Loading...
HomeMy WebLinkAboutS-0 General Notes24" o.c. 16" o.c. 16" o.c. 16d common 3" x 0.131" nail 3" 14 gage staple 23. Built-up corner studs 6d common nail 1 3/4 inch length for 25/32-inch sheathing. m. Staples shall have a minimum crown width of 7/16 inch. a. Common or box nails are permitted to be used except where otherwise stated. refer to Section 2305. Nails for wall sheathing are permitted to be common, box or casing. j. Casing or finish nails spaced 6 inches on panel edges, 12 inches at intermediate supports. l. For roof sheathing applications, 8d nails are the minimum required for wood structural panels inches on center at edges, 6 inches at intermediate supports for roof sheathing. p. Fasteners spaced 4 inches on center at edges, 8 inches at intermediate supports. For SI: 1 inch = 25.4mm. 2 3/8" x 0.113" nails and 3" x 0.131" nails are standard 8d and 10d Gun nails. g. Fasteners spaced 3 inches on center at exterior edges and 6 inches on center at intermediate supports. b. Nails spaced at 6 inches on center at edges, 12 inches at intermediate supports except 6 inches at supports where spans are 48 inches or more. For nailing of wood structural panel and particleboard diaphragms and shear walls, h. Corrosion-resistant roofing nails with 7/16-inch diameter head and 1 1/2 inch length for 1/2-inch sheathing and i. Corrosion-resistant staples with nominal 7/16-inch crown and 1 1/8 inch length for 1/2-inch sheathing and 1 1/2 inch length for 25/32-inch sheathing. Panel supports at 16 inches (20 inches if strength axis is the long direction of k. Panel supports as 24 inches. Casing or finish nails spaced 6 inches on panel edges, 12 inches at intermediate supports. n. For roof sheathing applications, fasteners spaced at 4 inches on center at edges, 8 inches at intermediate supports. o. Fasteners spaced 4 inches on center at edges, 8 inches at intermediate supports for subfloor and wall sheathing and 3 c. Common or deformed shank. f. Corrosion-resistant siding or casing nail. the panel, unless otherwise marked). d. Common e. Deformed shank. NOTES TO TABLE 2304.9.1 34. Interior paneling 25/32" No. 11 gage roofing nail 3/8" 1/4" No. 16 gage staple 8d common nail No. 16 gage staple i i 6d 4dj k h b (to framing): underlayment to framing): 32. Panel siding (to framing) Single Floor (combination subfloor- 33. Fiberboard sheathing: g 29. Joist to band joist Subfloor, roof and wall sheathing 31. Wood structural panels and particleboard: 30. Ledger strip 28. Roof rafter to 2-by ridge beam 27. Jack rafter to hip 24. Built-up girder and beams 26. Collar tie to rafter 25. 2" planks 1 3/4" x 16 gage 2 3/8" x 0.131" nail 2 3/8" x 0.131" nail 1/2" No. 11 gage roofing nail 1 1/8" to 1 1/4" 10d or 8d 1 1/8" to 1 1/4" 10d or 8d 7/8" to 1" 8d 5/8" 8d 1/2" or less 6d 19/32" to 3/4" 8d (per J&K) 7/8" to 1" 8d 3/4" and less 8d f d e f e 2" 16 gage c d e d e p 3 - 16d common 5 - 3" x 0.131" nail 5 - 3" 14 gage staple 3 - 16d common 4 - 3" x 0.131" nail 4 - 3" 14 gage staple 2 - 16d common 3 - 3" x 0.131" nail 3 - 3" 14 gage staple 1/2" and less 8d c,l h p face nail face nail face nail o n 3 - 10d common 4 - 3" x 0.131" nail 4 - 3" 14 gage staple face nail 2 - 16d common 3 - 3" x 0.131" nail 3 - 3" 14 gage staple 2 - 16d common 3 - 3" x 0.131" nail 3 - 3" 14 gage staple 3 - 10d common 4 - 3" x 0.131" nail 4 - 3" 14 gage staple 16d common 2 - 20d common 3 - 3" x 0.131" nail 3 - 3" 14 gage staple 20d common at 32" o.c. 3" x 0.131" nail at 24" o.c. 3" 14 gage staple at 24" o.c. face nail toenail toenail face nail at each bearing face nail at ends and at each splice face nail at top and bottom staggered on opposite sides 13. Top plates, laps and intersections 18. Ceiling joists to parallel rafters (See Section 2308.10.4.1, Table 2308.10.4.1) 22. Wider than 1" x 8" sheathing to each bearing wall 21. 1" x 8" sheathing to each bearing wall 20. 1" diagonal brace to each stud and plate 19. Rafter to plate (See Section 2308.10.1, Table 2308.10.1) 15. Ceiling joists to plate 16. Continuous header to stud 14. Continuous header, two pieces 17. Ceiling joists, laps over partions (See Section 2308.10.4.1, Table 2308.10.4.1) 12. Rim joist to top plate 11. Blocking between joist or rafters to top plate Double top plates 9. Double Studs 10. Double top plates 8. Stud to sole plate 2 - 16d common 3 - 3" x 0.131" nail 3 - 3" 14 gage staple 3 - 16d common minimum, Table 2308.10.4.1 4 - 3" x 0.131" nail 4 - 3" 14 gage staple 3 - 16d common minimum, Table 2308.10.4.1 4 - 3" x 0.131" nail 4 - 3" 14 gage staple 3 - 8d common 2 - 8d common 2 - 8d common 2 - 3" x 0.131" nail 2 - 3" 14 gage staple 3 - 8d common 3 - 3" x 0.131" nail 3 - 3" 14 gage staple 16d common 4 - 8d common 3 - 8d common 5 - 3" x 0.131" nail 5 - 3" 14 gage staple face nail face nail face nail toenail face nail face nail 16" o.c. along edge toenail toenail 8 - 16d common 12 - 3" x 0.131" nail 12 - 3" 14 gage staple typical face nail 16d at 16" o.c. 3" x 0.131" nail at 12" o.c. 3" 14 gage staple at 12" o.c. 3 - 8d common 3 - 3" x 0.131" nail 3 - 3" 14 gage staple 8d at 6" (152mm) o.c. 3" x 0.131" nail at 6" o.c. 3" 14 gage staple at 6" o.c. 2 - 16d common 3 - 3" x 0.131" nail 3 - 3" 14 gage staple 4 - 8d common 4 - 3" x 0.131" nail 3 - 3" 14 gage staple 16d at 24" o.c. 3" x 0.131" nail at 8" o.c. 3" 14 gage staple at 8" o.c. face nail lap splice toenail toenail end nail face nail typical face nail toenail IBC FASTENING SCHEDULE (TABLE 2304.9.1) 4. Wider than 1" x 6" subfloor to each joist 6. Sole plate to joist or blocking 5. 2" subfloor to joist or girder Sole plate to joist or blocking at braced wall panel 7. Top plate to stud 1. Joist to sill or girder 3. 1" x 6" subfloor or less to each joist CONNECTION 2. Bridging to joist 3 - 8d common 2 - 16d common 2 - 16d common 3 - 3" x 0.131" nail 3 - 3" 14 gage staple 16d at 16" o.c. 3" x 0.131" nail at 8" o.c. 3" 14 gage staple at 12" o.c. 3 - 16d per 16" (4)-3" x 0.131" nail per 16" (4)-3" 14 gage staple per 16" 2 - 8d common 3 - 8d common 3 - 3" x 0.131" nail 3 - 3" 14 gage staple 2 - 8d common 2 - 3" x 0.131" nail 2 - 3" 14 gage staple FASTENING a, m face nail end nail typical face nail blind and face nail braced wall panels face nail toenail each end LOCATION toenail q Design Criteria: Code Edition: 2012 IBC Live Loads: Roof 100 psf Floor 40 psf Loft (uninhabitable) 20 psf Dead Loads: Roof 10 psf Floor 10 psf Loft 10 psf Lateral Loads: Basic Wind Speed: 90 mph (3 second gust) Exposure: C Seismic Site Class: D Seismic Design Category C Foundations: A. Design is based upon soil properties provided by HP Geotech, report Job No 116 002A, dated January 15, 2016 and supplement letter dated March 7, 2016 . Foundation construction may not proceed without verification of these values. If discrepancies exist between the actual site conditions and the soil conditions indicated in the report contact EOR for further direction. Concrete footing sizes shown are based upon a minimum allowable design soil bearing pressure of 2000 psf for footings that bear on the natural gravel soils below the uncontrolled fill material. B. All footings shall bear on firm, undisturbed natural soil or properly compacted structural fill in accordance with the recommendations of the geotechnical engineer including proof-rolling and over-excavation as required. Avoid excessive wetting or drying of the excavations, keeping the excavation reasonably free from water during placement of concrete. Provide continuous perimeter drains around the base of foundation and retaining walls. C. Backfill shall be compacted to meet a 95% minimum standard Proctor density per ASTM D-1557 unless otherwise noted in the geotechnical report. Backfill shall be placed in 12" maximum vertical lifts or as detailed in the soils report and shall be free of deleterious material and compacted in a manner that does not damage the foundation, waterproofing or damp-proofing material. If soft spots are encountered contractor shall remove material and re-compact w/ approved material Finished grading shall drain away from the foundation wall at a minimum of 5%. D. Do not backfill against lower level walls or walls in retaining until all supporting elements are in place and properly anchored or adequate shoring is installed. Concrete slabs shall be properly cured. E. Contractor shall retain a licensed geotechnical engineer to verify soils conditions during excavation. Verify any discrepancies from the assumed values in writing to structural engineer for re-evaluation of the foundation design.. Micro Piles: A. Piles shall be designed and installed to resist a design service load of 15,000 lbs per pile. The factor of safety applied to the design loads to obtain the ultimate load capacity of each pile shall be 2, unless otherwise recommended by the pile contractor. B. Installation shall be done by a manufacturer authorized contractor, with proof of current authorization being submitted to the structural engineer prior to installation. C. Specific micro pile components shall be designed by micro pile contractor, and bear the stamp of a registered engineer. These items include but are not limited to: reinforcing, casing, grout design mix, D. Pile to footing connection to be designed by micro pile contractor. E. Micro pile bearing plate shall effectively distribute the design force to the footing concrete such that the lone shear requirements of ACI 349, Appendix B, are met and the bending stress does not exceed 0.55 fy for steel. F. Submit shop drawings including pile/ shaft sizes and types, locations, tolerances, and capacities. Also the contractor's cataloged cuts, general installation plan and data sheets shall be submitted to structural engineer for review prior to installation. Calculations shall be included, bearing the stamp of a registered engineer. G. The geotechnical engineer shall be present during installation. H. The maximum tolerance for top of pile alignment shall not exceed 1% of total length alignment +/-. Do not force into alignment. I. All piles shall have a minimum corrosion protection of hot dipped galvanization. The geotechnical engineer shall determine if further corrosivity protection is required, and the pile contractor shall determine required mediation. J. A written record shall be kept for each pier including the following: x Date of installation x Location of pile x Description of lead section x Number and size of piles x Number of extensions used x Depth of installation from a known reference point x Torque at termination of pile M. Pier holes shall be cleaned, dewatered and inspected by the geotechnical engineer prior to pouring concrete. N. Micro pile contractor is responsible for the micro pile testing and procedures, at his expense, and shall provide Verification Test and Proof Test data to the structural engineer and architect. Reinforced Concrete: A. All structural concrete had been designed in accordance with ACI 318-99. All structural concrete construction work shall conform to ACI 301-99 (or latest edition) unless noted otherwise. B. Cast in place concrete shall be made with type I/II sulfate-resistant cement to maintain the following requirements, admixtures containing chloride salts shall not be used. Element: F'c Mix Type Max W/C Ratio % Air Foundations & Footings 3000 psi ---- ---- Interior Slabs on Grade 3000 psi 0.5 ---- Exterior Slabs on Grade 4500 psi 0.45 6-8% C. Concrete coverage for reinforcing steel shall provide the following: 1. Concrete poured permanently against earth: 3" 2. Concrete poured in forms (exposed to weather or earth): 2" 3. Concrete (not exposed to weather or earth) x Slabs and walls 3/4" x Beams and columns 1 1/2" D. Concrete slabs on grade shall have sawn or trowel cut control joints at a maximum spacing of 12'-0" in each direction or 144 sq-ft within 12 hours of pouring. Carry reinforcement through joints and locate isolation joints around columns at exterior wall. Consult engineer prior to connecting the slab on grade to other portions of the superstructure. E. Hot and cold weather concreting procedures shall conform to the recommendations in the ACI Manual of Concrete Practice. F. Anchor bolts in wood sill plates shall be spaced at a maximum of 36" on center, unless noted otherwise on shear wall schedule, with one anchor at 12" from each end or corner and a minimum of two anchors per piece. Bolts for beam and column bearing plates shall be set with templates. G. Expansion bolts shall be placed a minimum of 6 bolt diameters from concrete edge and maintain a 10 bolt diameter in spacing, unless noted otherwise. H. Any stop in concrete work must be made at third point of span with verticcal bulkheads and horizontal shear keys, unless noted otherwise. Slabs, footings, beams and walls shall not have joints in a horizontal plane. Reinforcing Steel: A. All reinforcement detailing, fabrication and placement shall conform to the ACI Details and Detailing of Reinforcement (ACI 315-99). B. All reinforcing shall be of high grade deformed bars conforming to ASTM A615, grade 60, except ties and anchors which shall conform to ASTM A615, grade 40 or ASTM A706, grade 60. C. Welded wire fabric shall conform to ASTM A185, grade 60 and be lapped a minimum of one full mesh plus two inches at side and end splices and be wired together. D. Lap splices of reinforcement, where permitted, shall be a minimum of 48 bar diameters for #6 bar and smaller and 80 bar diameters for #7 and #8 bar, unless noted otherwise. Contact engineer for splicing recommendations prior to construction where not specifically detailed or noted. Do not weld or use mechanical splicing. E. Continuous top bars shall be spliced at mid-span and continuous bottom bars over supports. F. At corners make bar continuous through discontinuity or provide corner bars. Corner bars to extend 3'-0" each side of corner. Place two #5's (per 8" of thickness) to extend a minimum of 2'-6" around all openings/steps in walls, slabs and beams. Provide #5 x 5'-0" diagonal at all openings/steps in walls, slabs and beams. G. Contractor shall place (2)-#5's vertically full height of wall at high side of all wall steps higher that 4'-0" in addition to wall reinforcing shown otherwise. H. Extend reinforcing steel a minimum of 2'-6" through cold joints and coordinate cold joint locations with structural engineer. Structural Wood Framing: A. All framing and truss lumber shall be of dry Douglas Fir-Larch (DF), graded by Western Wood Products according to the following recommendations. All 2" nominal lumber, except studs shall be of DF #2 or better, and solid timber beams and post 3" nominal and wider shall be DF #2. B. All studs shall be of Stud Grade Douglas Fir or Hem-Fir (HF). C. Built-up 2x nominal lumber members shall be of the following requirements: Element Connection Beams 2x - DF #2 or better (2)-rows of 12d nails @ 12" o.c. (size per plan) or (2)-rows of 1/2" dia. thru-bolts @ 24" o.c. Beams 3x - DF #2 (2)-rows of 12d nails @ 12" o.c. (size per plan) or (2)-rows of 1/2" dia. thru-bolts @ 24" o.c. Posts DF or HF #2 or better (2)-rows of 12d nails @ 6" o.c. 2x4 or 2x6 studs D. Top and bottom plates shall be of Douglas Fir-Larch or Hem-Fir #2 or better. Plates in direct contact with concrete or masonry shall be of pressure treated Hem-Fir #2. Preservative treated lumber requires all connections and nailing be galvanived per code. E. For all solid or built-up columns bearing through floor joist spaces, provide blocking in joist space with cross sectional area to match column above. Typical door/window headers noted on plans consisting of a single stud are exempt from this requirement. F. Except as otherwise noted, the minimum nailing shall be provided as specified in the "Nailing Schedule" on the drawings ( IBC Table 2304.9.1). G. Bolts used for wood framing connections shall be installed with standard washers and nuts. H. Unless noted otherwise, steel connectors such as those manufactured by the Simpson Company shall be used to join rafters, joists or beams to other beams at flush-framed conditions. Use all specified nails. Connector conditions not otherwise noted shall utilize standard top flange hangers of a size specifically designed for the member supported, as shown in the manufacturer's published tables. Contact structural engineer for details as required. I. Manufactured joists shall be from an approved manufacturer and shall be equivalent in load carrying capacity and deflection criteria to joists shown on plans. Provide blocking, bracing, web stiffeners and other accessories as required by the manufacturer. Alternative joists of the same depth and spacing may be considered provided their load carrying capacity is equivalent or greater bending, shear and deflection. All joist alternatives shall be approved by the Engineer of Record (EOR ) prior to use. J. Laminated Veneer Lumber (LVL) shall have the following stress properties: x Flexural stress 2800 psi x Modulus of elasticity 2,000,000 psi x Tension parallel to grain 2100 psi x Compression parallel to grain 3000 psi x Compression perpendicular to grain 900 psi x Horizontal shear 285 psi L. For multiple member beam connections, unless noted otherwise in manufacturer's specification, use the following guide: x Strong-axis Loading of Beams (vertical loading): 1. For members 12" deep or less, nail each member to the next with (2)-rows of 12d nails @ 12" o.c. 2. For members greater than 12" deep, nail each member to the next with (3)-rows of 12d nails at 12" o.c. 3. For four member beams, bolt through with (2)-rows of 1/2" dia. bolts staggered at 12" o.c. x Weak-axis Loading of Beams (lateral loading): 1. For two or three member beams, nail each member to the next with (3)-rows of 12d nails @ 12" o.c. 2. For four member beams, bolt through with (2)-rows of 1/2" dia. bolts at 12" o.c. 3. For members consisting of more than four members, contact structural engineer. M. Framing Notes: x Exterior Walls: a. All exterior walls are 2x4 studs @ 16" o.c. to a maximum height of 12'-6", 2x4 studs @ 12" o.c. to a maximum height of 14'-0". Walls taller than 14'-0" shall be framed with manufactured versa-lam studs, contact engineer for spacing requirements, if not indicated on plans. Cap with a double top plate installed to provide overlapping at corners and at intersections with other partitions. If overlap is not possible, strap top plates together with metal strap ties (Simpson ST292 or equivalent). b. Gable-end walls shall be balloon-framed to the bottom of rafters. c. Floor to roof framing members must be aligned to bear within 5" of the studs beneath. d. Provide 1/2" thick APA sheathing (plywood or OSB) with floor/roof span rating of 24/16, exposure 1, at exterior face of exterior walls. Block all horizontal joints. e. Exterior headers shall be as shown.. Headers shall be supported with header hangers to full height jamb ("king") studs as shown on plan ( 2 studs, minimum). f. At beam bearing locations in stud walls, provide multiple-studs post equal to width of bearing member unless noted otherwise. x Interior Load Bearing Walls: a. Interior load bearing walls are 2x4 or 2x6 studs (as indicated on plans) @ 16" o.c. with 1/2" plywood wallboard, unless noted otherwise. Cap with double top plate installed to provide overlapping at corners and at intersections with other partitions. If overlap is not possible, strap top plates together with metal strap ties (Simpson ST292 or equivalent). b. Floor and roof framing members must be aligned to bear within 5" of stud beneath. c. At beam bearing locations in stud walls, provide multiple-stud posts equal to width of bearing member unless noted otherwise. x Floor Construction: a. Provide 3/4" thick APA rated Sturdifloor rated @ 24" o.c., tongue and groove, exposure 1. Glue and nail panels with 10d nails @ 6" o.c. along panel edges and @ 12" o.c. at intermediate supports, unless noted otherwise. Install sheathing with long dimension perpendicular to joists and end joints staggered. b. Provide solid blocking between floor joists at all bearing locations. Blocking material shall match floor joist material. c. Panels shall be identified with the grade-trademark of the American Plywood Association and shall meet the requirements of U.S. product standard PSI, latest edition for plywood. d. Floor construction shall have blocking at intervals not greater than 8'-0. x Roof Construction: a. Provide 5/8" thick APA plywood sheathing rated 32/16, exposure 1. Install sheathing with long dimension perpendicular to rafters or trusses and end joints staggered and nails a@ 4" o.c. along panel edges and @ 12" o.c. at intermediate supports, unless noted otherwise. b. Plywood sheathing shall be applied continuously over the primary roof members (rafters or trusses) below over-framed areas to provide adequate lateral stability. c. Provide wind/seismic anchors at supports for all roof joists and rafters. Provide solid blocking between roof rafters, trusses and lookouts at all bearing locations. Blocking material shall match rafter, truss chord or lookout material. d. Panels shall be identified with the grade-trademark of the American Plywood Association and shall meet the requirements of U.S. product standard PSI, latest edition for plywood. x Wind Bracing: a. Walls over 4'-0" long which are indicated as shear walls on plans have been designed to resist wind forces in accordance with Section 2306.1 of the IBC. b. At shear walls, screw 1/2" plywood or OSB to all studs and to top and bottom plates with 10d nails @ 6"o.c. maximum spacing. All other walls may be nailed w/ 8d nails at 6"o.c. maximum spacing. See shear wall schedule for more information. Non-Structural Elements: A. All elements not specifically structural such as non bearing partitions attached to and/or supported by the sub/super structure shall take into account any deflections and other structural movement. General Requirements: A. Structural erection and bracing: The structural drawings illustrate the completed structure with all elements in their final positions supported and braced. The contractor, in the proper sequence, shall provide shoring and bracing as may be required during construction to achieve the final completed structure. Contact engineer for consultation as required. B. Existing structures: If construction adjoins an existing structure, the contractor shall be responsible for verifying dimensions, elevations, framing, foundation and anything else that may affect the work shown on the structural plans. Under pinning, shoring and bracing of the existing structure shall be the sole responsibility of the contractor. C. Dimensions: Check all dimensions against field and architectural drawings prior to construction. Do not scale drawings. D. Construction practices: The general contractor is responsible for means, methods, techniques, sequences and procedures for construction of this project. Notify structural engineer of omissions or conflicts between the working drawings and existing conditions. E. Coordinate requirements for mechanical/electrical/plumbing penetrations through structural elements with structural engineer. Prior to installation of such equipment or other items to be attached to the structure, the contractor shall obtain approval for connections and support. Contractor shall furnish required hangers, connections, etc. required for installation of such items, unless specifically noted on plans. F. Jobsite safety is the sole responsibility of the contractor. All methods used for construction shall be in accordance with the latest edition of the IBC. G. The structural engineer may make periodic observation visits to the jobsite for determination of general conformance with the construction documents. Such observation visits shall not replace required inspections by the governing authorities or serve as "special inspections" as may be required by Section 17 of the International Building Code. H. Though every effort has been made to provide a complete and clear set of construction documents, discrepancies or omissions may occur. Release of these drawings anticipates cooperation and continued communication between the contractor, architect and engineer to provide the best possible structure. These drawings have been prepared for the use of a qualified contractor experienced in the construction techniques and systems depicted. CONSTRUCTION CONST. HT. INT. HORIZ. HDR. GEN. GYP. G.L. GYPSUM/GYPCRETE HEIGHT INTERIOR GENERAL HEADER HORIZONTAL GLUE-LAM EQUIV. FDN. FTG. GA. FLR. EXP. EXT. EXSTG. EA. ENG. ELEV. DWG. DBL. EQUIVALENT FOUNDATION FOOTING GAUGE FLOOR EXISTING EXPANSION EXTERIOR EACH ELEVATION ENGINEER DOUBLE DRAWING UNLESS NOTED OTHERWISE VERTICAL WELDED WIRE FABRIC WITHOUT WITH W.W.F. W/O W/ U.N.O. VERT. TRANSVERSE TYPICAL TONGUE & GROOVE TOP OF WALL THROUGH TOP OF FOOTING TRANSV. TYP. THRU T.O.W. T.O.F. T&G SIMILAR STRUCTURAL STANDARD SPECIFICATION SECTION SCHEDULE STRUCT. STD. SCHED. SPEC. SIM. SECT. CANT. CONN. CONT. CONC. COL. CLR. L C BOT. B.O.W. BRG. BLKG. BM. BLDG. ARCH. APPROX. ANCH. CANTILEVER CONNECTION CONTINUOUS CLEARANCE COLUMN CONCRETE CENTERLINE APPROXIMATELY BOTTOM OF WALL BLOCKING BOTTOM BEARING BEAM ARCHITECT BUILDING ANCHOR A.B. ANCHOR BOLT LAMINATED STRAND LUMBER ORIENTED STRAND BOARD LAMINATED VENEER LUMBER REINFORCE/REINFORCEMENT PLATE PLYWOOD REFERENCE REQUIRED REVISION REV. RE: REQ'D REINF. PLYWD. OSB PL MAXIMUM MANUFACTURER MINIMUM NOMINAL ON CENTER MATERIAL MECHANICAL MANUF. O.C. NOM. MIN. MAX. MAT'L MECH. LSL LVL LONGITUDINAL JOIST LONGIT. JST. DOWEL DWL. E.O.R. ENGINEER OF RECORD TOP OF STEEL T.O.S. ABBREVIATION LIST General Requirements: A. Structural erection and bracing: The structural drawings illustrate the completed structure with all elements in their final positions supported and braced. The contractor, in the proper sequence, shall provide shoring and bracing as may be required during construction to achieve the final completed structure. Contact engineer for consultation as required. B. Existing structures: If construction adjoins an existing structure, the contractor shall be responsible for verifying dimensions, elevations, framing, foundation and anything else that may affect the work shown on the structural plans. Under pinning, shoring and bracing of the existing structure shall be the sole responsibility of the contractor. C. Dimensions: Check all dimensions against field and architectural drawings prior to construction. Do not scale drawings. D. Construction practices: The general contractor is responsible for means, methods, techniques, sequences and procedures for construction of this project. Notify structural engineer of omissions or conflicts between the working drawings and existing conditions. E. Coordinate requirements for mechanical/electrical/plumbing penetrations through structural elements with structural engineer. Prior to installation of such equipment or other items to be attached to the structure, the contractor shall obtain approval for connections and support. Contractor shall furnish required hangers, connections, etc. required for installation of such items, unless specifically noted on plans. F. Jobsite safety is the sole responsibility of the contractor. All methods used for construction shall be in accordance with the latest edition of the IBC. G. The structural engineer may make periodic observation visits to the jobsite for determination of general conformance with the construction documents. Such observation visits shall not replace required inspections by the governing authorities or serve as "special inspections" as may be required by Section 17 of the International Building Code. H. Though every effort has been made to provide a complete and clear set of construction documents, discrepancies or omissions may occur. Release of these drawings anticipates cooperation and continued communication between the contractor, architect and engineer to provide the best possible structure. These drawings have been prepared for the use of a qualified contractor experienced in the construction techniques and systems depicted. 15031 S-0 GENERAL NOTES 4 3.14.16 TOWN OF VAIL, CO MATTERHORN INN NO. ISSUE PROJECT: JOB NO. SHEET NO. JURISDICTION: REVISED FOUNDATION PLAN, ADDED MICRO-PILE NOTES 3.14.16 06/15/16