Loading...
HomeMy WebLinkAbout1709 Geneva Permit Worksheet.pdf Permit Fee Worksheet ROW Use(min$50) Construction Season(as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 0.15 x 3 x 100 = $ 45.00 Two Lane $ 0.45 x x = $ - Three Lane $ 1.50 x x = $ - Sidewalk/Bike Path $ 0.15 1 x x = $ - Fee Months Sqft of Closure Paved Surface $ 0.25 x x = $ - Non-Paved Surface $ 0.05 x x = $ - Fee Weeks Sqft of Closure Core Areas Heated Streetscape $ 0.25 x x = $ - Non-Construction Season(as defined by Town of Vail Municipal Code) Fee Days Lft of Closure Single Lane $ 1.00 x x = $ - Two Lane $ 3.00 x x = $ - Three Lane $ 6.00 x x = $ - Sidewalk/Bike Path $ 0.50 x x = $ Fee Months Sqft of Closure Paved Surface $ 1.00 x x = $ - Non-Paved Surface $ 0.20 x x = $ - Fee Das Sqft of Closure Core Areas Heated Streetscape $ 0.50 x x = $ - Sub-total $ 50.00 Street Cut(min$50) Non-Moratorium Streets Surface Fee S.ft of Cut ACC/PCC $ 0.30 x 72 = $ 21.60 Brick Paver $ 1.00 x _ $ - Pothole(each) $ 50.00 x = $ - Non-Paved Surface $ 0.05 = $ - Moratorium Streets Surface Fee Sqft of Cut ACC/PCC $ 8.00 1 x = $ - Brick Paver $ 15 00 x = $ - Pothole(each) $ 200.00 x = $ - Non-Paved Surface L$ 0 25 = $ - Sub-Total $ 50.00 Application/inspection Fee $ 100.00 Total Permit Fee $ 200.00 001 Ce/.eve . ft t7.,JQ r 1 Z y. i, 7 72 $ (D : 7,2D ( f C 4 t9- if, : 30 ?10 = ) (n F 1PW15pecificationstRD WY Standards4Permit Fee Worksheet xis -------------- -� 4 Iv 50- (3.,,,4>