Loading...
HomeMy WebLinkAbout7.30 Inc.Western Pipeline ERWSD PW Permit App..pdf MUST BE SUBMITTED MIN 3 BUSINESS DAYS PRIOR TO PERMIT ISSUANCE APPLICATION FOR PUBLIC WAY USE-STREET CUT PERMIT Town of Vail PW#: Public Works Dept Parcel#: 1309 Elkhorn Dr Bldg Permit#: B - Vail,CO 81657 WARNING: Inclusion of false information in this permit application establishes an automatic denial for a Public Way Use- Street Cut Permit and forfeiture of application fees. By signing this permit,the applicant declares he/she has read all contents of this document,Town of Vail Roadway Standards and chapters of Title 8—Public Ways and Property,of the Vail Municipal Code and is fully aware of its requirements and agrees to pay all applicable fees. Contact Public Works for fees 970-479-2198. Company Company Name: 7.30 Inc. dba Western Pipeway Phone: 970 4653 6176 City/State/ Company Address:PO Box 2098 Zip: Breckenridge CO 80424 Contact Name: Harry Baum Email: harryt westempipeway.com Contact Phone: 970 453 6176 ROW Use Location: South Frontage Road/West Gore Creek Drive Requested ROW Requested Use Dates: 10-31-18 to 10-31-18 Work Times: 7:00 am/7:00 pm Purpose for Request:(Check all that apply) Street Cut Dimension(if applicable): C Electrical Service/Meter to a ROW utility* Other Underground Utility Installation * t Landscaping Length: C Temp Site Access i1 ' C Construction Staging Width(min 4'): ? C Roadway Construction 11 �jOd C Other(explain): Total Square Footage: *If an electrical service and meter are to be set as a part of this project and are solely within the ROW and are not a part of a separate Building Permit,a separate ROW EIectrical Permit will be required. Requested ROW Use: C Single Lane Closure-Ift of closure(including taper)1,200 If C Two Lane Closure-lft of closure(including taper) C Three Lane Closure-Ift of closure(including taper) C Sidewalk/Bike Path-lft of closure C Other(explain): 1. Applicant shall submit a traffic control plan,and work site/staging plan with this application. Traffic Control Plan shall be in compliance with the MUTCD and shall show streets with names,adjacent intersections,advanced warning signage,taper lengths,buffer space and work zone dimensions. No full street closures are allowed 2. Applicant must contact Public Works Department at 970-479-2198,24 hours prior to commencing of work. Failure to notify the Town will result in forfeiture of bond money. 3. Applicant is responsible for obtaining approvals from all utility companies having an existing utility Iine within the project site,applicant has option of routing application through the Public Works office to obtain the necessary Town of Vail signatures. Please allow up to one week to process. Xcel Energy (800-922-1987) Century Link(800-922-1987) Comcast(800-922-1987) Holy Cross Electric(800-922-1987) Eagle River Water&Sanitation District(970-477-5449) Town of Vail Electric(970-479-2158) Town of Vail Irrigation(970-479-2158) t4. Print Applicant Name Applicant Signature Date TOWN OF VAIs` PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS How it relates to Building Permits: D Notice sign-offs for utility companies. ALL utilities must field verify (locate) respective utilities prior to signing application. Some utility companies require up to 48 hours notice to schedule a locate. D A construction traffic control/staging plan must be prepared on a separate sheet of paper. An approved site plan may also be used. This plan will show locations of all traffic control devices (signs, cones, etc.) and the work zone, (area of construction, staging,etc.). This plan will expire on November 1st and will need to be resubmitted for consideration for approval through the winter. Be aware that your resubmission for winter may be denied depending on the location of construction. • Sketch of work being performed must be submitted indicating dimensions (length, width and depth of work). This may be drawn on the traffic control plan or a site plan for the job. D Submit completed application to the Public Works office for review. If required, locates will be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in the morning, but may require up to 48 hours to perform. > The Public Works Construction Inspector will review the application and approve or deny the permit. You will be contacted as to the status and any requirements that may be needed. Most permits are released 48 hours of being received, but please allow up to one (1)week to process. > As soon as the permit is approved,the Building Department will be notified, allowing the "Building Permit" to be released. Please do not confuse the "Public Way Permit"with the"Building Permit". D NOTE: The above process is for work in a public way ONLY. Public Way Permits are valid only until November 15th. A new Public Way Permit is required each year if work is not complete. Re-application each November 15th does not mean an automatic renewal. I have rea derstand the above. qr17"/ 0 Signature Date Signed TOWN OF VAIL' DRAINAGE AND CULVERT INSPECTIONS ARE REQUIRED BY PUBLIC WORKS! Please read and check off each of the items below: 7 The Town of Vail Building Department has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets. The Town of Vail Public Works Department will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culverts at access points from the road or street onto the construction site. Such approval must be obtained prior to any requests for inspection by the Town of Vail Building Department for footings, temporary electrical or any other inspection. Please call Leonard Sandoval at 970-479-2198 to request an inspection from the Public Works Department. Allow minimum of 24 hour notice. Also,the Town of Vail Public Works Department will be approving all final drainage and culvert installation with resulting road patching as necessary. Such approval must be obtained prior to any Final Certificate of Occupancy issuance. Agreed to by: 1-14–v1, 641/Wt/— Print Name Signature: I r l Project Name: W (A^i ; Date Signed: el 0 TOWN OF VAIs' MATERIAL STORAGE AND CONSTRUCTION PARKING Please read and check off each of the items below. (Copies of complete text are available upon request) CODE 5-2-10: DEPOSITS ON PUBLIC WAYS PROHIBITED O Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or deposit, or cause to be littered,tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any other debris or material upon any street, sidewalk, alley or public place, or any portion thereof. O Notice; Abatement: The Director of Public Works may notify and require any person who violates or causes another to violate the provision of subsection A hereof, or who has in the Director's employment a person who violates or causes another to violate the same, top remove such sand,gravel, rocks, mud, dirt, snow, ice or any other debris or material within twenty four(24) hours after receipt of said notice by the Director of Public Works. In the event the person so notified does not comply with the notice within the period of time herein specified, the Director of Public Works, or other authorized agent, may cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed from any street or alley at the expense of the notified. O Summons and Penalty: As an alternative to the notice for removal provided in subsection B above, any person who violates or causes another to violate the same, may be issued a summons to appear before the Municipal Court of the Town for said violations, and upon being found guilty of a violation hereunder be punished as provided in Section 1-4-1 of this code. O Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of this Code. (1997 Code: Ordinance 6 (1979). CODES 7-3A-1 AND 7-3A-3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED O No person shall park any vehicle upon a street or at any other place within this Municipality in such a manner or under such conditions as to interfere with the free movement of vehicular traffic or proper street or highway maintenance. (Ord. 2(1968)§ 1) O Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a street or upon any place within this Municipality in such a manner as to constitute a violation of any section of this Article, or left unattended for a period of twenty four(24) hours or more and presumed to be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as amended,the officer shall require the vehicle to be removed or cause it to be removed and placed in storage in the nearest garage or other place of safety designated or maintained by this Municipality, and the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in addition to a ten dollar($10) impoundment charge. (Ord. 2(1968)§ 3: Ord. 28(1981)§ 1) I have read and will comply with the above code provisions: I Yv1 �� in Imo` T-z € Print Name uc..., r----- Position Position or Relationship to Project: e�, Date Signed: . J e,./.