Loading...
HomeMy WebLinkAboutB18-0066_04.R-3_1523647551.pdfEXISTING ENTRANCE DRIVE LANE; REPAIR ASPHALT REMOVED DURING WATERPROOFING REPAIRS REINSTALL SALVAGED STONE VENEER FOLLOWING COMPLETION OF WP REPAIRS; DO NOT DAMAGE EXISTING RAILING (TYP.) INSTALL NEW SNOW-MELTED PAVEMENT ASSEMBLY (DETAIL 1/R-7) OVER TUNNEL STRUCTURE NOTE: CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS PRIOR TO ORDERING MATERIALS AND STARTING WORK. REINSTALL OR REPLACE EXISTING LANDSCAPING AND PAVEMENT (INCLUDING LARGE LANDSCAPING STONES) AT NORTH PERIMETER WALL OF THE GARAGE FOLLOWING COMPLETION OF WATERPROOFING REPAIRS EXISTING MECHANICAL SHED TO REMAIN; DO NOT DAMAGE EXISTING EXIT DRIVE LANE; REPAIR 4' SECTION OF CONCRETE REMOVED DURING WATERPROOFING REPAIRS INSTALL (N) SNOW-MELT TUBING EMBEDDED IN SAND SETTING BED SUPPORTED ON WELDED-WIRE FABRIC OVER (E) WP SYSTEM; REINSTALL SALVAGED PAVERS FOLLOWING REPAIRS INSTALL NEW SNOW-MELTED PAVEMENT ASSEMBLY (DETAIL 1/R-7) SLOPED TO NEW DRAIN LOCATIONS INSTALL NEW BI-LEVEL ZURN Z158-85 DRAIN WITH PERFORATED DRAIN EXTENSION (TYP.) TIE-IN NEW DRAIN PIPE TO EXISTING STORM SEWER AND BACKFILL TRENCH FOLLOWING REPAIRS EXTERIOR FOUNDATION WALL BELOW (TYP.) INSTALL NEW CONCRETE SIDEWALK FOLLOWING COMPLETION OF WATERPROOFING REPAIRS; PROVIDE OPTION TO SNOW-MELT SIDEWALK REINSTALL SALVAGED STONE VENEER FOLLOWING COMPLETION OF WATERPROOFING REPAIRS REINSTALL SALVAGED STONE VENEER FOLLOWING COMPLETION OF WP REPAIRS; DO NOT DAMAGE EXISTING RAILING (TYP.) INSTALL (N) POLYURETHANE JOINT SEALANT AND BACKER ROD BETWEEN FLANGES OF ALL (E) DOUBLE TEE BEAMS AND ALONG LENGTH OF INVERTED TEE BEAM (BOTH SIDES) (TYP.); SEE DETAILS 4/R-8, 5/R-8 AND 2/R-9 FOR TREATMENT OF JOINTS INSTALL (N) POLYURETHANE JOINT SEALANT AND BACKER ROD AT JOINT BETWEEN ENDS OF (E) DOUBLE TEE BEAMS AND NORTH, SOUTH, AND WEST FOUNDATION WALLS (TYP.) INSTALL (N) POLYURETHANE JOINT SEALANT AND BACKER ROD AT JOINTS BETWEEN (E) PRECAST CONCRETE PLANKS AT TUNNEL; NUMBER AND LOCATION OF JOINTS TO BE FIELD VERIFIED; SEE DETAIL 5/R-8 9 R-8 7 R-8 9 R-7 SIM. 6 R-8 1 R-7 TYP. 8 R-8 5 R-7 5 R-7 5 R-7 3 R-7 1 R-9 3 R-7 SIM. 4 R-7 7 R-7 6 R-7 8 R-7 BENCHMARK CENTERED ON TOP OF WALL EL: 100.00' MATCH EXISTING FINISH EL: 97.18' MATCH EXISTING FINISH EL: 97.22' MATCH EXISTING FINISH EL: 95.82' MATCH EXISTING FINISH EL: 96.82' MATCH EXISTING FINISH EL: 96.37' MATCH EXISTING FINISH EL: 96.46' MATCH EXISTING FINISH EL: 95.87' NEW FINISH EL: 97.0' NEW FINISH EL: 96.4' NOTE: THE STRUCTURAL LEVEL IS SLOPED FROM THE NORTH AND SOUTH EDGES OF THE PARKING LOT TOWARDS THE INVERTED T-BEAM AND FROM THE EAST END TOWARD THE WEST END OF PARKING LOT 4'-0"INSTALL NEW EXTRUDED POLYSTYRENE (XPS) RIGID FOAM INSULATION ON TOP OF NEW WP MEMBRANE TO PROVIDE SLOPE FOR PAVERS; STARTING AT SOUTH WALL, INSTALL XPS INSULATION 4 INCHES IN THICKNESS TAPERING TO ZERO AT 4 FEET FROM THE INVERTED TEE BEAM (COMPRESSIVE STRENGTH OF XPS TO BE 100 PSI) MATCH EXISTING FINISH EL: 96.92' MATCH EXISTING FINISH EL: 97.53' EXISTING INVERTED TEE BEAM BELOW 9 R-7 (E) STORM SEWER PIPE( E ) S T O R M S EW E R PI P E (E) SAND/OIL 8" DIAM. PIPE (E) STORM SEWER PIPE(E) SAND/OIL INTERCEPTOR (E) RIM NORTH EL. = 8115.6' TYP. TYP. SIM. -TOP OF (E) STRUCTURE: 96.54'* -TOP OF (N) DRAIN FINISH EL: 96.95' -TOP OF (E) STRUCTURE: 95.93'* -TOP OF (N) DRAIN FINISH EL: 96.35'-TOP OF (E) STRUCTURE: 95.22'* -TOP OF (N) DRAIN FINISH EL: 95.64' 4.5" OF XPS INSULATION; TAPER TO ZERO AT DRAINS4.5" OF XPS INSULATION; TAPER TO ZERO AT DRAINS 4" OF XPS INSULATION 0" OF XPS INSULATION 3" OF XPS INSULATION 3" OF XPS INSULATION *NOTE: ELEVATIONS AT TOP OF STRUCTURE ARE ESTIMATED BASED ON LIMITED CORES TAKEN FROM THE EXISTING TOPPING SLAB. ELEVATIONS MAY NEED ADJUSTED ONCE TOPPING SLAB IS REMOVED TO REFLECT ACTUAL CONDITIONS.3'-0"(E) 8" INV EL. = 8107.00' (E) 8" INV EL. = 8107.71' (E) MANHOLE, RIM EL. = 8123.85' PROPOSED (N) TIE-IN EL: 8119' 32' VIF Sheet Scale BC&E No. AS NOTED 16121PLAZA LEVEL DRAINAGE AND REPAIR PLANR-3 2/12/2018 Date Plotted: 2/13/2018 11:29 PM by: Sonja File Name: LSL - PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS.dwgR-3 SHEET 1 NEW PLAZA DRAINAGE AND REPAIR PLAN SCALE: 1/8" = 1'-0"Sheet TitleProjectISSUED FOR PRICING 1/12/18PLAZA WATERPROOFING AND GARAGE STRUCTURALREPAIRS - LIONS SQUARE LODGE HOA1520 West Canal Court, Suite 240Littleton, Colorado 80120 303.350.1000 Tel | 303.350.1004 FaxISSUED FOR CONSTRUCTION 1 2/12/18A A A A A A A A A A A A AA C2lT~/—\C2__ / · — — \ C > /·—\C> zv A N f s'*9 52698 fSP.2-/11/ u d u PQ 04/13/18