProjectISSUED FOR PRICING 1/12/18PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS - LIONS SQUARE LODGE HOA1520 West Canal Court, Suite 240Littleton, Colorado 80120 303.350.1000 Tel | 303.350.1004 FaxISSUED FOR CONSTRUCTION 12/12/18REVISIONS FOR PERMITTING2 4/04/1804/13/18 (N) INTERLOCKING PAVERS (N) SNOW-MELT TUBING EMBEDDED IN SAND SETTING BED SUPPORTED ON WELDED-WIRE FABRIC (N) SAND SETTING BED (N) FILTER FABRIC (N) 12" DRAINAGE MAT (N) 18" ASPHALTIC PROTECTION BOARD (N) HOT, FLUID-APPLIED, FABRIC REINFORCED WATERPROOFING SYSTEM (E) PRECAST CONCRETE STRUCTURE; CLEAN AND PREPARE SURFACE TO RECEIVE (N) WPM5" MIN.DETAIL (N) DOWEL WITH WATERPROOFING PRIOR TO PLACEMENT OF CONCRETE CURB (N) 16" CONCRETE CURB TO BE CAST ON TOP OF (N) WP MEMBRANE, PROTECTION BOARD, AND DRAINAGE MAT; PLACE CONTROL JOINTS EQUALLY SPACED AT 4 FEET O.C. MAX. (N) PAVEMENT ASSEMBLY; SEE DETAIL 1/R-7 (N) SNOW-MELT SYSTEM (N) WATERPROOFING MEMBRANE TO BE CONTINUOUS BELOW (N) CONCRETE CURB; CLEAN AND PREPARE SURFACE OF (E) CONCRETE TO RECEIVE (N) WPM INSTALL (N) #3 DOWELS AT 48" O.C. INTO THE (E) CONCRETE WITH HILTI HIT-HY 200 EPOXY (1-1/2" MIN. EMBEDMENT) 16" (N) 18" ASPHALTIC PROTECTION BOARD TO BE CONTINUOUS UNDER (N) CONCRETE CURB (N) DRAIN MAT TO BE CONTINUOUS UNDER CURB 1.5" MIN.(N) HEEL PROOF DRAIN GRATE (N) S.S. THREADED RODS WITH (3) S.S. NUTS FOR EACH ROD WRAP RISER WITH FILTER FABRIC EXTEND (N) WATERPROOFING MEMBRANE AND REINFORCING INTO DRAIN BODY AND SECURE WITH CLAMPING RING (N) ZURN Z158-85 BI-LEVEL DRAIN WITH PERFORATED DRAIN EXTENSION; TOP OF DRAIN TO BE AT OR BELOW THE ELEVATION OF THE ADJACENT CONCRETE FILL ANNULAR SPACE UNDER DRAIN FLANGE SOLID WITH NON-SHRINK GROUT (E) PRECAST CONCRETE DOUBLE TEE; CLEAN AND PREPARE SURFACE TO RECEIVE NEW WPM SLOPE (N) CONCRETE CURBS INTERSECTING AT DRAINS DETAIL (N) DOWEL WITH WATERPROOFING PRIOR TO PLACEMENT OF CONCRETE CURBS INSTALL (N) #3 DOWELS AT 48" O.C. INTO THE (E) CONCRETE WITH HILTI HIT-HY 200 EPOXY (1-1/2" MIN. EMBEDMENT) INSTALL CONTROL JOINTS IN (N) CONCRETE CURBS AT 48" O.C. MIN. (TYP.); IN ADDITION, INSTALL CONTROL JOINTS AT JOINTS BETWEEN INVERTED TEE BEAM AND DOUBLE TEES AND AT DECORATIVE ELEMENT AROUND DRAINS (E) EXPANSION JOINT TO REMAIN; PROTECT FROM DAMAGE DURING COURSE OF WORK (E) CONCRETE CURB TO REMAIN (E) CONCRETE CURB TO REMAIN (E) NON SNOW-MELTED PAVER SYSTEM; REMOVE AND SALVAGE BAND OF BRICK PAVERS AND BRICK PAVERS BETWEEN BAND AND EXPANSION JOINT TERMINATE (N) WATERPROOFING INTO (N) REGLET AND INSTALL (N) 18" X 1" CONTINUOUS S.S. TERMINATION BAR; ANCHOR WITH 14" DIAM. FASTENERS AT 8" O.C.; SEAL TOP EDGE WITH LIQUID MEMBRANE (N) PAVEMENT ASSEMBLY; SEE DETAIL 1/R-7 INSTALL (N) SNOW-MELT TUBING EMBEDDED IN SAND SETTING BED SUPPORTED ON WELDED-WIRE FABRIC OVER (E) WP SYSTEM; REINSTALL SALVAGED PAVERS FOLLOWING REPAIRS EXTENT OF WARRANTY (E) CONCRETE WALL TO REMAIN TERMINATE (N) WATERPROOFING WITH (N) 18" X 1" CONTINUOUS S.S. TERMINATION BAR; ANCHOR WITH 14" DIAM. FASTENERS AT 8" O.C.; SEAL TOP EDGE WITH LIQUID MEMBRANE (N) Z-SHAPED SHEET-METAL FLASHING WITH 12" HEMMED DRIP EDGE; INSTALL BEHIND (N) PAVERS (N) 18" ASPHALTIC PROTECTION BOARD (N) PAVING ASSEMBLY; SEE DETAIL 1/R-7 (N) WATERPROOFING SYSTEM INSTALLED OVER THE TOP SURFACE OF THE CLEANED, AND PREPARED CONCRETE WALL SURFACE REINSTALL SALVAGED STONE VENEER 8" MIN.2" MIN. TURN (N) FILTER FABRIC UP AT END TO CONTAIN SAND (E) PRECAST CONCRETE STRUCTURE TO REMAIN; CLEAN AND PREPARE SURFACE TO RECEIVE (N) WPM (N) POLYURETHANE SEALANT AND BACKER ROD AT JOINT BETWEEN (E) DOUBLE TEE AND FOUNDATION WALL (TYP.); SEE DETAIL 2/R-9 FOR TRANSITION OF WPM (N) TAPERED XPS INSULATION TO PROVIDE SLOPE FOR PAVERS TO DRAINS AS NECESSARY; SEE SHEET R-3 DEPTH VARIES (E) CONCRETE WALL TO REMAIN TERMINATE (N) WATERPROOFING SYSTEM WITH (N) 18" X 1" CONTINUOUS S.S. TERMINATION BAR; ANCHOR WITH 14" DIAM. FASTENERS AT 8" O.C.; SEAL TOP EDGE WITH LIQUID MEMBRANE (N) Z-SHAPED SHEET-METAL FLASHING WITH 12" HEMMED DRIP EDGE; INSTALL BEHIND (N) PAVERS (N) 18" ASPHALTIC PROTECTION BOARD (N) PAVING ASSEMBLY; SEE DETAIL 1/R-7 (N) WATERPROOFING SYSTEM INSTALLED OVER THE TOP SURFACE OF THE CLEANED, AND PREPARED CONCRETE WALL SURFACE SAWCUT (E) STUCCO; SALVAGE (E) LATH TO PROVIDE A 12" MIN. OVERLAP OF (N) AND (E) METAL LATH; REPAIR STUCCO FOLLOWING COMPLETION OF WP REPAIRS 2" MIN.8" MIN.TURN (N) FILTER FABRIC UP AT END TO CONTAIN SAND (N) WRB; LAP OVER TOP LEG OF (N) SHEET METAL FLASHING; SECURE WITH PLASTIC CAPPED NAILS AT 8" O.C. (E) WEATHER RESISTIVE BARRIER (WRB); PROVIDE 12" LAP OF (E) WRB OVER (N) WRB (E) PRECAST CONCRETE STRUCTURE TO REMAIN 24"+/-(N) POLYURETHANE SEALANT AND BACKER ROD AT JOINT BETWEEN (E) DOUBLE TEE AND FOUNDATION WALL (TYP.); SEE DETAIL 2/R-9 FOR TRANSITION OF WPM (N) TAPERED XPS INSULATION TO PROVIDE SLOPE FOR PAVERS TO DRAINS AS NECESSARY; SEE SHEET R-3 DEPTH VARIES (E) PRECAST CONCRETE STRUCTURE TO REMAIN; CLEAN AND PREPARE SURFACE TO RECEIVE (N) WPM INSTALL NEW PAVING ASSEMBLY; SEE DETAIL 1/R-7 (INTERIOR) (N) 18" ASPHALTIC PROTECTION BOARD (N) WATERPROOFING SYSTEM INSTALLED OVER THE CLEANED AND PREPARED CONCRETE CURB TURN (N) FILTER FABRIC UP AT END TO CONTAIN SAND (E) DOOR TO REMAIN TERMINATE (N) WATERPROOFING SYSTEM WITH (N) 18" X 1" CONTINUOUS S.S. TERMINATION BAR; ANCHOR WITH 14" DIAM. FASTENERS AT 8" O.C.; SEAL TOP EDGE WITH LIQUID MEMBRANE REMOVE (E) WOOD TRIM AND INSTALL (N) SHEET METAL FLASHING WITH 12" HEMMED EDGES (N) POLYURETHANE SEALANT AND BACKER ROD AT JOINT BETWEEN (E) DOUBLE TEE AND FOUNDATION WALL (TYP.); SEE DETAIL 2/R-9 FOR TRANSITION OF WPM 6" MIN.REMOVE AND REINSTALL (E) DOOR THRESHOLD TO ALLOW FOR (N) METAL FLASHING INSTALLATION INSTALL (N) BEAD OF SILICONE JOINT SEALANT AT BASE OF THRESHOLD (N) TAPERED XPS INSULATION TO PROVIDE SLOPE FOR PAVERS TO DRAINS AS NECESSARY; SEE SHEET R-3 VARIES (N) 18" ASPHALTIC PROTECTION BOARD (N) PAVING ASSEMBLY; SEE DETAIL 1/R-7 TURN (N) FILTER FABRIC UP AT END TO CONTAIN SAND TERMINATE (N) WATERPROOFING INTO (N) REGLET AND INSTALL (N) 18" X 1" CONTINUOUS S.S. TERMINATION BAR; ANCHOR WITH 14" DIAM. FASTENERS AT 8" O.C.; SEAL TOP EDGE WITH LIQUID MEMBRANE (N) WATERPROOFING SYSTEM INSTALLED OVER THE CLEANED AND PREPARED DOUBLE TEE SURFACE (STAIR) (N) POLYURETHANE SEALANT AND BACKER ROD (E) TRAFFIC COATING TO REMAIN ON TOP OF FOUNDATION WALL (N) POLYURETHANE SEALANT AND BACKER ROD AT JOINT BETWEEN (E) DOUBLE TEE AND FOUNDATION WALL (TYP.); SEE DETAIL 2/R-9 FOR TRANSITION OF WPM EXTENT OF WARRANTY (N) TAPERED XPS INSULATION TO PROVIDE SLOPE FOR PAVERS TO DRAINS AS NECESSARY; SEE SHEET R-3 DEPTH VARIES (GARAGE) (N) 12" CONCRETE CURB TO BE CAST ON TOP OF (N) WP MEMBRANE, PROTECTION BOARD, AND DRAIN MAT; PLACE CONTROL JOINTS EQUALLY SPACED AT 4 FEET O.C. MAX. (N) POLYURETHANE SEALANT AND BACKER ROD; SEE DETAILS 4/R-8 AND 5/R-8 FOR TREATMENT OF JOINTS (N) PAVING ASSEMBLY; SEE DETAIL 1/R-7 INSTALL (N) #3 DOWELS AT 48" O.C. INTO THE (E) CONCRETE FOUNDATION WALL WITH HILTI HIT-HY 200 EPOXY (2" MIN. EMBEDMENT) (N) LINK-SEAL RECESSED 1" MIN.; SIZE TO BE DETERMINED BASED ON OUTLET PIPE DIAMETER; INSTALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS EXTEND (N) WP SYSTEM ONTO (N) PIPE 6" MIN. AND TERMINATE WITH (N) STAINLESS STEEL BAND CLAMP; SEE DETAIL 1/R-8 (N) OUTLET PIPE FOR PLAZA DRAIN PLUMBING; SIZE TO BE DETERMINED; TIE-IN TO (E) STORM SEWER WEST OF PLAZA 1'-0" VIF12" MIN.1" MIN. EXTEND (N) WP ASSEMBLY BELOW (N) PIPE 12" MIN. 6" MIN. (N) 1" DEEP NON-SHRINK EPOXY GROUT DETAIL (N) DOWEL WITH WATERPROOFING PRIOR TO PLACEMENT OF CONCRETE CURB (N) WATERPROOFING MEMBRANE TO BE CONTINUOUS UNDER CURB AND DOWN VERTICAL FACE OF FOUNDATION WALL 6" MIN. INSTALL (N) 18" PROTECTION BOARD BELOW CURB AND ON FOUNDATION WALL (E) PRECAST CONCRETE DOUBLE TEE; CLEAN AND PREPARE SURFACE TO RECEIVE (N) WPM (N) VERTICAL DRAIN MAT BELOW CONCRETE CURB AND ON FOUNDATION WALL TURN (N) FILTER FABRIC UP AT END TO CONTAIN SAND 1'-0" (E) WEST CONCRETE FOUNDATION WALL; CONTRACTOR TO VERIFY WIDTH AND MATCH (N) CONCRETE PERIMETER CURB WIDTH TO (E) WALL Sheet Scale BC&E No. AS NOTEDWATERPROOFING DETAILS - 1R-7 Date 1 SHEET R-7 TYPICAL PAVEMENT ASSEMBLY SCALE: 3" = 1'-0"Plotted: 4/4/2018 12:04 PM by: Sonja File Name: LSL - PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS.dwg 2 SHEET R-7 TYPICAL CONCRETE CURB DETAIL SCALE: 3" = 1'-0" 3 SHEET R-7 DRAIN DETAIL SCALE: 3" = 1'-0" 4 SHEET R-7 WP TERMINATION AT EXISTING EXPANSION JOINT SCALE: 1-1/2" = 1'-0" 5 SHEET R-7 WP TERMINATION AT STONE VENEER WALLS SCALE: 1-1/2" = 1'-0" 6 SHEET R-7 WP TERMINATION AT STUCCO BUILDING WALLS 1-1/2"=1'0" 7 SHEET R-7 WP AT DOOR THRESHOLD SCALE: 3" = 1'-0" 8 SHEET R-7 WP AT STAIR SCALE: 1-1/2" = 1'-0" 9 SHEET R-7 WP AT WEST FOUNDATION WALL SCALE: 1-1/2" = 1'-0" 16121 2/12/2018Sheet TitleProjectISSUED FOR PRICING 1/12/18PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS - LIONS SQUARE LODGE HOA1520 West Canal Court, Suite 240Littleton, Colorado 80120 303.350.1000 Tel | 303.350.1004 FaxISSUED FOR CONSTRUCTION 12/12/18REVISIONS FOR PERMITTING2 4/04/1804/13/18 (N) S.S. BAND CLAMP (N) 18" ASPHALTIC PROTECTION BOARD 6" CLEAR 4" MIN.(E) PIPE/VENT WITH DIAM. GREATER THAN OR EQUAL TO 1" (E) RIGID CONDUIT OR PIPE WITH DIAM. LESS THAN 1" NOTES: · SOME PIPE MATERIALS (COPPER, BRASS) MAY REQUIRE ROUGHENING/SANDING, IN ADDITION TO PRIMING WITH SURFACE CONDITIONER, FOR PROPER ADHESION OF WATERPROOFING. · METAL PIPES MUST BE FREE OF ALL OIL AND RUST. SOLVENT WIPE PIPES PRIOR TO INSTALLING (N) WPM. · DO NOT GANG PIPES TOGETHER, ALLOW 6" MIN. INCHES BETWEEN PIPE FOR DETAILING. · ALL PIPES MUST BE RIGIDLY CONNECTED THROUGH CONCRETE. DO NOT WATERPROOF TO NON-RIGID TUBING. (N) UNCURED NEOPRENE FLASHING (N) HOT, FLUID-APPLIED, FABRIC REINFORCED WP SYSTEM (N) S.S. BAND CLAMP STEP 1 STEP 2 OUTSIDE CORNER REINFORCEMENT COMPLETELY ENCAPSULATE ALL EXPOSED REINFORCING WITH A TOP COATING OF HOT-APPLIED WP. NO REINFORCING SHOULD BE LEFT EXPOSED OVERNIGHT. STEP 3COMPLETELY ENCAPSULATE ALL EXPOSED REINFORCING WITH A TOP COATING OF HOT-APPLIED WP. NO REINFORCING SHOULD BE LEFT EXPOSED OVERNIGHT. STEP 1 STEP 2 INTERIOR CORNER REINFORCEMENT STEP 3 (N) 1" MIN. THICKNESS MORTAR AT PLATES (IF EXIST) NOTES FOR BONDING PATCH MORTAR TO CONCRETE 1. PATCHING MORTAR TO BE POLYMER - MODIFIED PATCHING MORTAR F'c = 5000psi, SAND AGGREGATE 2. ROUGHEN SURFACE OF CONCRETE TO BE BONDED TO PATCH TO 18" MIN. AMPLITUDE 3. CONCRETE TO BE SATURATED, SURFACE-DRY AND CLEAN PRIOR TO PLACEMENT OF PATCHING MORTAR 4. SCRUB MORTAR INTO THE SURFACE AND COMPRESS PATCHING MORTAR INTO FORM 5. FINISH TO LIGHT AMPLITUDE AND CURE PER MANUFACTURE'S WRITTEN INSTRUCTIONS 6. INSTALLATION OF WP AFTER PATCH IS FULLY- CURED OR SUCCESSFULLY PASSES A MAT TEST 7. SOUND PATCH PRIOR TO INSTALLATION OF WP TO ENSURE PATCH IS FULLY BONDED. UN-BONDED PATCHES ARE NOT ACCEPTABLE AND SHALL BE REPLACED. RECESS GROUT TO PROVIDE SEALANT POCKET 1 1(N) BACKER ROD AND POLYURETHANE SEALANT BETWEEN PLATES (N) WATERPROOFING SYSTEM; REINFORCE ALL JOINTS WITH (N) UNCURED NEOPRENE FLASHING (PAVING ASSEMBLY NOT SHOWN) (N) 1" MIN. THICKNESS MORTAR AT PLATES (IF EXIST) PATCH MORTAR TO BOND TO PRECAST CONCRETE; ROUGHEN CONCRETE TO 18" AMPLITUDE TYP. AT PATCH MATERIAL; SEE NOTES AT DETAIL 3/R-8 (N) BACKER ROD AND SEALANT BETWEEN PLATES 1-1/2" MIN.1" MIN.(N) WATERPROOFING SYSTEM (PAVING ASSEMBLY NOT SHOWN) REINFORCE ALL JOINTS WITH (N) UNCURED NEOPRENE 3" MIN.112" MAX3" MIN. WHERE UNEVENNESS OCCURS BETWEEN PRECAST CONCRETE DOUBLE TEES AND IS 1 12" OR LESS, FILL JOINT WITH MORTAR TO CREATE A SMOOTH EVENLY SLOPED TRANSITION BETWEEN DOUBLE TEES (N) WATERPROOFING SYSTEM (PAVING ASSEMBLY NOT SHOWN) REINFORCE ALL JOINTS WITH (N) UNCURED NEOPRENE 1"(N) BACKER ROD AND JOINT SEALANT AT ALL JOINTS (TYP); AT UNEVEN JOINTS, RECESS BACKER ROD AND JOINT SEALANT 1" TO ALLOW FOR INSTALLATION OF GROUT 8" (N) Z-SHAPED SHEET-METAL FLASHING WITH 12" HEMMED DRIP EDGE; INSTALL BEHIND (E) STONE VENEER AND (N) CURB (E) SHED WALL TO REMAIN TERMINATE (N) WATERPROOFING WITH (N) 18" X 1" CONTINUOUS S.S. TERMINATION BAR; ANCHOR WITH 14" DIAM. FASTENERS AT 8" O.C.; SEAL TOP EDGE WITH LIQUID MEMBRANE (N) PAVING ASSEMBLY; SEE DETAIL 1/R-7 (N) CONCRETE CURB; INSTALL CONTROL JOINT IN LINE WITH EDGE OF FOUNDATION WALL REMOVE, SALVAGE, AND REINSTALL STONE VENEER TO ACCOMMODATE WATERPROOFING INSTALLATION (N) POLYURETHANE SEALANT AND BACKER ROD AT JOINT BETWEEN (E) DOUBLE TEE AND FOUNDATION WALL (TYP.) SEE DETAIL 5/R-8 FOR TREATMENT OF JOINTS (E) PRECAST DOUBLE TEE TO REMAIN; CLEAN AND PREPARE SURFACE TO RECEIVE (N) WPM (E) BOLLARD FOOTING TO REMAIN (E) SOUTH FOUNDATION WALL TO REMAIN (N) POLYURETHANE SEALANT CANT BEAD AROUND PERIMETER OF BOLLARD AND ALONG FLASHING AT SHED WALL (E) STEEL BOLLARD TO REMAIN; SOLVENT WIPE BASE PRIOR TO (N) WPM INSTALLATION (N) WATERPROOFING SYSTEM, PROTECTION BOARD, AND DRAINAGE MAT TO BE CONTINUOUS UNDER (N) CONCRETE CURB DETAIL (N) DOWEL WITH WATERPROOFING PRIOR TO PLACEMENT OF CONCRETE CURB INSTALL (N) #3 DOWELS AT 48" O.C. INTO THE (E) CONCRETE WITH HILTI HIT-HY 200 EPOXY (2" MIN. EMBEDMENT) 6"4"(N) 12" ISOLATION JOINT WITH COMPRESSIBLE FILLER AROUND (E) BOLLARD DETAIL (N) DOWEL WITH WATERPROOFING PRIOR TO PLACEMENT OF CONCRETE CURB (N) PAVEMENT ASSEMBLY; SEE DETAIL 1/R-7 (N) SNOW-MELT SYSTEM (N) WATERPROOFING MEMBRANE TO BE CONTINUOUS BELOW (N) CONCRETE CURB INSTALL (N) #3 DOWELS AT 48" O.C. INTO THE (E) CONCRETE WITH HILTI HIT-HY 200 EPOXY (1-1/2" MIN. EMBEDMENT) INSTALL (N) 18" ASPHALTIC PROTECTION BOARD BELOW (N) CONCRETE CURB 12" MIN. (N) 6" CONCRETE CURB TO BE CAST ON TOP OF (N) WP MEMBRANE AND PROTECTION BOARD; PLACE CONTROL JOINTS EQUALLY SPACED AT 4 FEET O.C. MAX. (E) PRECAST CONCRETE PLANKS; CLEAN AND PREPARE SURFACE TO RECEIVE (N) WPM INSTALL (N) POLYURETHANE SEALANT AND BACKER ROD AT ALL JOINTS BETWEEN (E) PRECAST CONCRETE PLANKS; SEE DETAIL 5/R-8 FOR TREATMENT OF JOINTS EXTEND (N) WATERPROOFING MEMBRANE BEYOND CONCRETE CURB 18" AS SHOWN; INSTALL (N) 18" X 1" CONTINUOUS S.S. TERMINATION BAR 12" BEYOND CURB AND ANCHOR WITH 14" DIAM. FASTERNERS AT 8" O.C.; SEAL TOP EDGE WITH LIQUID MEMBRANE (TYP).; INSTALL NEW REGLET BEYOND TERMINATION BAR AS SHOWN PRIOR TO INSTALLATION OF WPM (N) COMPRESSIBLE FILLER BETWEEN (N) CURB AND (N) ASPHALT REPLACE (E) ASPHALT DRIVE LANE OR LANDSCAPING IN KIND 6" 6" MIN. EXTENT OF WARRANTY (N) PAVEMENT ASSEMBLY; SEE DETAIL 1/R-7 (N) 16" CONCRETE CURB; PLACE CONTROL JOINTS EQUALLY SPACED AT 4 FEET O.C. MAX. (N) POLYURETHANE SEALANT AND BACKER ROD; SEE DETAILS 4/R-8 AND 5/R-8 FOR TREATMENT OF JOINTS INSTALL (N) #3 DOWELS AT 48" O.C. INTO THE (E) CONCRETE FOUNDATION WALL WITH HILTI HIT-HY 200 EPOXY (2" MIN. EMBEDMENT) (E) PRECAST CONCRETE PLANK; CLEAN AND PREPARE SURFACE TO RECEIVE (N) WPM (E) CONCRETE FOUNDATION WALL; CLEAN AND PREPARE SURFACE TO RECEIVE (N) WPM (E) PRECAST CONCRETE DOUBLE TEE; CLEAN AND PREPARE SURFACE TO RECEIVE (N) WPM (N) SNOW-MELT SYSTEM TO BE CONTINUOUS THROUGH CONCRETE CURB 2" MIN.DETAIL (N) DOWEL WITH WATERPROOFING PRIOR TO PLACEMENT OF CONCRETE CURB (N) DRAIN MAT, 18" ASPHALTIC PROTECTION BOARD, AND WATERPROOFING MEMBRANE TO BE CONTINUOUS UNDER (N) CONCRETE CURB 1'-4" (N) 6" CONCRETE CURB TO BE CAST ON TOP OF (N) WP MEMBRANE AND PROTECTION BOARD; PLACE CONTROL JOINTS EQUALLY SPACED AT 4 FEET O.C. MAX. INSTALL ADDITIONAL LAYER OF WP MEMBRANE AT CONCRETE CURB; TERMINATE (N) WATERPROOFING INTO (N) REGLET AND LAP 6" MIN. ONTO (N) WP MEMBRANE ON DOUBLE TEE (N) POLYURETHANE SEALANT AND BACKER ROD; SEE DETAILS 4/R-8 AND 5/R-8 FOR TREATMENT OF JOINTS (N) PAVING ASSEMBLY; SEE DETAIL 1/R-7 INSTALL (N) #3 DOWELS AT 48" O.C. INTO THE (E) CONCRETE FOUNDATION WALL WITH HILTI HIT-HY 200 EPOXY (2" MIN. EMBEDMENT) DETAIL (N) DOWEL WITH WATERPROOFING PRIOR TO PLACEMENT OF CONCRETE CURB (N) VERTICAL DRAIN MAT ON FOUNDATION WALL (N) WATERPROOFING MEMBRANE TO BE CONTINUOUS UNDER CURB AND EXTEND DOWN VERTICAL FACE OF FOUNDATION WALL A MINIMUM OF 2'-0"; LAP OVER (E) WPM A MINIMUM OF 6" (IF EXISTS) 6" MIN. INSTALL (N) 18" PROTECTION BOARD BELOW CURB AND ON FACE OF FOUNDATION WALL (E) NORTH CONCRETE FOUNDATION WALL; CONTRACTOR TO VERIFY WIDTH AND MATCH (N) CONCRETE PERIMETER CURB WIDTH TO (E) WALL; CLEAN AND PREPARE SURFACE TO RECEIVE (N) WPM 2'-0" MIN.(E) PRECAST CONCRETE DOUBLE TEE; CLEAN AND PREPARE SURFACE TO RECEIVE (N) WPM 6" VIF 6" Sheet Scale BC&E No. AS NOTEDWATERPROOFING DETAILS - 2R-8 Date 1 SHEET R-8 WP AT PENETRATIONS NOT TO SCALE Plotted: 4/4/2018 12:04 PM by: Sonja File Name: LSL - PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS.dwg 2 SHEET R-8 WP AT CORNERS NOT TO SCALE 3 SHEET R-8 WP TRANSITION AT WALL W/ WELD PLATE NOT TO SCALE 4 SHEET R-8 WP AT INVERTED TEE WELD PLATE NOT TO SCALE 5 SHEET R-8 WP AT JOINT OFFSET NOT TO SCALE 6 SHEET R-8 WP AT BOLLARDS AND SHED WALL SCALE: 1-1/2" = 1'-0" 7 SHEET R-8 WP AT EDGE OF PLAZA OVER TUNNEL SCALE: 1-1/2" = 1'-0" 8 SHEET R-8 WP AT GARAGE AND TUNNEL INTERFACE SCALE: 1-1/2" = 1'-0" 9 SHEET R-8 WP AT NORTH FOUNDATION WALL SCALE: 1-1/2"=1'-0" 16121 2/12/2018Sheet TitleProjectISSUED FOR PRICING 1/12/18PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS - LIONS SQUARE LODGE HOA1520 West Canal Court, Suite 240Littleton, Colorado 80120 303.350.1000 Tel | 303.350.1004 FaxISSUED FOR CONSTRUCTION 12/12/18REVISIONS FOR PERMITTING2 4/04/1804/13/18 (E) PRECAST CONCRETE INVERTED L-BEAM; CLEAN AND PREPARE SURFACE TO RECEIVE (N) WPM 6" 2'-2"1'-0"2'-2 1/2"(N) HEEL PROOF DRAIN GRATE (N) S.S. THREADED RODS WITH (3) S.S. NUTS FOR EACH ROD WRAP RISER WITH FILTER FABRIC EXTEND (N) WATERPROOFING MEMBRANE AND REINFORCING INTO DRAIN BODY AND SECURE WITH CLAMPING RING (N) ZURN Z158-85 BI-LEVEL DRAIN WITH PERFORATED DRAIN EXTENSION; TOP OF DRAIN TO BE AT OR BELOW THE ELEVATION OF THE ADJACENT CONCRETE FILL ANNULAR SPACE UNDER DRAIN FLANGE SOLID WITH NON-SHRINK GROUT (E) PRECAST CONCRETE DOUBLE TEE; CLEAN AND PREPARE SURFACE TO RECEIVE (N) WPM SLOPE (N) CONCRETE CURBS INTERSECTING AT DRAIN; (N) SNOW-MELT TUBING TO BE CONTINUOUS THROUGH CURBS 3'-0" SLOPE (N) POLYURETHANE JOINT SEALANT AND BACKER ROD; SEE DETAIL 4/R-8 FOR TREATMENT OF JOINTS INSTALL (N) #3 DOWELS AT 48" O.C. INTO THE (E) CONCRETE AND AT (E) INVERTED TEE BEAM WITH HILTI HIT-HY 200 EPOXY (1-1/2" MIN. EMBEDMENT); DO NOT DAMAGE EMBEDDED PT TENDONS DETAIL (N) DOWEL WITH WATERPROOFING PRIOR TO PLACEMENT OF CONCRETE CURBS 1.5" MIN.INSTALL CONTROL JOINTS IN (N) CONCRETE CURBS AT 48" O.C. MIN. (TYP.); IN ADDITION, INSTALL CONTROL JOINTS AT JOINTS BETWEEN INVERTED TEE BEAM AND DOUBLE TEES AND AT DECORATIVE ELEMENT AROUND DRAINS (N) POLYURETHANE JOINT SEALANT AND BACKER ROD (N) UNCURED NEOPRENE FLASHING AT ALL CORNER TRANSITIONS (N) 18" ASPHALTIC PROTECTION BOARD (N) HOT, FLUID-APPLIED, FABRIC REINFORCED WP MEMBRANE 3" MIN.3" MIN. Sheet Scale BC&E No. AS NOTEDWATERPROOFING DETAILS - 3R-9 Date 1 SHEET R-9 WP AT PENETRATIONS SCALE: 1-1/2" = 1'-0"Plotted: 4/4/2018 12:04 PM by: Sonja File Name: LSL - PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS.dwg 2 SHEET R-9 WP TRANSITION AT CORNERS NOT TO SCALE 16121 2/12/2018Sheet TitleProjectISSUED FOR PRICING 1/12/18PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS - LIONS SQUARE LODGE HOA1520 West Canal Court, Suite 240Littleton, Colorado 80120 303.350.1000 Tel | 303.350.1004 FaxISSUED FOR CONSTRUCTION 12/12/18REVISIONS FOR PERMITTING2 4/04/1804/13/18