Loading...
HomeMy WebLinkAboutB18-0119_Approved Plans_1524765152.pdf i / I II i oc II -NOD 11 I I / \ - // J e//////1//// / // / JI / / / / ' / / /7" 4 _11 4 7 _9 ^7/ // -r7-'1:. NSB / / / rr) i iN /////////// // / / 1 ///// / / �� ///// � I 4" 8'-4" Adela / , International Inc . // jam,,;°, ,/ / ,/ ,/ , � � �/ / y ////' 165 ( Remodel //ra , � �z -� � - ` i9 Vail Rd #30 Vail , CO 81657 -„ , dIn In * U U --I -_0, c ,,,. ]' 1 0 ' 4'-2" _ _ 4" -O U - i , — _V__I <DI -zp,No c\i 9'-5'' I I c, In S Tp. 2/,6\G 4'-9” 1 I 14'-2.5"D , — �^ New Bathroom to be added as I � part of renovation • CASAMILA 7n T Sar SUITE m.� i aim W . 0 to be centered in ,U„E NO a 30 " clear space Ld TV :. a" 1221 DROOV1 1 1 M K 14' 14'-2" L _ . 0 Date- 4-4-18 Scale 3/8" = 1 ' Provide smoke and carbonmonoxide detectors A1 . 0 throughout condo per code . J1 1 1 III Al-IJ Stamp ,,i Mechanical Specifications 4. 04/26/18 General FAN fi .'� ,` 0 7 - 0 SYM. DESCRIPTION MANUFACTURER QO �0 - -' ,`¢ 1. Immediately notify the Engineer of any discrepancies. CFM SP 6 SL W/A/HP VOLT SONES 4 MODEL NO. 4V ��Q q00 �0� 2. It shall be assumed that all subcontractors are experienced and thoroughly knowledgeable in their respective areas of the construction industry and shall , \ I perform in a responsible manner in an appropriate construction sequence. 3 D R V EF_ B�4TI-4 2 0.2S" 1S UJ 11S/1 0.5 5 PANASONIC NIC ( 7 . EXI-14UST Q5 3. D o not scale drawings. Verify dimensions in field prior to commencement of work. DAMPER: SUPPORT: DUCT CONNECTION: CONTROL: NI NI S I A. INTEGRAL GRAVITY RIGID SUPPORT A. RIGID ON/OFF WALL SWITCI-I BACKDRAFT DAMPER 2. HANG UNIT WITH NEOPRENE B. FLEX DUCT . r Z 4. It is the intent of these drawings and specifications to establish a standard of quality. The Engineer reserves the right to take exceptions to approve methods B. EXTERNAL GRAVITY ISOLATORS C. FLEXIBLE CANVAS DUCT c�1I and materials not reflected herein. BACKDRAFT DAMPER 3. FANG UNIT WITH SPRING CONNECTORS - i z INSTALLED AT FAN VIBRATION ISOLATORS D. FANTECH FC CLAMPS ral .... ELI - \I 111 I D I SCHARGE CO CO ill 5. Failure to order,or release order,for materials and/or equipment will not be accepted as a reason to substitute alternate materials, equipment, or installation C. MOTORIZED DAMPER i_. DVI a methods. < ^ D. NONE .� EQUALS: GREENHECK, LOREN COOK, SOLER 4 PALAU, TWIN CITY, FANTECH, RENEWAIRE, VENMAR, PANASONIC. (l) U tY 6. Work shall be performed in a workmanlike manner to the satisfaction of the Architect & the Engineer. T I �� v tS 1J K U U Ivl i I v I r� u I I z I:I 7. Labor,materials, and equipment shall conform to the latest applicable editions of local, State of Colorado,and National Codes and ordinances. If conflict i • ) > x between those publications exists, the most stringent requirement shall apply. tY / :,_ 0 < < 4 z 8. The drawings show the intent of the mechanical systems but do not show all details required. It is the responsibility of the Contractors to install complete B A I I - 0 oi '� z tu & operable systems, which conform to the manufacturers' installations instructions & industry standards. I I 1 I I I I W v I- ua 1 I2C E 00 iT) 9. Systems shall be tested for proper operation. If tests show work is defective, Contractor shall make corrections necessary at no cost to Owner. X/ `/I 1- BAT - z p X , 0 �; 10. It is the Contractors' and manufacturers' responsibility to assure themselves that the code authorities will approve any product to be installed on the project. B - D R _ _ \4 O a) a B 11. Offset piping, ductwork, etc. as necessary to accommodate structure, beams,columns,and existing equipment. i---- 6APAPb -elk 0I11HI' C Q Remodel, Demolition & Unforeseen Conditions } 0 12. In as much as design for remodel,renovation and/or rehabilitation requires that certain assumptions be made regarding existing conditions and because �, z 01 6 a some of these assumptions cannot be verified without destroying otherwise adequate or serviceable portions of the building, the Engineer cannot assure the PE Stamp A z Owner or the Contractor that the professional consulting services herein encompass all contingencies. Field coordination during construction is imperative. _ ,..,'�..Nwk4 ca 0 Contractors bidding this work must make reasonable allowances for unseen conditions and should include associated allowances in their bids noted as such. \ 9 1 '� 6 iii, `� u i 0 :,,pts�. h oe...fi,f 1 I- 0 13. Field verify locations of all existing piping,equipment, ductwork, etc. -L 4 4/3/18 I- ty dl 14. Be responsible to field verify existing equipment or ductwork remaining to be reconnected to new or existing systems. Provide ductwork, piping,controls, +�+�.9,..,, �,•' '' p diffusers, etc., as required to restore continuity to system(s). �, �� IIIc'' c.• 4.41-0°0 4�'°�a -` m 0 15. All existing support rods and straps now supporting ducts,pipes, air tubing,electrical conduit, etc. that are removed to allow room for installation of new 0_ 0 equipment shall be relocated and reinstalled, or replaced if damaged. T ' A S - al ty 16. Extend and modify existing fire protection systems to new and remodeled areas. - - - - J 0V I \ I \ y 1-m 17. New hot and cold water branches to be routed from nearest hot water and cold water of line size equal to or greater than new branch - typical. 0 EXISTING WASTE 4 VENT m Z STACKS. FIELD VERIFY Insulation LOCATION. z .4 N 18. Piping Insulation Schedule: V V ? - 121 rl >>- d Service Thickness (in.) 00z Domestic Hot Water 1.0 F Domestic Cold Water 0.5 EXISTING WATER SERVICE T B _ O v '- RISERS. FIELD VERIFY O c() Piping insulation shall be U.L. approved,white, all service,glass fiber, snap-on,pipe insulation. Insulate fittings with glass fiber blanket insulation and LOCATION. I IP premolded PVC covers. Provide deduct alternate price to insulate with Armaflex closed cell foam insulation. 1g Ill -4 ) 1 •/ii: 11 -- Z iu•"--- LU NPiping :� i a / i I- 0 19. D omesticHot, Cold & Recirculation piping inside building- Type 'L' copper water tube,wrought copper fittings and no lead solder. I O 1 iu 0U _ 20. Waste and vent piping - Standard weight,C.I. soil pipe, and fittings, or hubless, C.I. soil pipe and fittings. Up through 2-1/2" � maybe standard weight, _ I _ galvanized steel pipe with black,C.I. drainage fittings. I `"I 1 tY ii at ROUTE VENT, 3/4" DI-IW, AND .I 21. Copper pipe Valves and Specialties: 3/4" DCW PIPING ABOVE I z in CEILING. VERIFY EXACT 1 - '6 IL tu IX Gate Valves: Bronze,Class 125, 200 lb. W.O.G. ROUTING IN FIELD. H .. c A Ball Valves: Bronze,Class 125, 200 lb. W.O.G. ROUTE WASTE PIPING FROM O 1- ---- .z, i w Check Valves: Bronze, _ -LAVATORY, SHOWER AND Class 125, 200 lb. W.O.G. \ _ 3 WATER CLOSET UNDER Balancing Valves: 125 psig w.p. for 250F service tight shut-off, Illinois dual-purpose, balancing/shut-off valve,Hoffman, Sarco,or equivalent. - -FLOOR (UF). VERIFY EXACT o MP, `i m O ROUTING IN FIELD. I "4 0 22. Support pipe with rod and clevis or clamps. No pipe tape allowed. 1 EF 1 _ 0 4 0 �� BA-[/77.71- - 0_ Z 23.The piping material shall be cast iron at all pipepenetrations of fire-rated assemblies. • 'Ai �, 4"� I 0_ �7 pp g pp O I- I. / \ 4 FK JI I Issued For Z � 24. Install plumbing clean-outs as required by applicable codes. No. Date Comment w 0_ I * (T 1 4/3/1S PERMIT B 25. Seal annular space of all piping penetrations through fire-rated assemblies with approved fire caulk/ sealant (3M, Hilti or approved equal). /� B A R CASAMILAN❑ \ / • O Z Ductwork = SUITE _ _ V 1 E • TV E TERMINATE A MINIMUM OF 3' FROM AN OPERABLE WINDOW. N 0 26.Duct sizes shown on drawings are outside (sheet metal)duct dimensions. 4 0 4 to 0_ t_ 27. All ductwork shall be sealed airtight with duct mastic. Where duct tape is used,it shall be listed and labeled in accordance with UL 181. T1-11 RD FLOOR 1u w MEGI-1�NIG�L PLAN i W z 28. Seal all ductwork joints and vapor barrier penetrations at all exterior walls. CASAMILANI C SUITE E u1 d O W z 29. Provide backdraft dampers at all bath exhaust duct terminations. if y w 30.Sheet metal and fittings to be pursuant to SMACNA and ASHRAE standards. 0 Provide U listed assembles L. z 31. All ducts shall be 26 gauge minimum. Duct gauge and construction shall conform to SMACNA HVAC D uct Construction Standards. Ui tY ui for a l l floor penetrations Project No. Scale: o• z o 'l 3 1801&.00 1/4" _ V-011 0 l� (L/ , at roughplumbingins ection a Drawn By: ChckdBy:�J JSW JDR1111 = z ZZm • y M2. 3 = o0 O ua O 4 �0