Loading...
HomeMy WebLinkAboutB17-0282 4573_001.pdf 1 ' A Monroe&Newell Engineers,Inc. Structural Engineers vai•never • FIELD REPORT Date: May 10, 2018 Project: #10663 Project: Hill Residence Location: Vail, CO Weather: Clear, Calm Temp: 60 °at 10 A.M. 4240 Architecture 3507 Ringsby Ct., Ste. 117 Denver, CO 80216 Attn: Mr. Andy McRae, Principal The purpose of this site visit was to observe the reinforcing of the existing steel beams in the second floor framing and the steel columns in the lower and main levels of the commercial space. This work is necessitated by the new residence construction above. The following was noted: Once the columns where exposed it was found that some of the them had been reinforced previously and additional reinforcing is not required. The remaining columns reinforcing is complete generally with steel angles welded to the existing columns. In lieu of adding WT sections to the bottom of the steel beams needing reinforcing, the contractor has used equivalent back to back steel angles. The reinforcing of the steel beams is complete. Based on our observation, the reinforcing of the existing steel framing is complete and in accordance with our design intent. oit 1111DQNAMoo ID ��� MONki$514,. 7;3::%. 41,k%.GINEERS, INC. e 1 82 - r Q Peter Mti�r , � L ,;����•` Principal �kefeaa;r=tt+�� Cc: Mr. Tim Olson Ms. Romy Bieker May 11,2018 i M&N#10663