Loading...
HomeMy WebLinkAboutB18-0066_09.R-7_1523647544.pdf(N) INTERLOCKING PAVERS (N) SNOW-MELT TUBING EMBEDDED IN SAND SETTING BED SUPPORTED ON WELDED-WIRE FABRIC (N) SAND SETTING BED (N) FILTER FABRIC (N) 12" DRAINAGE MAT (N) 18" ASPHALTIC PROTECTION BOARD (N) HOT, FLUID-APPLIED, FABRIC REINFORCED WATERPROOFING SYSTEM (E) PRECAST CONCRETE STRUCTURE; CLEAN AND PREPARE SURFACE TO RECEIVE (N) WPM5" MIN.DETAIL (N) DOWEL WITH WATERPROOFING PRIOR TO PLACEMENT OF CONCRETE CURB (N) 16" CONCRETE CURB TO BE CAST ON TOP OF (N) WP MEMBRANE, PROTECTION BOARD, AND DRAINAGE MAT; PLACE CONTROL JOINTS EQUALLY SPACED AT 4 FEET O.C. MAX. (N) PAVEMENT ASSEMBLY; SEE DETAIL 1/R-7 (N) SNOW-MELT SYSTEM (N) WATERPROOFING MEMBRANE TO BE CONTINUOUS BELOW (N) CONCRETE CURB; CLEAN AND PREPARE SURFACE OF (E) CONCRETE TO RECEIVE (N) WPM INSTALL (N) #3 DOWELS AT 48" O.C. INTO THE (E) CONCRETE WITH HILTI HIT-HY 200 EPOXY (1-1/2" MIN. EMBEDMENT) 16" (N) 18" ASPHALTIC PROTECTION BOARD TO BE CONTINUOUS UNDER (N) CONCRETE CURB (N) DRAIN MAT TO BE CONTINUOUS UNDER CURB 1.5" MIN.(N) HEEL PROOF DRAIN GRATE (N) S.S. THREADED RODS WITH (3) S.S. NUTS FOR EACH ROD WRAP RISER WITH FILTER FABRIC EXTEND (N) WATERPROOFING MEMBRANE AND REINFORCING INTO DRAIN BODY AND SECURE WITH CLAMPING RING (N) ZURN Z158-85 BI-LEVEL DRAIN WITH PERFORATED DRAIN EXTENSION; TOP OF DRAIN TO BE AT OR BELOW THE ELEVATION OF THE ADJACENT CONCRETE FILL ANNULAR SPACE UNDER DRAIN FLANGE SOLID WITH NON-SHRINK GROUT (E) PRECAST CONCRETE DOUBLE TEE; CLEAN AND PREPARE SURFACE TO RECEIVE NEW WPM SLOPE (N) CONCRETE CURBS INTERSECTING AT DRAINS DETAIL (N) DOWEL WITH WATERPROOFING PRIOR TO PLACEMENT OF CONCRETE CURBS INSTALL (N) #3 DOWELS AT 48" O.C. INTO THE (E) CONCRETE WITH HILTI HIT-HY 200 EPOXY (1-1/2" MIN. EMBEDMENT) INSTALL CONTROL JOINTS IN (N) CONCRETE CURBS AT 48" O.C. MIN. (TYP.); IN ADDITION, INSTALL CONTROL JOINTS AT JOINTS BETWEEN INVERTED TEE BEAM AND DOUBLE TEES AND AT DECORATIVE ELEMENT AROUND DRAINS (E) EXPANSION JOINT TO REMAIN; PROTECT FROM DAMAGE DURING COURSE OF WORK (E) CONCRETE CURB TO REMAIN (E) CONCRETE CURB TO REMAIN (E) NON SNOW-MELTED PAVER SYSTEM; REMOVE AND SALVAGE BAND OF BRICK PAVERS AND BRICK PAVERS BETWEEN BAND AND EXPANSION JOINT TERMINATE (N) WATERPROOFING INTO (N) REGLET AND INSTALL (N) 18" X 1" CONTINUOUS S.S. TERMINATION BAR; ANCHOR WITH 14" DIAM. FASTENERS AT 8" O.C.; SEAL TOP EDGE WITH LIQUID MEMBRANE (N) PAVEMENT ASSEMBLY; SEE DETAIL 1/R-7 INSTALL (N) SNOW-MELT TUBING EMBEDDED IN SAND SETTING BED SUPPORTED ON WELDED-WIRE FABRIC OVER (E) WP SYSTEM; REINSTALL SALVAGED PAVERS FOLLOWING REPAIRS EXTENT OF WARRANTY (E) CONCRETE WALL TO REMAIN TERMINATE (N) WATERPROOFING WITH (N) 18" X 1" CONTINUOUS S.S. TERMINATION BAR; ANCHOR WITH 14" DIAM. FASTENERS AT 8" O.C.; SEAL TOP EDGE WITH LIQUID MEMBRANE (N) Z-SHAPED SHEET-METAL FLASHING WITH 12" HEMMED DRIP EDGE; INSTALL BEHIND (N) PAVERS (N) 18" ASPHALTIC PROTECTION BOARD (N) PAVING ASSEMBLY; SEE DETAIL 1/R-7 (N) WATERPROOFING SYSTEM INSTALLED OVER THE TOP SURFACE OF THE CLEANED, AND PREPARED CONCRETE WALL SURFACE REINSTALL SALVAGED STONE VENEER 8" MIN.2" MIN. TURN (N) FILTER FABRIC UP AT END TO CONTAIN SAND (E) PRECAST CONCRETE STRUCTURE TO REMAIN; CLEAN AND PREPARE SURFACE TO RECEIVE (N) WPM (N) POLYURETHANE SEALANT AND BACKER ROD AT JOINT BETWEEN (E) DOUBLE TEE AND FOUNDATION WALL (TYP.); SEE DETAIL 2/R-9 FOR TRANSITION OF WPM (N) TAPERED XPS INSULATION TO PROVIDE SLOPE FOR PAVERS TO DRAINS AS NECESSARY; SEE SHEET R-3 DEPTH VARIES (E) CONCRETE WALL TO REMAIN TERMINATE (N) WATERPROOFING SYSTEM WITH (N) 18" X 1" CONTINUOUS S.S. TERMINATION BAR; ANCHOR WITH 14" DIAM. FASTENERS AT 8" O.C.; SEAL TOP EDGE WITH LIQUID MEMBRANE (N) Z-SHAPED SHEET-METAL FLASHING WITH 12" HEMMED DRIP EDGE; INSTALL BEHIND (N) PAVERS (N) 18" ASPHALTIC PROTECTION BOARD (N) PAVING ASSEMBLY; SEE DETAIL 1/R-7 (N) WATERPROOFING SYSTEM INSTALLED OVER THE TOP SURFACE OF THE CLEANED, AND PREPARED CONCRETE WALL SURFACE SAWCUT (E) STUCCO; SALVAGE (E) LATH TO PROVIDE A 12" MIN. OVERLAP OF (N) AND (E) METAL LATH; REPAIR STUCCO FOLLOWING COMPLETION OF WP REPAIRS 2" MIN.8" MIN.TURN (N) FILTER FABRIC UP AT END TO CONTAIN SAND (N) WRB; LAP OVER TOP LEG OF (N) SHEET METAL FLASHING; SECURE WITH PLASTIC CAPPED NAILS AT 8" O.C. (E) WEATHER RESISTIVE BARRIER (WRB); PROVIDE 12" LAP OF (E) WRB OVER (N) WRB (E) PRECAST CONCRETE STRUCTURE TO REMAIN 24"+/-(N) POLYURETHANE SEALANT AND BACKER ROD AT JOINT BETWEEN (E) DOUBLE TEE AND FOUNDATION WALL (TYP.); SEE DETAIL 2/R-9 FOR TRANSITION OF WPM (N) TAPERED XPS INSULATION TO PROVIDE SLOPE FOR PAVERS TO DRAINS AS NECESSARY; SEE SHEET R-3 DEPTH VARIES (E) PRECAST CONCRETE STRUCTURE TO REMAIN; CLEAN AND PREPARE SURFACE TO RECEIVE (N) WPM INSTALL NEW PAVING ASSEMBLY; SEE DETAIL 1/R-7 (INTERIOR) (N) 18" ASPHALTIC PROTECTION BOARD (N) WATERPROOFING SYSTEM INSTALLED OVER THE CLEANED AND PREPARED CONCRETE CURB TURN (N) FILTER FABRIC UP AT END TO CONTAIN SAND (E) DOOR TO REMAIN TERMINATE (N) WATERPROOFING SYSTEM WITH (N) 18" X 1" CONTINUOUS S.S. TERMINATION BAR; ANCHOR WITH 14" DIAM. FASTENERS AT 8" O.C.; SEAL TOP EDGE WITH LIQUID MEMBRANE REMOVE (E) WOOD TRIM AND INSTALL (N) SHEET METAL FLASHING WITH 12" HEMMED EDGES (N) POLYURETHANE SEALANT AND BACKER ROD AT JOINT BETWEEN (E) DOUBLE TEE AND FOUNDATION WALL (TYP.); SEE DETAIL 2/R-9 FOR TRANSITION OF WPM 6" MIN.REMOVE AND REINSTALL (E) DOOR THRESHOLD TO ALLOW FOR (N) METAL FLASHING INSTALLATION INSTALL (N) BEAD OF SILICONE JOINT SEALANT AT BASE OF THRESHOLD (N) TAPERED XPS INSULATION TO PROVIDE SLOPE FOR PAVERS TO DRAINS AS NECESSARY; SEE SHEET R-3 VARIES (N) 18" ASPHALTIC PROTECTION BOARD (N) PAVING ASSEMBLY; SEE DETAIL 1/R-7 TURN (N) FILTER FABRIC UP AT END TO CONTAIN SAND TERMINATE (N) WATERPROOFING INTO (N) REGLET AND INSTALL (N) 18" X 1" CONTINUOUS S.S. TERMINATION BAR; ANCHOR WITH 14" DIAM. FASTENERS AT 8" O.C.; SEAL TOP EDGE WITH LIQUID MEMBRANE (N) WATERPROOFING SYSTEM INSTALLED OVER THE CLEANED AND PREPARED DOUBLE TEE SURFACE (STAIR) (N) POLYURETHANE SEALANT AND BACKER ROD (E) TRAFFIC COATING TO REMAIN ON TOP OF FOUNDATION WALL (N) POLYURETHANE SEALANT AND BACKER ROD AT JOINT BETWEEN (E) DOUBLE TEE AND FOUNDATION WALL (TYP.); SEE DETAIL 2/R-9 FOR TRANSITION OF WPM EXTENT OF WARRANTY (N) TAPERED XPS INSULATION TO PROVIDE SLOPE FOR PAVERS TO DRAINS AS NECESSARY; SEE SHEET R-3 DEPTH VARIES (GARAGE) (N) 12" CONCRETE CURB TO BE CAST ON TOP OF (N) WP MEMBRANE, PROTECTION BOARD, AND DRAIN MAT; PLACE CONTROL JOINTS EQUALLY SPACED AT 4 FEET O.C. MAX. (N) POLYURETHANE SEALANT AND BACKER ROD; SEE DETAILS 4/R-8 AND 5/R-8 FOR TREATMENT OF JOINTS (N) PAVING ASSEMBLY; SEE DETAIL 1/R-7 INSTALL (N) #3 DOWELS AT 48" O.C. INTO THE (E) CONCRETE FOUNDATION WALL WITH HILTI HIT-HY 200 EPOXY (2" MIN. EMBEDMENT) (N) LINK-SEAL RECESSED 1" MIN.; SIZE TO BE DETERMINED BASED ON OUTLET PIPE DIAMETER; INSTALL IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS EXTEND (N) WP SYSTEM ONTO (N) PIPE 6" MIN. AND TERMINATE WITH (N) STAINLESS STEEL BAND CLAMP; SEE DETAIL 1/R-8 (N) OUTLET PIPE FOR PLAZA DRAIN PLUMBING; SIZE TO BE DETERMINED; TIE-IN TO (E) STORM SEWER WEST OF PLAZA 1'-0" VIF12" MIN.1" MIN. EXTEND (N) WP ASSEMBLY BELOW (N) PIPE 12" MIN. 6" MIN. (N) 1" DEEP NON-SHRINK EPOXY GROUT DETAIL (N) DOWEL WITH WATERPROOFING PRIOR TO PLACEMENT OF CONCRETE CURB (N) WATERPROOFING MEMBRANE TO BE CONTINUOUS UNDER CURB AND DOWN VERTICAL FACE OF FOUNDATION WALL 6" MIN. INSTALL (N) 18" PROTECTION BOARD BELOW CURB AND ON FOUNDATION WALL (E) PRECAST CONCRETE DOUBLE TEE; CLEAN AND PREPARE SURFACE TO RECEIVE (N) WPM (N) VERTICAL DRAIN MAT BELOW CONCRETE CURB AND ON FOUNDATION WALL TURN (N) FILTER FABRIC UP AT END TO CONTAIN SAND 1'-0" (E) WEST CONCRETE FOUNDATION WALL; CONTRACTOR TO VERIFY WIDTH AND MATCH (N) CONCRETE PERIMETER CURB WIDTH TO (E) WALL Sheet Scale BC&E No. AS NOTEDWATERPROOFING DETAILS - 1R-7 Date 1 SHEET R-7 TYPICAL PAVEMENT ASSEMBLY SCALE: 3" = 1'-0"Plotted: 2/13/2018 11:30 PM by: Sonja File Name: LSL - PLAZA WATERPROOFING AND GARAGE STRUCTURAL REPAIRS.dwg 2 SHEET R-7 TYPICAL CONCRETE CURB DETAIL SCALE: 3" = 1'-0" 3 SHEET R-7 DRAIN DETAIL SCALE: 3" = 1'-0" 4 SHEET R-7 WP TERMINATION AT EXISTING EXPANSION JOINT SCALE: 1-1/2" = 1'-0" 5 SHEET R-7 WP TERMINATION AT STONE VENEER WALLS SCALE: 1-1/2" = 1'-0" 6 SHEET R-7 WP TERMINATION AT STUCCO BUILDING WALLS 1-1/2"=1'0" 7 SHEET R-7 WP AT DOOR THRESHOLD SCALE: 3" = 1'-0" 8 SHEET R-7 WP AT STAIR SCALE: 1-1/2" = 1'-0" 9 SHEET R-7 WP AT WEST FOUNDATION WALL SCALE: 1-1/2" = 1'-0" 16121 2/12/2018Sheet TitleProjectISSUED FOR PRICING 1/12/18PLAZA WATERPROOFING AND GARAGE STRUCTURALREPAIRS - LIONS SQUARE LODGE HOA 1520 West Canal Court, Suite 240Littleton, Colorado 80120 303.350.1000 Tel | 303.350.1004 FaxISSUED FOR CONSTRUCTION 1 2/12/18*oo 6-lcK AE >I f41E >■i; · ·; MI5In ~ ~ ~ * ^ dP8A Jm't: ·. fev: ?ArBiIIE4i7 ~ =5? o v \ \ ■0\\ 4 \L- 3 \ 4 4\u \ \4\ \Xasssm\7 ■ 11' 111 · 11111 3 lp°o#o°o9te«^orccorcum u ^ 3 P 60LLC Q >oso2U ;C i aNOoo4.n'A 'i A>± hs v^>>As-/).>—"tfgFs04/13/18