Loading...
HomeMy WebLinkAboutERWSD Pre Construction Agenda and construction schedule.pdf PRECONSTRUCTION CONFERENCE AGENDA BRIDGE ROAD SANITARY SEWER RELOCATION CONTRACT NO.:18.15.005 April 19, 2018 1. Attendance List: Name Company Email Address Phone Melissa Marts ERWSD mmarts@erwsd.org 970.401.1329 Jeffrey Schneider ERWSD ischeneider@erwsd.org 970.445.7941 Chad Salli Town of Vail csalliOvaileov.com 970.479.2169 Leonard Sandoval Town of Vail Isandoval@vailgov.com 970-479-2198 Chad Cantrell JVA ccantrell@ivaiva.com 303.565.4933 Jacob Davis United Jacob.davis@united-Ri.com 970.376.6437 2. Contacts and Chains of Command a) Owner: ERWSD Primary Contact: Melissa Marts--Project Manager Phone: 970.401.1329 Email:mmarts@erwsd.org Mail: 846 Forest Road,Vail CO 81645 Secondary Contact:Jeff Schneider Phone: 970.445.7941 Mail:jschneider@erwsd.org b) Company:JVA Engineer: Chad Cantrell Phone: 303.565.4933 Mail:1319 Spruce Street, Boulder, CO 80302 c) Contractor: United Primary Contact:Jacob Davis � . Old Sr Phone: 970.376.6437 Mail:Jacob.davis@united-gj.com Project Superintendent: Phone: Fax: Mail: `' d) Materials Tester: H-P Kumar ?kr�L (`el Primary Contact:Thomas Westhoff Phone: 970.945.7988 Fax: 970.945.8454 F:\15WSDk1admin'.Contracts.FormsiBID FORMS'..PreConMtg.doc email:hpkglenwood@kumarusa.com e) COOT: Primary Contact:Andy Garcia Phone: 970.471.9768 Mail: f) Town of Vail Primary Contact:Chad Salli Phone:970.479.2169 email: csalli@vailgov.com 3. Correspondence Formats: a) All correspondence should reference: Bridge Road Sanitary Sewer Relocation ERWSD b) Letters to Owner: Melissa Marts ERWSD 846 Forest Road,Vail CO 81657 c) Letters to Engineer: Chad Cantrell 1319 Spruce Street, Boulder, CO 80302 d) Letters to Contractor: Jacob Davis 2273 River Road,Grand Junction, CO,81505 e) Submittals: Email to Chad Cantrell (JVA)and cc Melissa Marts(ERWSD) 4. Major Subcontractors: (a) Traffic Control --- Uvfw4 00.u1 Z1++-c- (b) Others? 5. Contract, Notice to Proceed and Liquidated Damages: (a) Contract Date:2.16.2018 (b) Notice to Proceed:2.19.2018 (c) Contract Substantial Completion: 6.15.2018 Contract Final Completion:6.29.2018 (d) Liquidated Damages: $285/day substantial completion and$132/day final completion F:115WSD11admin\ContractlForms\B[D FORMS\PreConMtg.doc 6. Permits:TOV Public Way Permit �^-' -4-.1c' � . c L`64" Dewatering PermitL?-pry;,, / 7 �p ftwq 1 / h CDPHE Dewatering Permit Others? 7. Working Hours: Daylight Hours. No weekends, holidays or during special events. Other restrictions? (TOV) 8. Schedule of Values: United to Provide ASAP 9. Draft Construction Baseline Schedule:Attached A. Minimize closure of Bridge Road B. Requires minimal time between asphalt removal and patch-back 10. Staging: Pull off on Bridge Road, possible shoulders on Bridge Road 11. Field Office and Signs: 1) ERWSD is planning on putting out informational signs at either end of bike path closure 2) Others? 12. Survey:See attached Survey Specification Sheet 13. Construction Utilities:Any planned? 14. Project Meetings: Set meeting time and location 15. Equipment and Material Storage: United to detail plans, ask any questions 16. Testing: HP Kumar has been hired to perform testing. A. Compaction for Structural Fill B. Soil Laboratory Proctor Testing C. Concrete Testing—slump,air, unit weight D. Hot Bituminous Pavement Testing 17. Additions or Deletions to Contract: Field Orders(FO) and Request for Cost Proposes(RCP) will be used to document changes. 18. Special Conditions and Permit Requirements:Any? 19. As-Recorded Drawings:Submit to ERWSD 25. Miscellaneous F:115WSD\1admin..Contract.Forms..BID FORMS'..PreConMtg.doc — — -- 1 ILI.N a i I � 2:� II mLL r I u n o E i Ir 2 P i1 � 2 4 F mF+ kr •E z • II g 4.s g I E N v. c.N — , mow`. N ...1 a v ID n a O, . .~-i . .NI en .a. ... m m m COCO CO - Oa CO CO m m CO CO 1•+ .. ... m .. .. a V — -a r. T .4 a .. In co m .D ID .. N ID Ln in .n W WI .a .� m a a !1 a a ." cCo a 0 'o cco a. r, LL w w au CO .m. .m. CO CO CO .m-I CO z. N +. I. Q. N to N TI .. N a C @ a 9 m C 18 ' C a .al W C a 'a a U:' 4` 'A S, E a,_,a I- 3 a 3 U 2 I- U. I 2 ,23 1 U ---3 E - .- j an 1Ta T T T T T T T. m T. T T T•ii `T } } m m m m m m m le m m m m ea m m 7 a � 9 9 7 L 9 m 7 9 « g . •,., -_ O T .. N rl N N .. .. .. rl rl .. .. N N _ liCJ �n O O ,Z N 1b I ar O� m m a a n v o a a .. Y f= c 4 `a u . e m a m o vai O a nt. .tea ."'o b ` I E n p�O - c e: . CO CO « U to m R 3 m m a a r 7 E r c o x i- p a a m . O 1 0 a m c o ar a ° o a m ~ a .- 3 E n 0 a r< w ti. r N m a 2 W u i 2 a t h t a Q C x eaqt a CS - --- - _ V 2 _ V m -- E E m m r. E 2 E `c ...7;m n E m m m v E <'� m .z a 2 c 4 ¢ 8 8 m r2c c c 2 8 a+ i- m` le a `X I c 1-S1 In _ J.I ,_ a r F [ 1L1mrh1i. t1 .' C1Nto � _ V aig -c - _ 011,;41 ler °I Survey Specification Sheet EAGLE RIVER WATER& SANITATION DISTRICT All surveys, plats, construction drawings, and record drawings provided to the Eagle River Water and Sanitation District(ERWSD) or the Upper Eagle Regional Water Authority(UERWA) shall be tied to a horizontal coordinate system and a vertical datum. The horizontal coordinate system is NAD 1983 State Plane Colorado Central FIPS 0502(US Feet). The vertical datum is North American Vertical Datum of 1988(NAVD 88). Also provide epoch and projection settings in text format; for coordinate and datum used. If the survey collection is tied to a coordinate system other than the NAD 1983 State Plane Colorado Central FIPS 0502 (US Feet), conversion to Colorado State Plane Central coordinate system will be necessary before delivery to ERWSD. Collection in a"Modified"coordinate system is acceptable, but deliverables must be in the above coordinate system settings. Surveyor should be aware that ground to grid scaling factor is necessary for deliverables; and provide the scaling factor used to ERWSD. Survey drawings provided in AutoCAD format will be projected in the above coordinate system. In addition to drawing files, survey deliverables will include Tabular data in a spreadsheet format. Tabular Data will include survey point descriptions, Northing& Easting Coordinates, ERWSD Facility ID or"New"asset, and descriptive fields for the assets surveyed (like RIM elevations, invert elevations, and other useful information). ERWSD's intent for all surveys, plats, construction drawings, and record drawings is to bring them into our ESRI GIS and Asset Management Systems. Clean Water.Quality Life.`" 846 Forest Road Vail,Colorado 81657 Tel (970) 476-7480 Fax (970) 476-4089 erwsd.or0