HomeMy WebLinkAbout1709 Geneva Permit Worksheet.pdf Permit Fee Worksheet
ROW Use(min$50)
Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 0.15 x 3 x 100 = $ 45.00
Two Lane $ 0.45 x x = $ -
Three Lane $ 1.50 x x = $ -
Sidewalk/Bike Path $ 0.15 1 x x = $ -
Fee Months Sqft of Closure
Paved Surface $ 0.25 x x = $ -
Non-Paved Surface $ 0.05 x x = $ -
Fee Weeks Sqft of Closure
Core Areas Heated Streetscape $ 0.25 x x = $ -
Non-Construction Season(as defined by Town of Vail Municipal Code)
Fee Days Lft of Closure
Single Lane $ 1.00 x x = $ -
Two Lane $ 3.00 x x = $ -
Three Lane $ 6.00 x x = $ -
Sidewalk/Bike Path $ 0.50 x x = $
Fee Months Sqft of Closure
Paved Surface $ 1.00 x x = $ -
Non-Paved Surface $ 0.20 x x = $ -
Fee Das Sqft of Closure
Core Areas Heated Streetscape $ 0.50 x x = $ -
Sub-total $ 50.00
Street Cut(min$50)
Non-Moratorium Streets
Surface Fee S.ft of Cut
ACC/PCC $ 0.30 x 72 = $ 21.60
Brick Paver $ 1.00 x _ $ -
Pothole(each) $ 50.00 x = $ -
Non-Paved Surface $ 0.05 = $ -
Moratorium Streets
Surface Fee Sqft of Cut
ACC/PCC $ 8.00 1 x = $ -
Brick Paver $ 15 00 x = $ -
Pothole(each) $ 200.00 x = $ -
Non-Paved Surface L$ 0 25 = $ -
Sub-Total $ 50.00
Application/inspection Fee $ 100.00
Total Permit Fee $ 200.00
001 Ce/.eve .
ft
t7.,JQ r 1 Z y. i, 7 72 $ (D : 7,2D
( f C 4 t9- if, : 30 ?10 = ) (n
F 1PW15pecificationstRD WY Standards4Permit Fee Worksheet xis --------------
-�
4 Iv 50- (3.,,,4>