Loading...
HomeMy WebLinkAboutVAIL HEALTH PHASE 3 206-210-2 CORR TAB.pdf TEST, ADJUST AND BALANCE REPORT PROJECT VAIL HEALTH PHASE 3 206-210- 2 CORR #1348 PREPARED FOR C&C PLUMING AND MECHANICAL REPORT ISSUE DATE 5/3/2018 PREPARED BY HVAC TAB llc P.O. BOX 1926 VAIL, CO 81658 PHONE: 970-376-5198 E-MAIL: mrichardson@hvactab.co HVAC TAB llc DATE: 5/3/2018 INSTRUMENT CALIBRATION REPORT PROJECT : VAIL HEALTH PHASE 3 206-210-2 CORR PROJECT ALTITUDE: 22.23“HG INSTRUMENT/ SERIAL # APPLICATION DATE OF USE CALIBRATION DATE CALIBRATION DUE DATE SHORTRIDGE ADM-870C / #W08162 AIR FLOW READINGS 5/3/2018 06/07/2017 06/07/2018 ANEMOMETER #RVA501416001 AIR FLOW READINGS 5/3/2018 06/12/2017 06/12/2018 SHORTRIDGE FLOW HOOD AIF FLOW READINGS 5/3/2018 * * TH-720 HYGROMETER/ #TH7200950003 AIR TEMP / HUMIDITY NOT USED 06/07/2017 06/07/2018 PITOT TUBE 18” PRES. READINGS NOT USED N/A N/A PITOT TUBE 24” PRES. READINGS NOT USED N/A N/A PITOT TUBE 36” PRES. READINGS NOT USED N/A N/A PITOT TUBE 48” PRES. READINGS NOT USED NA NA SHIMPO TACHOMETER / #C105B0010 RPM READINGS NOT USED 06/07/2017 06/07/2018 FLUKE 375 / #21290229 VOLT / AMP NOT USED 06/08/2017 06/08/2018 SHORTRIDGE HDM-250/ #W08162 WATER PRES. READINGS 5/3/2018 01/18/2018 01/19/2019 ASCROFT / 0-100 PSI / #DO68332-06 WATER PRES. READINGS NOT USED * * FLUKE 52 II THERMOMETER / 99780167 TEMP. READINGS NOT USED 06/28/2017 06/28/2018 REFRACTOMETER RHA-100 / #RHA- 100 GLYCOL % READINGS NOT USED N/A N/A * CHECKED TO CALIBRATED METER REMARKS: ALL READINGS WITH SHORTRIDGE INSTRUMENTS ARE CORRECTED FOR TEMPERATURE AND ALTITUDE. PAGE: HVAC TAB llc DATE: 5/3/2018 VAV BOX DESIGN DESIGN / ACTUAL NOTES NO. SIZE ADDRESS CAL MAX. MIN. HEAT MAX. 206 8 20 2.276 275 180 210 271 207 8 21 1.510 260 260 260 242 208 8 25 1.821 260 175 175 257 209 8 26 1.489 235 160 160 231 210 8 27 1.552 220 145 145 213 2 CORR 8 33 2.000 440 215 215 585 VAV TEST SUMMARY PROJECT: VAIL HEALTH PHASE 3 SYSTEM: 206 - 210 - 2 CORR PAGE: NOTES: SYSTEM TERMINAL DESIGN INITIAL FINAL NOTES NO TYPE SIZE AK VEL CFM VEL CFM VEL CFM VAV 206 S 1 SR 24/24 200 237 232 2 SR 24/24 75 31 39 275 268 271 TOTAL VAV 207 S 1 SR 24/24 260 150 242 TOTAL VAV 207 R 1 RR 23/11 180 305 184 TOTAL VAV 208 S 1 SR 24/24 260 147 257 TOTAL VAV 208 R 1 RR 23/11 180 353 182 TOTAL VAV 209 S 1 SR 24/24 235 160 231 TOTAL VAV 209 R 1 RR 23/11 135 213 140 TOTAL VAV 210 S 1 SR 24/24 220 136 213 TOTAL VAV 210 R 1 RR 23/11 120 269 125 TOTAL VAV 2 CORR S 1 CD 24/24 150 238 238 2 CD 24/24 145 40 224 3 SR 24/24 145 125 123 440 403 585 TOTAL ISO EX 1 ER 14/14 400 360 406 2 ER 11/11 115 116 126 3 ER 11/5.5 - 42 42 4 ER 11/5.5 - 45 48 5 ER 12/12 75 205 69 590 768 691 TOTAL NOTES: HVAC TAB llc DATE: 5/3/2018 AIR TERMINAL TEST REPORT PROJECT: VAIL HEALTH PHASE 3 SYSTEM: 206 - 210 - 2 CORR / ISO EX HVAC TAB llc DATE: 5/2/2018 FLOW METER DESIGN MEASURED LOCATION TYPE SIZE DESIGN P DESIGN GPM FINAL P VALVE POSITION % OPEN FINAL GPM RCP 207 IMI UA075 1 0.5 156.6 35 0.5 RCP-208 IMI UA075 1 0.5 155.7 35 0.5 RCP-209 IMI UA075 1 0.5 156.1 35 0.5 RCP-210 IMI UA075 1 0.5 154.1 35 0.5 RCP-2-CORR IMI UA075 1 0.5 158.1 35 0.5 VAV-6 IMI UA075 1 0.5 221.4 43 0.6 VAV=7 IMI UA075 4 0.5 5.6 50 1.2 VAV08 IMI UA075 1 0.5 156.9 38 0.5 VAV-9 IMI UA075 1 0.5 151.3 38 0.5 VAV-210 IMI UA075 1 0.5 157.3 39 0.5 VAV-2-CORR IMI UA075 1 0.5 154.8 38 0.5 BALANCE VALVE TEST REPORT PROJECT: VAIL HEALTH PHASE 3 PAGE: NOTES: SYSTEM:RCP 207-210-2 CORR/ VAV-206-210 2 CORR PAGE: