HomeMy WebLinkAbout2654 marriott - vail cbc report.pdfCERTIFIED BALANCING AND
COMMISSIONING, LLC.
I
Testing, Adjusting and Balancing Report
Project Vail Marriott
Address 715 Lionshead Circle | Vail, CO 81657
Architect NEO Studio
Mechanical Engineer BA Consultants
Contractor GAR Mechanical
Balancing Supervisors Greg Barnes
Date May 11, 2018
Job Number 2654
CERTIFIED BALANCING AND
COMMISSIONING, LLC.
II
ABBREVIATION INDEX
AHU: Air Handling Unit
Motor FLA: Full Load Amperage
RTU: Roof Top Unit
S.F.: Service Factor
MAU: Make Up Air Unit
P.F.: Power Factor
FCU: Fan Coil Unit
Nom. Eff.: Nominal Efficiency
CRAC: Computer Room Air Conditioning Unit
RPM: Revolutions per Minute
VAV: Variable Air Volume
FPB: Fan Powered Box
K Factor: Correction Factor
T1: Terminal 1
T2: Terminal 2
T3: Terminal 3
AK: Area Correction
OD: Outside Diameter
CUH: Cabinet Unit Heater
UH: Unit Heater
ERV: Energy Recovery Ventilator
TDH: Total Dynamic Head
ERU: Energy Recovery Unit
PSI: Pounds per Square Inch
EF: Exhaust Fan
BV: Balance Valve
KEF: Kitchen Exhaust Fan
CS: Circuit Setter
SF: Supply Fan
Valve D.P.: Discharge Pressure
RF: Return Fan
Valve S.P.: Suction Pressure
TF: Transfer Fan
Diff.: Differential
SEF: Smoke Exhaust Fan
Design D.P.: Design Differential Pressure
SPF: Stairwell Pressurization Fan
Actual D.P.: Recorded Differential Pressure
SP: Static Pressure
Ind.Imp.Dia.: Indicated Impeller Diameter
TSP: Total Static Pressure
in.wc.: Inches of Water
ESP: External Static Pressure
HW: Heating Water
VP: Velocity Pressure
CHW: Cooling Water
SA: Supply Air
CW: Condenser Water
RA: Return Air
HX: Heat Exchanger
OSA: Outside Air
DX: Direct Expansion
OA: Outside Air
EAT: Entering Air Temperature
MA: Mixed Air
LAT: Leaving Air Temperature
SD: Supply Diffuser
EWT: Entering Water Temperature
CD: Ceiling Diffuser
LWT: Leaving Water Temperature
SWD: Sidewall Diffuser
ER: Exhaust Register
MVD: Manual Volume Damper
RG: Return Grille
OBD: Opposed Blade Damper
CFM: Cubic Feet Per Minute
NAC: No Access
FPM: Feet Per Minute
NG: Not Given
NIC: Not in Contract
E: Existing
CERTIFIED BALANCING AND
COMMISSIONING, LLC.
III
Method of Balancing:
Supply, Return and Exhaust diffusers, grilles and registers were measured with an
Alnor Balometer EBT-721, which includes the flow hood, velgrid, pitot tube and
airfoil. Heating and Chilled water flow rates were measured with an Alnor Hydronic
Manometer HM-680 by obtaining pressure measurements. RPM was measured with a
Shimpo tachometer. Amperage and Voltage readings were taken with a Fluke 930
meter.
Instrumentation:
Digital Manometer Alnor Balometer EBT-721
Flow hood Alnor Balometer EBT-721
Digital Pressure Gage Alnor Hydronic Manometer HM-680
Tachometer Shimpo
Digital Volt-Amp Meter Fluke 930
Thermometer Alnor Balometer EBT-721
Warranty Information:
This project was completed per TABB Procedural Standards.
The data presented in this report is a record of system measurements and final adjustments
that have been obtained in accordance with the current edition of the TABB Procedural
Standards for testing, adjusting, and balancing environmental systems. Any variances
from design quantities, which exceed TABB tolerances, are noted in the Test-Adjust-
Balance Report Project Summary. If a Test-Adjust-Balance Report Project Summary is
not issued directly following this cover page, all measurements met the design
requirements as specified by the design mechanical engineer.
This project has a one-year guarantee on all Testing, Adjusting & Balancing from the date
listed on this cover page.
Greg Barnes
Owner/ TABB Supervisor
greg@certtab.com
720-201-6274
CERTIFIED BALANCING AND
COMMISSIONING, LLC.
IV
Project Summary
1. Individual Notes, Explanations, and Deficiencies, if exist,
are shown underneath the associated equipment.
Energy Recovery UnitPROJECT:LOCATION:MARRIOTT - VAILVAIL, CO
2654PROJECT #:
DATE:CONTACT:
AUTHOR:
5/11/2018Daniel Takacs
CBC REPORT DEPT.
Tested By:Daniel Takacs
Date:5/11/2018
SYSTEM/UNIT: ERV-01
Log:ERV-01 5/11/2018 Daniel Takacs AIRFLOWS VERIFIED AT INTAKE/DISCHARGE ON
EXTERIOR WALL.
ERV-01 5/11/2018 Daniel Takacs UNABLE TO OBTAIN PRESSURE DATA DUE TO
LIMITED ACCESS, FINISHED CABINET, AND FLEX
DUCTWORK. VERIFIED OPERATION.
ERV-01 5/11/2018 Daniel Takacs NO SAFE ACCESS TO GATHER VOLT AND AMP
READINGS.
Unit Data
Unit Manufacturer DAIKIN
Unit Model Number VAM600GVJU
Unit Serial Number F000958
Starter Data
ERV-01/Exhaust Fan
Starter Manufacturer THERMALLY PROTECTED
ERV-01/Supply Fan
Starter Manufacturer THERMALLY PROTECTED
Test Data
S/Fan Design Airflow 520 CFM
S/Fan Actual Airflow 565 CFM
E/Fan Design Airflow 520 CFM
E/Fan Actual Airflow 540 CFM
Motor Data
ERV-01/Exhaust Fan
Motor HP 3/8 HP
Motor Rated Volts 208/230 Volts
Motor Phase 1
Motor Hertz 60 Hz
Motor FL Amps 3.7 Amps
ERV-01/Supply Fan
Motor HP 3/8 HP
Motor Rated Volts 208/230 Volts
Motor Phase 1
Motor Hertz 60 Hz
Motor FL Amps 3.7 Amps
Certified Balancing and Commissioning Page 1 of 2
“All I have in this world is my faith and my word, I don’t break them for anyone”
Energy Recovery UnitPROJECT:LOCATION:MARRIOTT - VAILVAIL, CO
2654PROJECT #:
DATE:CONTACT:
AUTHOR:
5/11/2018Daniel Takacs
CBC REPORT DEPT.
Tested By:Daniel Takacs
Date:5/11/2018
SYSTEM/UNIT: ERV-02
Log:ERV-02 5/11/2018 Daniel Takacs UNABLE TO OBTAIN PRESSURE DATA DUE TO
LIMITED ACCESS, FINISHED CABINET, AND FLEX
DUCTWORK. VERIFIED OPERATION.
ERV-02 5/11/2018 Daniel Takacs NO SAFE ACCESS TO GATHER VOLT AND AMP
READINGS.
ERV-02 5/11/2018 Daniel Takacs AIRFLOWS VERIFIED AT INTAKE/DISCHARGE ON
EXTERIOR WALL.
Unit Data
Unit Manufacturer DAIKIN
Unit Model Number VAM600GVJU
Unit Serial Number F000957
Starter Data
ERV-02/Exhaust Fan
Starter Manufacturer THERMALLY PROTECTED
ERV-02/Supply Fan
Starter Manufacturer THERMALLY PROTECTED
Test Data
S/Fan Design Airflow 520 CFM
S/Fan Actual Airflow 555 CFM
E/Fan Design Airflow 520 CFM
E/Fan Actual Airflow 545 CFM
Motor Data
ERV-02/Exhaust Fan
Motor HP 3/8 HP
Motor Rated Volts 208/230 Volts
Motor Phase 1
Motor Hertz 60 Hz
Motor FL Amps 3.7 Amps
ERV-02/Supply Fan
Motor HP 3/8 HP
Motor Rated Volts 208/230 Volts
Motor Phase 1
Motor Hertz 60 Hz
Motor FL Amps 3.7 Amps
Certified Balancing and Commissioning Page 2 of 2