Loading...
HomeMy WebLinkAboutVail Double Tree Summary and Reports (2).pdf240 Annie Road | P.O. Drawer 1887 Silverthorne, Colorado 80498 Phone: (970) 468-1989 Fax: (970) 468-5891 Email: hpksummit@kumarusa.com Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado November 4, 2016 Widewaters Construction, Inc. Attn: Valerie Thodde P.O. Box 3 DeWitt, NY 13214-0003 Job No. 16-9-232 vthodde@widewaters.com Subject: Excavation Observation, Proposed Dumpster Enclosure, 2211 North Frontage Road, Vail, Colorado. Dear Mr. Thodde: As requested, a representative of Kumar & Associates, Inc. (H-P Kumar) observed the excavation at the subject site on October 27, 2016 to evaluate the soils exposed for foundation and floor slab support. The findings of our observations and recommendations for the foundation design are presented in this report. Proposed Construction The proposed construction consists of a dumpster enclosure on the west side of the existing hotel located at 2211 North Frontage Road, Vail, Colorado. The dumpster enclosure will consist of a single-story structure with the finished floor elevation at or above the adjacent grade. Reinforced concrete walls and continuous footings will be used below grade and masonry block walls above grade. Ground floor will be concrete slab-on-grade. We reviewed the structural plans prepared by SDL Structural Engineers, Project No. 16063.00, dated 10/26/16. The structural plans did not indicate an assumed maximum allowable bearing pressure. Excavation Observation At the time of our site visit, the foundation excavation had been cut in one level from about 4 to 5 feet below the adjacent ground surface. The soils exposed in the base of the excavation consisted of medium dense, clayey, silty sand with scattered gravel. Up to 2 feet of slightly silty sand and gravel fill material was observed in the cut slopes and under the proposed interior floor slab area of the structure. The soils at the base of the excavation were generally moist and offered stiff resistance when probed with a ⅜-inch T-probe with penetrations of 2 to 6 inches. Foundation Recommendations Considering the conditions exposed in the excavation and the nature of the proposed construction, spread footings placed on the undisturbed natural soil designed for a maximum allowable soil bearing pressure of 2,000 psf should be adequate for support of the proposed dumpster enclosure. Foundation settlements are anticipated to be relatively minor and essentially occur during construction. Loose and disturbed soils should be moisture-conditioned Widewaters Construction, Inc. November 04, 2016 Page 2 Project No. 16-9-232 and compacted. The bearing soils should be protected from frost and concrete should not be placed on standing water, frost, or frozen soils. Exterior footings should be provided with adequate soil cover above the bearing elevation for frost protection. Backfill placed around the structure should be compacted and the surface graded to prevent ponding within at least 10 feet of the structure in accordance with the recommendations presented in the “Surface Drainage” section of this letter. Floor Slab Recommendations We recommend all fill material be removed from under floors slabs and replaced with moisture- conditioned, properly compacted structural fill. The natural clayey, silty sand with scattered gravel observed at the base of the excavation and structural fill is considered good for slab-on- grade construction. To reduce the effects of some differential movement, nonstructural floor slabs should be separated from all bearing walls and columns with expansion joints which allow unrestrained vertical movement. Floor slab control joints should be used to reduce damage due to shrinkage cracking. Slab reinforcement and control joints should be established by the designer based on experience and the intended slab use. Structural fill placed beneath slabs can consist of the onsite granular soils or a suitable imported granular material, excluding topsoil and plus 6-inch material. Structural fill should be spread in thin horizontal lifts not to exceed 8 inches thick, adjusted to optimum moisture content, and compacted to at least 95% of the maximum standard Proctor dry density. Underdrain and Dampproofing It is our understanding the finished floor elevation at the lowest level of the addition is above the surrounding exterior grade. Therefore, a foundation drain system and stem wall dampproofing is not required. We recommend below-grade construction, such as retaining walls, crawlspace and basement areas, be protected from wetting and hydrostatic pressure buildup by an underdrain and wall drain system. If the finished floor elevation of the proposed structure has a floor level below the surrounding grade or the finished grading does not meet the minimum requirements of the “Surface Drainage” section, we should be contacted to provide recommendations for an underdrain system and dampproofing. All earth retaining structures should be properly drained. Surface Drainage The following drainage precautions should be observed during construction and maintained at all times after the addition has been completed: 1) Inundation of the foundation excavations and underslab areas should be avoided during construction. 2) Backfill in pavement and slab areas should be compacted to at least 95% of the maximum standard Proctor dry density at a moisture content within 2% of optimum. Exterior backfill placed in landscape areas should be compacted to at least 90% of the maximum standard Proctor dry density at a moisture content near optimum. 3) The ground surface surrounding the exterior of the building should be sloped to drain away from the foundation in all directions. We recommend a minimum Kumar & Associates, Inc. P.O. Drawer 1887 240 Annie Road Silverthorne, Colorado 80498 Phone: (970) 468-1989 Fax: (970) 468-5891 hpksummit@kumarusa.com Report of Masonry Grout Test Data Client: Widewaters Construction, Inc. Job No.: 16-9-232 Date: 02/02/2017 Attn: Valerie Thodde P.O. Box 3 DeWitt, NY 13214-0003 Sheet No.: 1 of 1 Lab #: 101 Project: 2211 North Frontage Road, Vail, Colorado. Placement Location: Trash Enclosure CMU Walls @ +11 Feet Test Location: South Wall Truck: 9381 Time Batch: 9:36 am Supplier: United Companies Ticket: 33212108 Time Arrived: 10:26 am Yards: 9 of 9 Mix: 37610444 Time Placed: 10:45 am Method of Placement: Pump Physical Properties: Water/Cement: 0.599 Specifications: Sample Point: Chute Water added: 45 Gal. Slump: 8 – 11 Inches Time Sampled: 10:55 am Slump: 10.0 Inches Air Content: NA % Air Temp.: 40 F Air Content: NA % Water / Cement: NA Max Concrete Temp.: 50 F Wet Unit Wt.: NA pcf Design Strength: 2,500 psi @ 28 days Time Cyl. Cast: 11:10 am Initial Cure: Field Field Storage: Cure Box / Indoors Diameter: 4 Inches Area: 12.57 Inches2 Max / Min: 76 F to 62 F Compressive Strength Data Age (Days) Date Load (lbs.) Compressive Strength (psi) 7 02/09/2017 28,936 2,300 28 03/02/2017 57,729 4,590 28 03/02/2017 56,020 4,460 Hold ------------- Preliminary Observations and / or Testing Results Verbally Reported To: Peak Professional Contractors and Don Hall Masonry Progress Report: Copies: Peak Professional Contractors SDL Structural Engineers Steve Bossart Jared Cohen Jason Deem Field Observer Reviewed By Kumar & Associates, Inc. P.O. Drawer 1887 240 Annie Road Silverthorne, Colorado 80498 Phone: (970) 468-1989 Fax: (970) 468-5891 hpksummit@kumarusa.com Report of Nuclear Density Testing Client: Widewaters Construction, Inc. Job No.: 16-9-232 Date: 02/10/2017 Attn: Valerie Thodde P.O. Box 3 DeWitt, NY 13214-0003 Sheet No.: 1 of 1 Project: 2211 North Frontage Road, Vail, Colorado. General Contractor: Widewaters Construction, Inc. Earthwork Contractor: Peak Professional Contractors Type & # of Earthmoving Units: Skid Steer Type & # of Compaction Units: Jumping Jack Method of Moisture Conditioning: Natural Moisture Compaction Standard: ASTM D-698 (Standard) Test No. Location West Side Deck Center Pier Backfill Depth or Elev. Laboratory Field Comp. (%) Min. Comp. Req. (%) Soil Type Max. Dry Dens. (pcf) Opt. Moist (%) Dry Dens. (pcf) Moist (%) 1 East Side of Pier -3’ 135.0 6.5 127.9 6.3 95 95 A 2 East Side of Pier -2’ 135.0 6.5 130.0 6.2 96 95 A 3 East Side of Pier -1’ 135.0 6.5 128.3 6.6 95 95 A 4 West Side of Pier -0- 135.0 6.5 132.0 6.4 98 95 A PART Time Observation The nuclear Densometer Method of testing was used in substantial accordance with ASTM D-2922 and D-3017. This report presents opinions formed as a result of our observations of fill placements. The site conditions noted and test results reported apply only to the locations and elevations listed, at the time of our observation. No assumptions may be formulated as to site conditions and level of compaction during times when our observer was not present, and at locations other than those reported. We have relied on the contractor to continue to apply the recommended compactive effort and moisture to fill during the times when our observer was not observing operations. Soil Type: A: On-Site Soils – Gravel (GP-GM); Slightly Silty, Sandy B: C: Preliminary Observations and / or Testing Results Verbally Reported To: Peak Professional Contractors Progress Report: On-site as requested to test and observe backfill placement for the center pier of the phase 3 west side deck piers. All other associated deck piers appear to have been previously placed and backfilled. Upon arriving to the site we observed that the contractor had set one precast pad and pier in an excavation located approximately 20 feet west and 20 feet south of the northwest building corner. Observed the contractor backfill the pier by placing approximate 6 inch lifts and applying compaction efforts with a jumping jack. In place testing was performed yielding satisfactory results. A sample of the on-site backfill soils was obtained for laboratory testing. Copies: Peak Professional Contractors SDL Structural Engineers Steve Bossart Jared Cohen Jason Deem Field Observer Reviewed By Sieve Size % Passing 8"100 0% 5"100 43% 3"100 22% 2"100 35% 1 1/2"99 1"96 3/4"93 1/2"83 3/8"76 #4 57 #8 55 #16 53 #30 51 #50 48 #100 42 #200 35 Gravel (GM); Very Silty, Sandy On-Site Fill Soils Stockpile Composite 11/1/2016 2.35 1.18 0.60 12.5 4.75 Grain Size (mm) 200 127 75 50 Location: Depth: Sample Date: 25.0 37.5 0.075 Liquid Limit: Plasticity Index: Particle Size Distribution Cobbles: FIGURE 12211 N. FRONTAGE ROAD, VAIL16-9-232 GRADATION TEST RESULTS 0.15 Gravel: Sand: Silt & Clay: 24 4 Classification: 0.30 19.0 9.5 0 10 20 30 40 50 60 70 80 90 100 PERCENT PASSING 200 75 37.5 19.0 DIAMETER OF PARTICLE IN MILLIMETERS SIEVE ANALYSIS HYDROMETER ANALYSIS TIME READINGS U.S. STANDARD SIEVES CLEAR SQUARE OPENINGS 435 MIN 127 60 MIN 19 MIN 4 MIN 1 MIN COBBLES 9.5 4.75 SAND 2.35 1.18 .60 .30 CLAY(plastic) TO SILT(non-plastic) GRAVEL COARSE FINE COURSE MEDIUM FINE .15 .075 .037 .019 .009 .005 .002 .001 #200 #100 #50 #30 #16 #8 3/8" 3/4" 1 1/2" 3" 5" 8" #4 500 1000 Sieve Size % Passing 8" 100 0% 5" 100 59% 3" 100 29% 2" 86 12% 1 1/2" 77 1" 71 3/4" 65 1/2" 56 3/8" 51 #4 41 #8 36 #16 30 #30 24 #50 19 #100 15 #200 12 0.30 19.0 9.5 Gravel: Sand: Silt & Clay: 27 3 Classification: FIGURE 32211 N. FRONTAGE ROAD, VAIL16-9-232 GRADATION TEST RESULTS 0.15 25.0 37.5 0.075 Liquid Limit: Plasticity Index: Particle Size Distribution Cobbles: Grain Size (mm) 200 127 75 50 Location: Depth: Sample Date: Gravel (GP‐GM); Slightly Silty, Sandy West Side Deck ‐ Center Pier Backfill On‐Site Soils ‐ Stockpile Composite 2/10/2017 2.35 1.18 0.60 12.5 4.75 0 10 20 30 40 50 60 70 80 90 100 PERCENT PASSING200 75 37.5 19.0 DIAMETER OF PARTICLE IN MILLIMETERS SIEVE ANALYSIS HYDROMETER ANALYSIS TIME READINGSU.S. STANDARD SIEVESCLEAR SQUARE OPENINGS 435MIN 127 60MIN19 MIN4 MIN1 MIN COBBLES 9.5 4.75 SAND 2.35 1.18 .60 .30 CLAY(plastic) TO SILT(non‐plastic) GRAVEL COARSEFINECOURSE MEDIUM FINE .15 .075 .037 .019 .009 .005 .002 .001 #200#100#50#30#16#83/8"3/4"1 1/2"3"5"8"#4 5001000 Kumar & Associates, Inc. P.O. Drawer 1887 240 Annie Road Silverthorne, Colorado 80498 Phone: (970) 468-1989 Fax: (970) 468-5891 hpksummit@kumarusa.com Report of Concrete Cylinder Test Data Client: Widewaters Construction, Inc. Job No.: 16-9-232 Date: 03/09/2017 Attn: Valerie Thodde P.O. Box 3 DeWitt, NY 13214-0003 Sheet No.: 1 of 1 Lab #: 3513 Project: 2211 North Frontage Road, Vail, Colorado. Placement Location: Header for Ballroom / Outer Wall Test Location: Point of delivery; prior to placement. Truck: 134 Time Batch: 11:55 am Supplier: Casey Concrete Ticket: 309548 Time Arrived: 12:50 pm Yards: 3 of 3 Mix: 8.0 3/8 70/30 with Fibers Time Placed: 1:10 pm Method of Placement: Pump Physical Properties: Water/Cement: NA Specifications: Sample Point: Chute Water added: -0- Gal. Slump: NA Inches Time Sampled: 1:00 pm Slump: 6 ¼ Inches Air Content: NA % Air Temp.: 55 F Air Content: 2.5 % Water / Cement: NA Max Concrete Temp.: 70 F Wet Unit Wt.: 137.1 pcf Design Strength: 5,000 psi @ 28 days Time Cyl. Cast: 1:15 pm Initial Cure: Field Field Storage: Cure Box Diameter: 4 Inches Area: 12.57 Inches2 Max / Min: 77 F to 63 F Compressive Strength Data Age (Days) Date Load (lbs.) Compressive Strength (psi) 7 03/16/2017 52,307 4,160 28 04/06/2017 68,310 5,430 28 04/06/2017 66,411 5,280 Hold ------------- Preliminary Observations and / or Testing Results Verbally Reported To: Casey Concrete and Peak Professional Contractors Progress Report: As requested, in addition to concrete testing on this date, Kumar & Associates was on site on 3/6/2017 to observe concrete reinforcement bar placements. While on site we observed concrete reinforcement for the Ballroom Header / Outer Wall. Reinforcement steel was observed for bar size, length, location, quantity, spacing, clearance, support, overlap, and cleanliness. All reinforcing steel observed appeared to be in general conformance to the plans and specifications (Plan 6 Sheet S201). Copies: Peak Professional Contractors SDL Structural Engineers Steve Bossart Barrett Sullivan Jared Cohen Field Observer Reviewed By Kumar & Associates, Inc. P.O. Drawer 1887 240 Annie Road Silverthorne, Colorado 80498 Phone: (970) 468-1989 Fax: (970) 468-5891 hpksummit@kumarusa.com Report of Mortar Test Data Client: Widewaters Construction, Inc. Job No.: 16-9-232.01 Date: 10/27/2017 Attn: Larry Paige P.O. Box 3 DeWitt, NY 13214-0003 Sheet No.: 1 of 1 Lab #: C3814 Project: Double Tree by Hilton, 2211 North Frontage Road, Vail, Colorado. Placement Location: South Lobby Chimney, ±10’ Above Ground Surface Specifications: Time Mixed: 12:40 pm Supplier: On Site, Spec Mix Mortar Slump: NA Inches Time Placed: 12:45 pm Method of Placement: Hand Design Strength: 1,800 psi @ 28 days Physical Properties: Air Temp.: 52 F Diameter: 2 Inches Sample Point: Mixer Material Temp.: 59 F Area: 4 Inches2 Time Sampled: 12:55 pm Slump: NA Inches Field Storage: Cure Box / Indoors Time Cast: 1:00 pm Initial Cure: Standard / Field Max / Min: 69 F to 64 F Type and Size of Specimen: MORTAR: 2”x2” Cubes MORTAR TYPE: S Compressive Strength Data Age (Days) Date Load (lbs.) Compressive Strength (psi) 7 11/03/2017 7,087 1,770 7 11/03/2017 6,866 1,720 28 11/24/2017 11,234 2,810 28 11/24/2017 12,016 3,000 28 11/24/2017 10,179 2,550 Hold ------------ Preliminary Observations and / or Testing Results Verbally Reported To: Widewaters Construction, Inc. & Masonry Crew Progress Report: As requested by Widewaters Construction, Kumar and Associates was on site for scheduled rebar observation and mortar testing. At the time of our site visit the contractor was placing block and mortar at a height of approximately ±10 feet above ground surface. Reinforcement steel was observed for bar size, length, location, quantity, spacing, clearance, support, overlap, and cleanliness. All reinforcing steel observed appeared to be in general conformance to the plans (S202 and S203). Mortar was sampled from the mixer. Six cube specimens were cast for compressive strength determination. Copies: lpaige@widewaters.com Justin Bermudez Jared Cohen Field Observer Reviewed By Kumar & Associates, Inc. P.O. Drawer 1887 240 Annie Road Silverthorne, Colorado 80498 Phone: (970) 468-1989 Fax: (970) 468-5891 hpksummit@kumarusa.com Report of Construction Activities Client: Widewaters Construction, Inc. Job No.: 16-9-232.01 Date: 11/02/2017 Attn: Larry Paige P.O. Box 3 DeWitt, NY 13214-0003 Sheet No.: 1 of 1 Project: Double Tree by Hilton, 2211 North Frontage Road, Vail, Colorado. Weather Conditions and Temperature: Clear, ±45ºF Major Equipment on Site: NA Contractor’s Construction Activities: Continued masonry construction for the South Lobby Chimney. Kumar & Associates Site Activities: As requested, Kumar & Associates observed the masonry reinforcement bars for the South Lobby Chimney. At the time of our site visit the contractor was placing block and mortar at a height of approximately ±25 feet above ground surface. Reinforcement steel was observed at this elevation for bar size, length, location, quantity, spacing, clearance, support, overlap, and cleanliness. All reinforcing steel observed appeared to be in general conformance to the plans (S202 and S203). Verbal Communication With: Widewaters Construction, Inc. and Masonry Crew Copies: lpaige@widewaters.com Justin Bermudez Jared Cohen Field Observer Reviewed By Kumar & Associates, Inc. P.O. Drawer 1887 240 Annie Road Silverthorne, Colorado 80498 Phone: (970) 468-1989 Fax: (970) 468-5891 hpksummit@kumarusa.com Report of Grout Test Data Client: Widewaters Construction, Inc. Job No.: 16-9-232.01 Date: 11/07/2017 Attn: Larry Paige P.O. Box 3 DeWitt, NY 13214-0003 Sheet No.: 1 of 1 Lab #: C3821 Project: Double Tree by Hilton, 2211 North Frontage Road, Vail, Colorado. Placement Location: South Lobby Chimney, ±40’ Above Ground Surface Specifications: Time Mixed: 9:50 am Supplier: On Site, Quikrete Mix 1101 Slump: 8 – 11 Inches Time Placed: 9:55 am Method of Placement: Hand Design Strength: 2,500 psi @ 28 days Physical Properties: Air Temp.: 50 F Diameter: 4 Inches Sample Point: Mixer Material Temp.: 59 F Area: 12.57 Inches2 Time Sampled: 10:00 am Slump: 10 ½ Inches Field Storage: Cure Box / Indoors Time Cast: 10:10 am Initial Cure: Standard / Field Max / Min: 68 F to 61 F Type and Size of Specimen: GROUT: 4”x8” Cylinders Compressive Strength Data Age (Days) Date Load (lbs.) Compressive Strength (psi) 7 11/14/2017 20,181 1,610 28 12/05/2017 27,545 2,190 28 12/05/2017 28,249 2,250 56 01/02/2018 35,889 2,860 Preliminary Observations and / or Testing Results Verbally Reported To: Widewaters Construction, Inc. & Masonry Crew Progress Report: As requested by Widewaters Construction, Kumar and Associates was on site for scheduled grout testing. At the time of our visit the contractor was placing grout for the South Lobby Chimney at a height of approximately 40 feet above ground surface. The contractor informed us that they have been placing grout at 6 block intervals. The contractor was mixing Quickrete grout mix #1101 on site. A sample was obtained from the mixer. Physical property testing was performed. Cylinders were cast for compressive strength determination. Copies: lpaige@widewaters.com Laura Brown Jared Cohen Field Observer Reviewed By Kumar & Associates, Inc. P.O. Drawer 1887 240 Annie Road Silverthorne, Colorado 80498 Phone: (970) 468-1989 Fax: (970) 468-5891 hpksummit@kumarusa.com Report of Concrete Cylinder Test Data Client: Widewaters Construction, Inc. Job No.: 16-9-232.01 Date: 11/17/2017 Attn: Larry Paige P.O. Box 3 DeWitt, NY 13214-0003 Sheet No.: 1 of 1 Lab #: C3829 Project: Double Tree by Hilton, 2211 North Frontage Road, Vail, Colorado. Placement Location: Vestibule Foundation Footing Test Location: Point of Discharge Truck: 146 Time Batch: 11:55 am Supplier: Casey Concrete Ticket: 313643 Time Arrived: 12:55 pm Yards: 1 of 1 Mix: 3000F Time Placed: 1:00 pm Method of Placement: Chute Physical Properties: Water/Cement: NA Specifications: Sample Point: End of Chute Water added: -0- Gal. Slump: NA Inches Time Sampled: 1:05 pm Slump: 3 ¼ Inches Air Content: NA % Air Temp.: 42 F Air Content: 1.8 % Water / Cement: 0.55 Max Concrete Temp.: 50 F Wet Unit Wt.: 147.3 pcf Design Strength: 3,000 psi @ 28 days Time Cyl. Cast: 1:20 pm Initial Cure: Field Field Storage: Cure Box Diameter: 4 Inches Area: 12.57 Inches2 Max / Min: 68 F to 59 F Compressive Strength Data Age (Days) Date Load (lbs.) Compressive Strength (psi) 7 11/24/2017 46,746 3,720 28 12/15/2017 68,310 5,430 28 12/15/2017 65,720 5,230 28 12/15/2017 66,420 5,280 Preliminary Observations and / or Testing Results Verbally Reported To: Casey Concrete and Widewaters Construction Progress Report: As requested, in addition to concrete testing on this date, Kumar & Associates observed the concrete reinforcement bar placements for the vestibule footing. Reinforcement steel was observed for bar size, length, location, quantity, spacing, clearance, support, overlap, and cleanliness. All reinforcing steel observed appeared to be in general conformance to the plans and specifications (Plan Sheets S101-3 and 301-2-1). Copies: lpaige@widewaters.com John Gowins Jared Cohen Field Observer Reviewed By Kumar & Associates, Inc. P.O. Drawer 1887 240 Annie Road Silverthorne, Colorado 80498 Phone: (970) 468-1989 Fax: (970) 468-5891 hpksummit@kumarusa.com Report of Concrete Cylinder Test Data Client: Widewaters Construction, Inc. Job No.: 16-9-232.01 Date: 11/27/2017 Attn: Larry Paige P.O. Box 3 DeWitt, NY 13214-0003 Sheet No.: 1 of 1 Lab #: C3831 Project: Double Tree by Hilton, 2211 North Frontage Road, Vail, Colorado. Placement Location: Vestibule Foundation Wall Test Location: Point of Discharge Truck: 139 Time Batch: 11:53 am Supplier: Casey Concrete Ticket: 313721 Time Arrived: 12:50 pm Yards: 10 of 10 Mix: M02462 Time Placed: 1:05 pm Method of Placement: Chute Physical Properties: Water/Cement: NA Specifications: Sample Point: End of Chute Water added: -0- Gal. Slump: NA Inches Time Sampled: 1:10 pm Slump: 4 ½ Inches Air Content: NA % Air Temp.: 50 F Air Content: 5.5 % Water / Cement: 0.40 Max Concrete Temp.: 65 F Wet Unit Wt.: 141.3 pcf Design Strength: 5,000 psi @ 28 days Time Cyl. Cast: 1:25 pm Initial Cure: Field Field Storage: Cure Box Diameter: 4 Inches Area: 12.57 Inches2 Max / Min: 65 F to 55 F Compressive Strength Data Age (Days) Date Load (lbs.) Compressive Strength (psi) 7 12/04/2017 50,609 4,030 29 12/26/2017 77,685 6,180 29 12/26/2017 81,429 6,480 29 12/26/2017 78,051 6,210 Preliminary Observations and / or Testing Results Verbally Reported To: Casey Concrete and Widewaters Construction Progress Report: As requested, prior to concrete placement, Kumar & Associates observed the concrete reinforcement bar placements for the vestibule wall. Reinforcement steel was observed for bar size, length, location, quantity, spacing, clearance, support, overlap, and cleanliness. All reinforcing steel observed appeared to be in general conformance to the plans and specifications. Copies: lpaige@widewaters.com Barrett Sullivan Jared Cohen Field Observer Reviewed By INDEPENDENT TESTING & INSPECTION SERVICES INC. 12084 VASEEN CT. CONIFER, COLORADO 80433 303-674-7560 FAX 303-674-7560 Page 1 of 2__ OBSERVATION REPORT This report package contains information concerning specific tests and inspections of structural steel welding, structural bolting, structural sprayed fireproofing, and/or nondestructive testing. The specific criteria utilized in judging the degree of conformance for each area of inspection are contained on each individual inspection form. Also included may be ITIS’ “List of Outstanding Discrepancies” (O.D. List). The O.D. List will be consecutively numbered for each page issued throughout the duration of the project. Each individual item listed will also be consecutively numbered. If there are any questions regarding the content of this report, please feel free to contact ITIS at your convenience. David L. Sturgeon President ICBO Certified Inspector #1138247-85 AWS QC-1 #82122691 Resident Level III Client: Kumar & Associates ITIS Job No 121217 Date: 12/12/17 Project: Vail Double Tree / #B16-0266 Location: 211 N. Frontage Rd./Vail, CO Inspector: David L. Sturgeon INDEPENDENT TESTING & INSPECTION SERVICES INC. 12084 VASEEN CT. CONIFER, COLORADO 80433 303-674-7560 FAX 303-674-7560 Page 2 of 2__ INITIAL VISUAL INSPECTION OF WELDING FIELD REPORT FORM Inspector: David L. Sturgeon Job No. 121217 Date: 12/12/17____ Field Made Welds X Shop Made Welds ______ Type of Welds Inspected: Fillet X Groove ________ Other ________ Type of Component (i.e.: Column, beam girder, moment weld, etc) As Recorded__________ Applicable Code or Standard: AWS_______________________________ AREAS OF INSPECTION LEVEL OR ELEVATION: Level 1 Section 11 of S201 Penetrations GRID LINE LOCATON(S): Header and Storage Room__________________________ CONDITIONS OF NONCONFORMANCE / INSPECTION RESULTS: LEVEL OR ELEVATION: __________________________________________________________________ GRID LINE LOCATION(S): ________________________________________________________________ CONDITIONS OF NONCONFORMANCE / INSPECTIONS RESULTS: LEVEL OR ELVATION: __________________________________________________________________ GRID LINE LOCATION(S): _______________________________________________________________ CONDITIONS OF NONCONFORMANCE / INSPECTION RESULTS: The installation was viewed. Three stiffeners are not installed at the squares and the 4-1/2” hole. The top horizontal bars are not installed. Welds on both sides of the stiffeners are missing. Only one side is welded. The G.C. was informed. Photos were taken for an engineering review of the as-built condition. The G.C. is to inform ITIS. INDEPENDENT TESTING & INSPECTION SERVICES INC. 12084 VASEEN CT. CONIFER, COLORADO 80433 303-674-7560 FAX 303-674-7560 Page 1 of 2__ OBSERVATION REPORT This report package contains information concerning specific tests and inspections of structural steel welding, structural bolting, structural sprayed fireproofing, and/or nondestructive testing. The specific criteria utilized in judging the degree of conformance for each area of inspection are contained on each individual inspection form. Also included may be ITIS’ “List of Outstanding Discrepancies” (O.D. List). The O.D. List will be consecutively numbered for each page issued throughout the duration of the project. Each individual item listed will also be consecutively numbered. If there are any questions regarding the content of this report, please feel free to contact ITIS at your convenience. David L. Sturgeon President ICBO Certified Inspector #1138247-85 AWS QC-1 #82122691 Resident Level III Client: Kumar & Associates ITIS Job No 121217 Date: 1/17/18 Project: Vail Double Tree / #B16-0266 Location: 211 N. Frontage Rd./Vail, CO Inspector: David L. Sturgeon INDEPENDENT TESTING & INSPECTION SERVICES INC. 12084 VASEEN CT. CONIFER, COLORADO 80433 303-674-7560 FAX 303-674-7560 Page 2 of 2__ INITIAL VISUAL INSPECTION OF WELDING FIELD REPORT FORM Inspector: David L. Sturgeon Job No. 121217 Date: 1/17/18____ Field Made Welds X Shop Made Welds ______ Type of Welds Inspected: Fillet X Groove ________ Other ________ Type of Component (i.e.: Column, beam girder, moment weld, etc) As Recorded__________ Applicable Code or Standard: AWS_______________________________ AREAS OF INSPECTION LEVEL OR ELEVATION: Level 1 Report of 12/12/17 Re-inspections GRID LINE LOCATON(S): Header at Storage Room__________________________ CONDITIONS OF NONCONFORMANCE / INSPECTION RESULTS: LEVEL OR ELEVATION: __________________________________________________________________ GRID LINE LOCATION(S): ________________________________________________________________ CONDITIONS OF NONCONFORMANCE / INSPECTIONS RESULTS: LEVEL OR ELVATION: __________________________________________________________________ GRID LINE LOCATION(S): _______________________________________________________________ CONDITIONS OF NONCONFORMANCE / INSPECTION RESULTS: The horizontal bars and the three missing stiffeners have been installed. The welding is complete. The rework was found conforming