HomeMy WebLinkAboutGround Engineering 17-6553 - 303 Gore Ck #8 - Matl Test Reports 180417.pdf
May 3, 2018
Subject: Interim Materials Testing Summary,
303 Gore Creek Row House # 8 - Materials
Testing / Special Inspections, Vail, Colorado
Job Number: 17-6553
TOV Permit #: B16-0321
Mr. Guy Cuccia
Cuccia Construction Inc.
PO Box 3613
Vail, CO 81658
Dear Mr. Cuccia,
For the period ending April 17, 2018, representatives of GROUND Engineering Consultants, Inc.
were on site to provide materials testing services at times scheduled by the Contractor,
Subcontractor and/or Owner. Our reports have been completed in the field as our testing and
observations were performed. The Contractor and applicable Sub Contractors were notified of
the testing results and/or observations prior to our departure from the project site. This summary
report includes the observation reports as well as the materials test results.
Please do not hesitate to contact this office if you have any questions concerning these reports.
Sincerely,
GROUND ENGINEERING CONSULTANTS, INC.
Chris Hutto, CET
Construction Services Manager
303 Gore Creek – Row House # 8 - Materials Testing/Special Inspections
Vail, Colorado
Job #17-6553 GROUND Engineering Consultants, Inc. Period Ending 4-17-2018
General Comments
Field Observation Reports
Client:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum
303 Gore Creek, Row House # 8
Guy Cuccia
Cuccia Construction, Inc.
PO Box 3613
Vail, CO 81658
Job No:
Date:
Field Representative:
General Comments
As scheduled, a representative arrived on-site to perform the below discussed services and we have
the following comments.
Shane Sorensen
17-6553
June 6, 2017
***OPEN HOLE***
The exposed materials at the base of the excavation for the north expansion foundation footings and SW interior spread footings
were observed. At approximate building elevations of 96' for north expansion and 96.8' for SW interior spread footings, the
exposed materials appeared to be comprised of primarily coarse grained sands and gavels with scattered cobbles that were
generally consistent with our experience of the anticipated conditions in this area. A mini-excavator was used to expose the
undisturbed native material in the foundation excavations, and a jumping jack used to recompact the surface. Inter-Mountain
Engineering, Inc. prepared a project geotechnical report for this site dated 8/25/1981, referenced in plans, but it is not available
at this time. Plans call for a maximum allowable soil bearing pressure of 2,000 psf. Quantitatively verifying bearing capacity
generally requires access to subsurface and Standard Penetration Test data. Based on the limited amount of available
subsurface date, the observed soils are deemed to be likely capable of providing an allowable bearing capacity of 2,000 psf,
however, the possibility of the presence of weak subsurface materials resulting in allowable bearing capacities less than 2,000 psf
cannot be ruled out from surface observations only. In the event that quantitative verification of allowable bearing capacity is
necessary, drilling and sampling should be performed. We did observe one area near the NW corner to be above optimum
moisture content due to previous saturation from roof drains, which are now rerouted. We recommended removing the soft, wet
material and replacing it with properly compacted native material.
Guy with Cuccia Construction was immediately notified of today's observations.
Client:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum
303 Gore Creek, Row House # 8
Guy Cuccia
Cuccia Construction, Inc.
PO Box 3613
Vail, CO 81658
Job No:
Date:
Field Representative:
General Comments
As scheduled, a representative arrived on-site to perform the below discussed services and we have
the following comments.
Shane Sorensen
17-6553
June 6, 2017
***OPEN HOLE***
We observed one area near the NW corner of the foundation excavation, which was somewhat soft previously, to have been
reworked with properly compacted native material. A stable platform was observed.
Guy with Cuccia Construction was immediately notified of today's observations.
303 Gore Creek – Row House # 8 - Materials Testing/Special Inspections
Vail, Colorado
Job #17-6553 GROUND Engineering Consultants, Inc. Period Ending 4-17-2018
Concrete
Field Observation Reports/ Compressive Strength
Client:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum
303 Gore Creek, Row House # 8
Guy Cuccia
Cuccia Construction, Inc.
PO Box 3613
Vail, CO 81658
Comments or Photos:
Results within Specifications?
Reinforcing Steel Checked?
Subgrade Tested?
Number of Cylinders Cast this Date:
Number of Pages Attached:
Field Representative:
Yes No Not Applicable
As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each
sample are approximate.
General Contractor:General Contractor Rep. Notified:Rep Notified
Job Number
Concrete Cover Report
Date:Date Job Number:Job NameJune 19, 2017 17-6553
Cuccia Construction Guy
4
1
Matty Baldwin
Client:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum
303 Gore Creek, Row House # 8
Guy Cuccia
Cuccia Construction, Inc.
PO Box 3613
Vail, CO 81658
Cylinders Cast on Ticket Number: Total Number of Cylinders Cast:
Cylinder Diameter (in.)
Cross Sectional Area (sq. in.)
Maximum Load (lbs.)
Compressive Strength (psi)
Test Date
Test Age (days)
Fracture Type
Average 28-Day Compressive Strength (psi):
Placement Contractor:Earthwork Contractor Rep. Notified:Rep Notified
Report Date:Date Job Number:Job Name
General Contractor:General Contractor Rep. Notified:Rep Notified
Placement Date:
Job Number
Placement Method: Finish Method:
Item Number /Structure Type:
Concrete Supplier: Mix Identification:
Total Cubic Yards Placed: Weather/Temp.:
(°F)(pcf)
Placement Location:
Specifications
Specified Strength (psi): Air Content (%):
Slump (in.): Temperature (°F):
Concrete Field Properties
Test
No.Sample Location Truck
Number
Ticket
Number
Batch
Time
(gal.)
Test Time
Slump/
Spread
C143
Air
Content
C231
Conc.
Temp.
C1064
Unit
Weight
C138
Water
Added
(inches) (%)
Compressive Strength Results (ASTM C39)
Laboratory ID:
Field Technician:
Comments:
July 17, 2017 17-6553
June 19, 2017
Cuccia Construction Guy
Vasquez Concrete Gilbert
United Companies 37610449
9 Sunny and 80
Line pump Hand and vibrate
Footers
Basement footers
4,500 N/A
N/A 50-90
1
NW basement footer
56393 33212633 2:40pm 3:40pm 4 1/2 4.5 83 141.0 8
33212633 4 5275
4.00
12.57
52,730
4,190
6/26/17
7
3
4.00
12.57
77,050
6,130
7/17/17
28
5
4.00
12.57
71,940
5,720
7/17/17
28
5
4.00
12.57
73,610
5,860
7/17/17
28
5
5,900
Matty Baldwin
Client:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum
303 Gore Creek, Row House # 8
Guy Cuccia
Cuccia Construction, Inc.
PO Box 3613
Vail, CO 81658
Comments or Photos:
Results within Specifications?
Reinforcing Steel Checked?
Subgrade Tested?
Number of Cylinders Cast this Date:
Number of Pages Attached:
Field Representative:
Yes No Not Applicable
As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each
sample are approximate.
General Contractor:General Contractor Rep. Notified:Rep Notified
Job Number
Concrete Cover Report
Date:Date Job Number:Job NameJune 23, 2017 17-6553
Cuccia Construction Guy
4
1
Emanuel Aragon
Client:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum
303 Gore Creek, Row House # 8
Guy Cuccia
Cuccia Construction, Inc.
PO Box 3613
Vail, CO 81658
Cylinders Cast on Ticket Number: Total Number of Cylinders Cast:
Cylinder Diameter (in.)
Cross Sectional Area (sq. in.)
Maximum Load (lbs.)
Compressive Strength (psi)
Test Date
Test Age (days)
Fracture Type
Average 28-Day Compressive Strength (psi):
Placement Contractor:Earthwork Contractor Rep. Notified:Rep Notified
Report Date:Date Job Number:Job Name
General Contractor:General Contractor Rep. Notified:Rep Notified
Placement Date:
Job Number
Placement Method: Finish Method:
Item Number /Structure Type:
Concrete Supplier: Mix Identification:
Total Cubic Yards Placed: Weather/Temp.:
(°F)(pcf)
Placement Location:
Specifications
Specified Strength (psi): Air Content (%):
Slump (in.): Temperature (°F):
Concrete Field Properties
Test
No.Sample Location Truck
Number
Ticket
Number
Batch
Time
(gal.)
Test Time
Slump/
Spread
C143
Air
Content
C231
Conc.
Temp.
C1064
Unit
Weight
C138
Water
Added
(inches) (%)
Compressive Strength Results (ASTM C39)
Laboratory ID:
Field Technician:
Comments:
July 21, 2017 17-6553
June 23, 2017
Cuccia Construction Guy
Vasquez Concrete Gilbert
United Companies 37610449
7 Sunny and 80
Line pump Hand and vibrate
Walls
Basement walls
4,500 N/A
N/A 50-90
2
NE corner
7143 310919 1:49 3:10 3 6.0 78 139.1 0
310919 4 5310
4.00
12.57
56,900
4,530
6/30/17
7
5
4.00
12.57
78,510
6,250
7/21/17
28
3
4.00
12.57
78,550
6,250
7/21/17
28
3
4.00
12.57
77,730
6,180
7/21/17
28
3
6,230
Emanuel Aragon
Client:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum
303 Gore Creek, Row House # 8
Guy Cuccia
Cuccia Construction, Inc.
PO Box 3613
Vail, CO 81658
Comments or Photos:
Results within Specifications?
Reinforcing Steel Checked?
Subgrade Tested?
Number of Cylinders Cast this Date:
Number of Pages Attached:
Field Representative:
Yes No Not Applicable
As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each
sample are approximate.
General Contractor:General Contractor Rep. Notified:Rep Notified
Job Number
Concrete Cover Report
Date:Date Job Number:Job NameJuly 31, 2017 17-6553
Cuccia Construction Guy
4
1
Matty Baldwin
Client:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum
303 Gore Creek, Row House # 8
Guy Cuccia
Cuccia Construction, Inc.
PO Box 3613
Vail, CO 81658
Cylinders Cast on Ticket Number: Total Number of Cylinders Cast:
Cylinder Diameter (in.)
Cross Sectional Area (sq. in.)
Maximum Load (lbs.)
Compressive Strength (psi)
Test Date
Test Age (days)
Fracture Type
Average 28-Day Compressive Strength (psi):
Placement Contractor:Earthwork Contractor Rep. Notified:Rep Notified
Report Date:Date Job Number:Job Name
General Contractor:General Contractor Rep. Notified:Rep Notified
Placement Date:
Job Number
Placement Method: Finish Method:
Item Number /Structure Type:
Concrete Supplier: Mix Identification:
Total Cubic Yards Placed: Weather/Temp.:
(°F)(pcf)
Placement Location:
Specifications
Specified Strength (psi): Air Content (%):
Slump (in.): Temperature (°F):
Concrete Field Properties
Test
No.Sample Location Truck
Number
Ticket
Number
Batch
Time
(gal.)
Test Time
Slump/
Spread
C143
Air
Content
C231
Conc.
Temp.
C1064
Unit
Weight
C138
Water
Added
(inches) (%)
Compressive Strength Results (ASTM C39)
Laboratory ID:
Field Technician:
Comments:
August 28, 2017 17-6553
July 31, 2017
Cuccia Construction Guy
Vasquez Concrete Gilbert
Casey Concrete 7.0 3/8 F 70/30 2"
7 Sunny and 75
Line pump Hand and vibrate
Footers
Basement footers
4,500 N/A
N/A 50-90
3
SE basement footer
135 311520 12:35pm 2:00pm 5 3.5 83 142.7 6
311520 4 5427
4.00
12.57
52,620
4,190
8/7/17
7
5
4.00
12.57
75,290
5,990
8/28/17
28
5
4.00
12.57
75,780
6,030
8/28/17
28
5
4.00
12.57
77,320
6,150
8/28/17
28
5
6,060
Matty Baldwin
Client:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum
303 Gore Creek, Row House # 8
Guy Cuccia
Cuccia Construction, Inc.
PO Box 3613
Vail, CO 81658
Comments or Photos:
Results within Specifications?
Reinforcing Steel Checked?
Subgrade Tested?
Number of Cylinders Cast this Date:
Number of Pages Attached:
Field Representative:
Yes No Not Applicable
As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each
sample are approximate.
General Contractor:General Contractor Rep. Notified:Rep Notified
Job Number
Concrete Cover Report
Date:Date Job Number:Job NameAugust 10, 2017 17-6553
Cuccia Construction Guy
4
1
Matty Baldwin
Client:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum
303 Gore Creek, Row House # 8
Guy Cuccia
Cuccia Construction, Inc.
PO Box 3613
Vail, CO 81658
Cylinders Cast on Ticket Number: Total Number of Cylinders Cast:
Cylinder Diameter (in.)
Cross Sectional Area (sq. in.)
Maximum Load (lbs.)
Compressive Strength (psi)
Test Date
Test Age (days)
Fracture Type
Average 28-Day Compressive Strength (psi):
Placement Contractor:Earthwork Contractor Rep. Notified:Rep Notified
Report Date:Date Job Number:Job Name
General Contractor:General Contractor Rep. Notified:Rep Notified
Placement Date:
Job Number
Placement Method: Finish Method:
Item Number /Structure Type:
Concrete Supplier: Mix Identification:
Total Cubic Yards Placed: Weather/Temp.:
(°F)(pcf)
Placement Location:
Specifications
Specified Strength (psi): Air Content (%):
Slump (in.): Temperature (°F):
Concrete Field Properties
Test
No.Sample Location Truck
Number
Ticket
Number
Batch
Time
(gal.)
Test Time
Slump/
Spread
C143
Air
Content
C231
Conc.
Temp.
C1064
Unit
Weight
C138
Water
Added
(inches) (%)
Compressive Strength Results (ASTM C39)
Laboratory ID:
Field Technician:
Comments:
September 7, 2017 17-6553
August 10, 2017
Cuccia Construction Guy
Vasquez Concrete Gilbert
Casey Concrete 7.0 3/8 F 70/30 2"
4 Sunny and 75
Line pump Hand and vibrate
Footers and foundation walls
Center footers and foundation Walls
4,500 N/A
N/A 50-90
4
Center footer
149 311732 1:20pm 2:10pm 3 1/2 3.5 82 143.7 0
311732 4 5480
4.00
12.57
68,520
5,450
8/17/17
7
3
4.00
12.57
89,660
7,130
9/7/17
28
2
4.00
12.57
88,500
7,040
9/7/17
28
4
4.00
12.57
91,880
7,310
9/7/17
28
5
7,160
Matty Baldwin
Client:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum
303 Gore Creek, Row House # 8
Guy Cuccia
Cuccia Construction, Inc.
PO Box 3613
Vail, CO 81658
Comments or Photos:
Results within Specifications?
Reinforcing Steel Checked?
Subgrade Tested?
Number of Cylinders Cast this Date:
Number of Pages Attached:
Field Representative:
Yes No Not Applicable
As scheduled, a representative visited the project site to perform periodic concrete testing. The locations of each
sample are approximate.
General Contractor:General Contractor Rep. Notified:Rep Notified
Job Number
Concrete Cover Report
Date:Date Job Number:Job NameSeptember 20, 2017 17-6553
Cuccia Construction Guy
4
1
Alex Schultz
Client:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum
303 Gore Creek, Row House # 8
Guy Cuccia
Cuccia Construction, Inc.
PO Box 3613
Vail, CO 81658
Cylinders Cast on Ticket Number: Total Number of Cylinders Cast:
Cylinder Diameter (in.)
Cross Sectional Area (sq. in.)
Maximum Load (lbs.)
Compressive Strength (psi)
Test Date
Test Age (days)
Fracture Type
Average 28-Day Compressive Strength (psi):
Placement Contractor:Earthwork Contractor Rep. Notified:Rep Notified
Report Date:Date Job Number:Job Name
General Contractor:General Contractor Rep. Notified:Rep Notified
Placement Date:
Job Number
Placement Method: Finish Method:
Item Number /Structure Type:
Concrete Supplier: Mix Identification:
Total Cubic Yards Placed: Weather/Temp.:
(°F)(pcf)
Placement Location:
Specifications
Specified Strength (psi): Air Content (%):
Slump (in.): Temperature (°F):
Concrete Field Properties
Test
No.Sample Location Truck
Number
Ticket
Number
Batch
Time
(gal.)
Test Time
Slump/
Spread
C143
Air
Content
C231
Conc.
Temp.
C1064
Unit
Weight
C138
Water
Added
(inches) (%)
Compressive Strength Results (ASTM C39)
Laboratory ID:
Field Technician:
Comments:
October 18, 2017 17-6553
September 20, 2017
Cuccia Construction Guy
Vasquez Concrete Gilbert
Casey Concrete 7.0 3/8 F 70/30 2"
7 Sunny and 66
Line pump Hand and vibrate
Spread Footing
E edge of foundation, S side of foundation on eastern half, west edge of foundation 10' from the S side
3,000 N/A
N/A 50-90
5
S side of foundation
143 312447 9:54am 11:45am 3 3/4 2.9 68 143.0 0
312447 4 5603
4.00
12.57
47,160
3,750
9/27/17
7
5
4.00
12.57
68,210
5,430
10/18/17
28
3
4.00
12.57
69,320
5,510
10/18/17
28
3
4.00
12.57
72,560
5,770
10/18/17
28
5
5,570
Alex Schultz
303 Gore Creek – Row House # 8 - Materials Testing/Special Inspections
Vail, Colorado
Job #17-6553 GROUND Engineering Consultants, Inc. Period Ending 4-17-2018
Drilled & Epoxied Reinforcing Steel
Field Observation Reports
Client:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum
303 Gore Creek, Row House # 8
Guy Cuccia
Cuccia Construction, Inc.
PO Box 3613
Vail, CO 81658
Comments or Photos:
Yes No
Discrepancies Reported this Date?
No. of Pages Attached:
Field Representative:
Drill and Epoxy Cover Report
Date:Date Job NameJob Number:Job Number
As scheduled, a representative visited the project site to perform special inspections for drill and epoxy at
locations requested.
General Contractor:General Contractor Rep. Notified:Rep Notified
June 16, 2017 17-6553
Cuccia Construction Guy
1
Shane Sorensen/Matty Baldwin
Client:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum
303 Gore Creek, Row House # 8
Guy Cuccia
Cuccia Construction, Inc.
PO Box 3613
Vail, CO 81658
Location: 1.)
2.)
3.)
4.)
Orientation (vertical/horizontal): 1.) 3.)
2.) 4.)
Hole Diameter (inches): 1.) Length (inches): 1.)
2.) 2.)
3.) 3.)
4.) 4.)
Hole Spacing (inches): 1.) 3.)
2.) 4.)
Drilling Equipment:
Method to Clean Hole:
Epoxy Type:
Epoxy Expiration:
Placement Method:
Type (rebar/bolt/anchor): 1.) Size: 1.) Length (inches) 1.)
2.) 2.) 2.)
3.) 3.) 3.)
4.) 4.) 4.)
Placement Method:
Additional Reinforcing Steel:
Field Representative:
Comments:
Reinforcement
Epoxy
Documents Used:
Drill and Epoxy
Drilling
Subcontractor: Rep. Notified:
pGeneral Contractor: Rep. Notified:
p
Job Number:Report Date:June 16, 2017 17-6553
Cuccia Construction Guy
Vasquez Concrete Richard
Plans
Into existing foundation for new foundation along west side of unit, first two sections
Underpinning existing footing for new footing along east side of unit, first two sections
Horizontal
Vertical
3/4 4 1/2
3/4 4 1/2
16
16
Hammer drill
Wire brush, compressed air
Hilti HIY-HY 200-R
02/2018
Hilti Epoxy gun
90° hooked rebar #5 6x36
Rebar #5 36
Hand set
For location 2, contractor chose to splice rebar hooks to epoxy dowels due to space constraints beneath footing.
Shane Sorensen/Matty Baldwin
Client:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum
303 Gore Creek, Row House # 8
Guy Cuccia
Cuccia Construction, Inc.
PO Box 3613
Vail, CO 81658
Comments or Photos:
Yes No
Discrepancies Reported this Date?
No. of Pages Attached:
Field Representative:
Drill and Epoxy Cover Report
Date:Date Job NameJob Number:Job Number
As scheduled, a representative visited the project site to perform special inspections for drill and epoxy at
locations requested.
General Contractor:General Contractor Rep. Notified:Rep Notified
July 31, 2017 17-6553
Cuccia Construction Guy
1
Matty Baldwin/ Shane Sorensen
Client:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum
303 Gore Creek, Row House # 8
Guy Cuccia
Cuccia Construction, Inc.
PO Box 3613
Vail, CO 81658
Location: 1.)
2.)
3.)
4.)
Orientation (vertical/horizontal): 1.) 3.)
2.) 4.)
Hole Diameter (inches): 1.) Length (inches): 1.)
2.) 2.)
3.) 3.)
4.) 4.)
Hole Spacing (inches): 1.) 3.)
2.) 4.)
Drilling Equipment:
Method to Clean Hole:
Epoxy Type:
Epoxy Expiration:
Placement Method:
Type (rebar/bolt/anchor): 1.) Size: 1.) Length (inches) 1.)
2.) 2.) 2.)
3.) 3.) 3.)
4.) 4.) 4.)
Placement Method:
Additional Reinforcing Steel:
Field Representative:
Comments:
Reinforcement
Epoxy
Documents Used:
Drill and Epoxy
Drilling
Subcontractor: Rep. Notified:
pGeneral Contractor: Rep. Notified:
p
Job Number:Report Date:July 31, 2017 17-6553
Cuccia Construction Guy
Vasquez Concrete Richard
Plans
Into existing foundation for new foundation along west side of unit, last two sections
Underpinning existing footing for new footing along east side of unit, last section
Horizontal
Vertical
3/4 4 1/2
3/4 4 1/2
16
16
Hammer drill
Wire brush, compressed air
Hilti HIY-HY 200-R
01/2018
Hilti Epoxy gun
Rebar #5 36
90° hooked rebar, 90 into slab #5 6x36x16
Hand set
For location 1, contractor chose to splice rebar hooks to epoxy dowels due to space constraints beneath footing.
Matty Baldwin/ Shane Sorensen
Client:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum
303 Gore Creek, Row House # 8
Guy Cuccia
Cuccia Construction, Inc.
PO Box 3613
Vail, CO 81658
Comments or Photos:
Yes No
Discrepancies Reported this Date?
No. of Pages Attached:
Field Representative:
Drill and Epoxy Cover Report
Date:Date Job NameJob Number:Job Number
As scheduled, a representative visited the project site to perform special inspections for drill and epoxy at
locations requested.
General Contractor:General Contractor Rep. Notified:Rep Notified
September 18, 2017 17-6553
Cuccia Construction Guy
1
Matty Baldwin/ Shane Sorensen
Client:
www.groundeng.com
Englewood, Commerce City, Loveland, Granby, Gypsum
303 Gore Creek, Row House # 8
Guy Cuccia
Cuccia Construction, Inc.
PO Box 3613
Vail, CO 81658
Location: 1.)
2.)
3.)
4.)
Orientation (vertical/horizontal): 1.) 3.)
2.) 4.)
Hole Diameter (inches): 1.) Length (inches): 1.)
2.) 2.)
3.) 3.)
4.) 4.)
Hole Spacing (inches): 1.) 3.)
2.) 4.)
Drilling Equipment:
Method to Clean Hole:
Epoxy Type:
Epoxy Expiration:
Placement Method:
Type (rebar/bolt/anchor): 1.) Size: 1.) Length (inches) 1.)
2.) 2.) 2.)
3.) 3.) 3.)
4.) 4.) 4.)
Placement Method:
Additional Reinforcing Steel:
Field Representative:
Comments:
Reinforcement
Epoxy
Documents Used:
Drill and Epoxy
Drilling
Subcontractor: Rep. Notified:
pGeneral Contractor: Rep. Notified:
p
Job Number:Report Date:September 18, 2017 17-6553
Cuccia Construction Guy
Vasquez Concrete Gilbert
Plans
SE Wall from existing foundation wall to proposed wall
SE footer to proposed footer
SW stem wall into upper proposed stem wall
SW stem wall into upper proposed stem wall
Horizontal Vertical
Vertical Horizontal
3/4 6
3/4 5
3/4 6
3/4 5
12 12
12 12
Hammer drill
Wire brush, compressed air
Hilti HIY-HY 200-R
02/2018
Hilti Epoxy gun
Rebar #5 54
Rebar #5 36
Rebar #5 54
Rebar #5 24
Hand set
For location 2, contractor chose to splice rebar hooks to epoxy dowels due to space constraints beneath footing.
Matty Baldwin/ Shane Sorensen
303 Gore Creek – Row House # 8 - Materials Testing/Special Inspections
Vail, Colorado
Job #17-6553 GROUND Engineering Consultants, Inc. Period Ending 4-17-2018
Structural Steel
Field Observation Report & Discrepancy List
Building - Steel
1st floor to 5th floor (roof)Placement Location:
Structure Type:
General Contractor:
Steel Erector/Fabricator:
Cuccia Construction
Trinity Welding
Performed by:Lee Royse
As directed by Guy Cuccia with Cuccia Construction:Summary Comments:
Visual Special Inspections
Visual Non-Compliance
Building - Steel, Non-Compliant
Connection Types:
Description of Non-Compliance:
Beam to Beam|Beam to Column|Angle to Beam|Anchored Connection of Plate
GROUND has not received Welder Qualification Test Records (WQTRs), Weld Procedure Specifications (WPS)
for welds performed and continuity logs if the WQTRs are over six months old for AWS D1.1 from Trinity
Welding.
From level two to roof level there are column base plate to column base plate bolted connections. Per structural
general note C these are to be A325 high strength bolts. Currently installed these are not A325 bolts.
At each column base plate and column to beam these connections are to be bolted per details 8/S5 and 9/S5
and 2/S3. These connections are currently welded on two sides in lieu of bolting. This is from level 1-5 at all
connections.
At numerous connections from level 1-5 slag has not been removed from the weld. This is to be done before
inspection per AWS D1.1:15 C6 5.29.2.
On level 3 on the outside wall in the center the beam to Beam connection has a shim stack installed and the
beam to beam connection has no shear plate installed.
On level 3-4 at the center of the outside wall a column has been covered and cannot be inspected.
On level four to roof a column to beam connection has plates added and has no detail provided for this
connection. This is at south side.
On level one the anchored connections of column base plates to foundation the nuts are loose and one base
plate has anchor bolts missing.
On level one at the center of the building the shear plates to beam do not have a weld detail for one side of
shear plate to beam per details 16/S5 and 17/S5. Currently the shear plates are welded on one side to the
beam with approximately a 1/8" to 3/16" fillet weld.
On level two on the north side the C Channel to C Channel connections for the cantilever deck does not have a
weld detail per detail 7/S5.
Cuccia Construction Inc.
PO Box 3613
Vail, CO 81658
Guy Cuccia
303 Gore Creek, Row House # 8
Client:
Oct 6, 2017
Work Order Date:
Work Order No.:
Structural Steel
17-6553.StructuralSteel(Field).0001; ver: Report Date:
Oct 5, 2017 Reviewed by:Paul Gustafson
Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not
be reproduced, except in full, without the written permission of GROUND Engineering Consultants, Inc.
www.groundeng.com
Englewood | Commerce City | Loveland | Granby | Gypsum Page 1 of 4
The following individuals were notifed of all results while on-site.
Name Company
Notifications
Guy Cuccia Cuccia Construction
Discrepancies
The following discrepancies were added as a result of services performed. It is the contractor's responsibility to resolve reported
discrepancies and schedule retesting. A list of open discrepancies can be provided upon request.
Number Description
Structural Steel (Field) 1 GROUND has not received Welder Qualification Test Records (WQTRs),
Weld Procedure Specifications (WPS) for welds performed and continuity
logs if the WQTRs are over six months old for AWS D1.1 from Trinity
Welding.
Structural Steel (Field) 10 On level two on the north side the C Channel to C Channel connections for
the cantilever deck does not have a weld detail per detail 7/S5.
Structural Steel (Field) 2 From level two to roof level there are column base plate to column base
plate bolted connections. Per structural general note C these are to be
A325 high strength bolts. Currently installed these are not A325 bolts.
Structural Steel (Field) 3 At each column base plate and column to beam these connections are to
be bolted per details 8/S5 and 9/S5 and 2/S3. These connections are
currently welded on two sides in lieu of bolting. This is from level 1-5 at all
connections.
Structural Steel (Field) 4 At numerous connections from level 1-5 slag has not been removed from
the weld. This is to be done before inspection per AWS D1.1:15 C6 5.29.2.
Structural Steel (Field) 5 On level 3 on the outside wall in the center the beam to Beam connection
has a shim stack installed and the beam to beam connection has no shear
plate installed.
Structural Steel (Field) 6 On level 3-4 at the center of the outside wall a column has been covered
and cannot be inspected.
Structural Steel (Field) 7 On level four to roof a column to beam connection has plates added and
has no detail provided for this connection. This is at south side.
Structural Steel (Field) 8 On level one the anchored connections of column base plates to
foundation the nuts are loose and one base plate has anchor bolts missing.
Structural Steel (Field) 9 On level one at the center of the building the shear plates to beam do not
have a weld detail for one side of shear plate to beam per details 16/S5
and 17/S5. Currently the shear plates are welded on one side to the beam
with approximately a 1/8" to 3/16" fillet weld.
1) WPS - Welding Procedure Specification : The detailed methods and practices including all joint welding procedures involved in the production of
weldments. All prequalified WPS's shall be written. WPS's should be assigned an identification #.
2) WQTR - Welder Qualification Test Record : Performance qualification test to determine a welder's ability to produce sound welds. This shall be
performed in conformance with a WPS. Identification # of the WPS shall be displayed on the WQTR.
3) Continuity Record : Clause 4.2.3 Period of Effectiveness. A welder's qualification is considered remaining in effect provided; the period of time that
the welder does not engage in the given process does not exceed 6 months, the contract documents state differently, or there is a specific reason to
question a welder's ability to produce sound welds. The welder's employer should maintain records of each welder's use of qualified welding
processes.
4) Common Processes : SMAW - Shielded Metal Arc Welding, commonly referred to as stick welding.
FCAW - Flux Cored Arc Welding, commonly referred to as wire feed.
GMAW - Gas Metal Arc Welding, commonly referred to as wire feed.
SW - Stud Welding, commonly referred to as headed anchor studs (HAS), threaded anchor studs (TAS), and deformed anchor studs (DAS).
5) Most commonly used welding codes: AWS D1.1 - Structural Welding Code, covers carbon or low alloy steels 1/8-inch or thicker.
AWS D1.3 - Structural Welding Code Sheet Steel, covers structural sheet/strip steels including cold formed members (Metal Studs) equal to or
less than 3/16-inch. Decking usually requires single and double sheet certification.
AWS D1.4 - Structural Welding Code Reinforcing Steel, covers reinforcing steel to reinforcing steel and reinforcing steel to carbon or low alloy
Weld Certification Submittal Information
Cuccia Construction Inc.
PO Box 3613
Vail, CO 81658
Guy Cuccia
303 Gore Creek, Row House # 8
Client:
Oct 6, 2017
Work Order Date:
Work Order No.:
Structural Steel
17-6553.StructuralSteel(Field).0001; ver: Report Date:
Oct 5, 2017 Reviewed by:Paul Gustafson
Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not
be reproduced, except in full, without the written permission of GROUND Engineering Consultants, Inc.
www.groundeng.com
Englewood | Commerce City | Loveland | Granby | Gypsum Page 2 of 4
steels, this includes A706 weldable bar.
Photos
These are not A325 structural bolts. Relates to discrepancy number 2.Column cap plates and base plates to be bolted. All locations welded in
lieu of bolting and slag has not been removed. This relates to discrepancy
number 3 and 4.
Shim stack installed and no shear plate installed. This relates to
discrepancy number 5.
Column covered on level 3 and cannot be inspected on this date. This
relates to discrepancy number 6.
Cuccia Construction Inc.
PO Box 3613
Vail, CO 81658
Guy Cuccia
303 Gore Creek, Row House # 8
Client:
Oct 6, 2017
Work Order Date:
Work Order No.:
Structural Steel
17-6553.StructuralSteel(Field).0001; ver: Report Date:
Oct 5, 2017 Reviewed by:Paul Gustafson
Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not
be reproduced, except in full, without the written permission of GROUND Engineering Consultants, Inc.
www.groundeng.com
Englewood | Commerce City | Loveland | Granby | Gypsum Page 3 of 4
Plates added to column base on level 4. No detail provided for this
connection. This relates to discrepancy number 7.
Missing anchor connections on level 1. Relates to discrepancy number 8.
Loose anchor connections on level 1. Relates to discrepancy number 8.Shear plates to beam have no weld detail provided for one side per detail
16 and 17 on S5. This is on level 1. Relates to discrepancy number 9.
Cuccia Construction Inc.
PO Box 3613
Vail, CO 81658
Guy Cuccia
303 Gore Creek, Row House # 8
Client:
Oct 6, 2017
Work Order Date:
Work Order No.:
Structural Steel
17-6553.StructuralSteel(Field).0001; ver: Report Date:
Oct 5, 2017 Reviewed by:Paul Gustafson
Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not
be reproduced, except in full, without the written permission of GROUND Engineering Consultants, Inc.
www.groundeng.com
Englewood | Commerce City | Loveland | Granby | Gypsum Page 4 of 4
Miscellaneous | Wood frame house with
steel structures.
Reinspected open discrepancy items.Placement Location:
Structure Type:
General Contractor:
Steel Erector/Fabricator:
Cuccia Construction
Trinity Welding
Performed by:Lee Royse
As directed by Guy Cuccia with Cuccia Construction:
Reinspected discrepancy numbers 1-10 and added tracking to these items.
Summary Comments:
The following individuals were notifed of all results while on-site.
Name Company
Notifications
Guy Cuccia Cuccia Construction
Discrepancies
The following discrepancies were added as a result of services performed. It is the contractor's responsibility to resolve reported
discrepancies and schedule retesting. A list of open discrepancies can be provided upon request.
Number Description
Structural Steel (Field) 11 At the fireplace on level 3 the W10x15 over the stone has no connection
detail for this connection.
Structural Steel (Field) 12 On level four in the north guest master bedroom the HSS tube column to
roof beam connection has a shim between the column and roof beam. This
shim is not per project plans.
Visual Special Inspections
Visual Non-Compliance
Building - Steel, Non-Compliant
Connection Types:
Description of Non-Compliance:
Beam to HSS|Beam to Beam
At the fireplace on level 3 the W10x15 over the stone has no connection detail for this connection.
On level four in the north guest master bedroom the HSS tube column to roof beam connection has a shim
between the column and roof beam. This shim is not per project plans.
Photos
W10x15 above fireplace on level 3 with no connection detail.1/8 inch shim added between HSS column and roof beam on level 4 in the
north guest master bedroom.
Cuccia Construction Inc.
PO Box 3613
Vail, CO 81658
Guy Cuccia
303 Gore Creek, Row House # 8
Client:
Nov 17, 2017
Work Order Date:
Work Order No.:
Structural Steel
17-6553.StructuralSteel(Field).0002; ver: Report Date:
Nov 16, 2017 Reviewed by:Paul Gustafson
Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not
be reproduced, except in full, without the written permission of GROUND Engineering Consultants, Inc.
www.groundeng.com
Englewood | Commerce City | Loveland | Granby | Gypsum Page 1 of 1
Miscellaneous | Wood frame house remodel
with steel structures added.
EmailPlacement Location:
Structure Type:
General Contractor:
Steel Erector/Fabricator:
Cuccia Construction
Trinity Welding
Performed by:Lee Royse
GROUND has received EOR observation report dated 27 November 2017 in reference to discrepancy numbers 1, 3, 4, 5, 7,
10, 11 and 12 and added tracking to these items.
Summary Comments:
Visual Special Inspections
Visual Non-Compliance
Cuccia Construction Inc.
PO Box 3613
Vail, CO 81658
Guy Cuccia
303 Gore Creek, Row House # 8
Client:
Jan 22, 2018
Work Order Date:
Work Order No.:
Structural Steel
17-6553.StructuralSteel(Field).0003; ver: Report Date:
Jan 19, 2018 Reviewed by:Paul Gustafson
Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not
be reproduced, except in full, without the written permission of GROUND Engineering Consultants, Inc.
www.groundeng.com
Englewood | Commerce City | Loveland | Granby | Gypsum Page 1 of 1
Miscellaneous
Level’s 1-5Placement Location:
Structure Type:
General Contractor:
Steel Erector/Fabricator:
Cuccia Construction
Trinity Welding
Performed by:Barry Bowland
As directed by Guy Cuccia with Cuccia Construction.
Ground was onsite to review remaining open discrepancies.
Summary Comments:
The following individuals were notifed of all results while on-site.
Name Company
Notifications
Guy Cuccia Cuccia Construction
Visual Special Inspections
Other Connection Types:Column cap plate to beam.
Connection Comments:Ground reinspected the following:
Discrepancy #1-Ground reviewed with the General Contractor the remaining documents required to close out
this discrepancy. Tracking added.
Discrepancy #4-Ground did a walkthrough of level’s 1-5 with Guy Cuccia of Cuccia Construction. All exposed
connections were reviewed, any welds that had slag remaining were de-slagged while Ground remained
onsite. Ground found the de-slagged welds to be visually acceptable and in general conformance with project
plans and AWS D1.1 2015 Clause 6, Table 6.1. This item is now closed.
Visual Non-Compliance
Cuccia Construction Inc.
PO Box 3613
Vail, CO 81658
Guy Cuccia
303 Gore Creek, Row House # 8
Client:
Mar 16, 2018
Work Order Date:
Work Order No.:
Structural Steel
17-6553.StructuralSteel(Field).0006; ver: Report Date:
Mar 15, 2018 Reviewed by:Austin Nicodemus
Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not
be reproduced, except in full, without the written permission of GROUND Engineering Consultants, Inc.
www.groundeng.com
Englewood | Commerce City | Loveland | Granby | Gypsum Page 1 of 1
Miscellaneous
Onsite with Guy Cuccia.Placement Location:
Structure Type:
General Contractor:
Steel Erector/Fabricator:
Cuccia Construction
Trinity Welding
Performed by:Barry Bowland
As directed by Guy Cuccia with Cuccia Construction.Summary Comments:
The following individuals were notifed of all results while on-site.
Name Company
Notifications
Guy Cuccia Cuccia Construction
Visual Special Inspections
Connection Comments:Discrepancy #1-Ground received the welding continuity log for Trinity Welding. This item is now closed.
Visual Non-Compliance
Cuccia Construction Inc.
PO Box 3613
Vail, CO 81658
Guy Cuccia
303 Gore Creek, Row House # 8
Client:
Apr 18, 2018
Work Order Date:
Work Order No.:
Structural Steel
17-6553.StructuralSteel(Field).0007; ver: 1Report Date:
Apr 17, 2018 Reviewed by:Austin Nicodemus
Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not
be reproduced, except in full, without the written permission of GROUND Engineering Consultants, Inc.
www.groundeng.com
Englewood | Commerce City | Loveland | Granby | Gypsum Page 1 of 1
Structural Steel
(Field) 1
GROUND has not received Welder
Qualification Test Records (WQTRs), Weld
Procedure Specifications (WPS) for welds
performed and continuity logs if the WQTRs
are over six months old for AWS D1.1 from
Trinity Welding.
Lee Royse 10/5/2017
Discrepancy #1-Ground reviewed with the
General Contractor the remaining documents
required to close out this discrepancy.
3/15/2018Barry Bowland
GROUND has not received the WPS and the
continuity logs at this time. This item will
remain open at this time.
1/19/2018Lee Royse
GROUND has received the WQTRs for trinity
Welding but have not received the WPS for
welds performed and continuity logs due to
the WQTRs are over six months old. This item
will remain open.
11/16/2017Lee Royse
Ground received the Continuity Log for Trinity
Welding.
4/17/2018Barry Bowland Per Plan
Structural Steel
(Field) 2
From level two to roof level there are column
base plate to column base plate bolted
connections. Per structural general note C
these are to be A325 high strength bolts.
Currently installed these are not A325 bolts.
Lee Royse 10/5/2017
A325 bolts were found installed where non
compliant bolts were located. These
connections were found to be in the snug tight
condition with plies in firm contact. This item
is now closed.
11/16/2017Lee Royse Per Plan
Structural Steel
(Field) 3
At each column base plate and column to
beam these connections are to be bolted per
details 8/S5 and 9/S5 and 2/S3. These
connections are currently welded on two sides
in lieu of bolting. This is from level 1-5 at all
connections.
Lee Royse 10/5/2017
Per details 9/S5 and 8/S5 the weld is to be a
single bevel weld. The depth of preparation is
not called out and GROUND is not able to
verify that a bevel has been installed before
welding. This item will remain open.
11/16/2017Lee Royse
This item is acceptable as is per EOR
observation report dated 27 November 2017.
This item is now closed.
1/19/2018Lee Royse Per Structural
EOR Letter
Cuccia Construction Inc.
PO Box 3613
Vail, CO 81658
Guy Cuccia
303 Gore Creek, Row House # 8
Client:
Date: Project No.
Project Discrepancy Log
17-6553May 03, 2018
Number Description Reported By Date Resolution Type
www.groundeng.com
Englewood | Commerce City | Loveland | Granby | Gypsum Page 1 of 3
It is the responsibility of the contractor to schedule our office to perform retesting once the necessary corrective action
has been made or provide our office with documentation that resolves the discrepancy.
Resolved Discrepancy follow up commentaryNOT resolved
Structural Steel
(Field) 4
At numerous connections from level 1-5 slag
has not been removed from the weld. This is
to be done before inspection per AWS
D1.1:15 C6 5.29.2.
Lee Royse 10/5/2017
Did a walkthrough with the GC of level’s 1-5,
any welds with slag remaining were de-
slagged and found visually acceptable.
3/15/2018Barry Bowland Per Plan
GROUND has not had the opportunity to
inspect welds with slag remaining on them.
This item will remain open at this time.
1/19/2018Lee Royse
Most slag was found removed. However there
is slag remaining on numerous locations and
this item will remain open.
11/16/2017Lee Royse
Structural Steel
(Field) 5
On level 3 on the outside wall in the center
the beam to Beam connection has a shim
stack installed and the beam to beam
connection has no shear plate installed.
Lee Royse 10/5/2017
This condition has not been changed. Guy
Cuccia stated that he will work with the EOR
for a correction or acceptance to this item.
11/16/2017Lee Royse
This item is acceptable as is per EOR
observation report dated 27 November 2017.
This item is now closed.
1/19/2018Lee Royse Per Structural
EOR Letter
Structural Steel
(Field) 6
On level 3-4 at the center of the outside wall a
column has been covered and cannot be
inspected.
Lee Royse 10/5/2017
The concealed connection has been exposed.
The connections are open and per Guy will
remain open due to the column plates at the
top and bottom are the same condition as
discrepancy number 3. This item is now
closed but the column conditions have been
added to discrepancy number 3.
11/16/2017Lee Royse Per Plan
Structural Steel
(Field) 7
On level four to roof a column to beam
connection has plates added and has no
detail provided for this connection. This is at
south side.
Lee Royse 10/5/2017
The shims that have been added are not per
detail 4/S6. Guy Cuccia stated that he will
work with the EOR for a correction to this
condition. This item will remain open.
11/16/2017Lee Royse
This item is acceptable as is per EOR
observation report dated 27 November 2017.
This item is now closed.
1/19/2018Lee Royse Per Structural
EOR Letter
Cuccia Construction Inc.
PO Box 3613
Vail, CO 81658
Guy Cuccia
303 Gore Creek, Row House # 8
Client:
Date: Project No.
Project Discrepancy Log
17-6553May 03, 2018
Number Description Reported By Date Resolution Type
www.groundeng.com
Englewood | Commerce City | Loveland | Granby | Gypsum Page 2 of 3
It is the responsibility of the contractor to schedule our office to perform retesting once the necessary corrective action
has been made or provide our office with documentation that resolves the discrepancy.
Resolved Discrepancy follow up commentaryNOT resolved
Structural Steel
(Field) 8
On level one the anchored connections of
column base plates to foundation the nuts are
loose and one base plate has anchor bolts
missing.
Lee Royse 10/5/2017
Loose and missing anchor nuts were found
installed and in the snug tight condition and in
general compliance with the project plans.
This item is now closed.
11/16/2017Lee Royse Per Plan
Structural Steel
(Field) 9
On level one at the center of the building the
shear plates to beam do not have a weld
detail for one side of shear plate to beam per
details 16/S5 and 17/S5. Currently the shear
plates are welded on one side to the beam
with approximately a 1/8" to 3/16" fillet weld.
Lee Royse 10/5/2017
These connections were found to be in
general compliance with AWS D1.1:15 C6
table 6.1 and per details 16/S5 and 17/S5.
This item is now closed.
11/16/2017Lee Royse Per Plan
Structural Steel
(Field) 10
On level two on the north side the C Channel
to C Channel connections for the cantilever
deck does not have a weld detail per detail
7/S5.
Lee Royse 10/5/2017
Detail 7/S5 shows a single bevel groove weld
for this connection. GROUND cannot verify
that a bevel has been installed per this detail.
This item will remain open.
11/16/2017Lee Royse
This item is acceptable as is per EOR
observation report dated 27 November 2017.
This item is now closed.
1/19/2018Lee Royse Per Structural
EOR Letter
Structural Steel
(Field) 11
At the fireplace on level 3 the W10x15 over
the stone has no connection detail for this
connection.
Lee Royse 11/16/2017
This item is acceptable as is per EOR
observation report dated 27 November 2017.
This item is now closed.
1/19/2018Lee Royse Per Structural
EOR Letter
Structural Steel
(Field) 12
On level four in the north guest master
bedroom the HSS tube column to roof beam
connection has a shim between the column
and roof beam. This shim is not per project
plans.
Lee Royse 11/16/2017
This item is acceptable as is per EOR
observation report dated 27 November 2017.
This item is now closed.
1/19/2018Lee Royse Per Structural
EOR Letter
Cuccia Construction Inc.
PO Box 3613
Vail, CO 81658
Guy Cuccia
303 Gore Creek, Row House # 8
Client:
Date: Project No.
Project Discrepancy Log
17-6553May 03, 2018
Number Description Reported By Date Resolution Type
www.groundeng.com
Englewood | Commerce City | Loveland | Granby | Gypsum Page 3 of 3
It is the responsibility of the contractor to schedule our office to perform retesting once the necessary corrective action
has been made or provide our office with documentation that resolves the discrepancy.
Resolved Discrepancy follow up commentaryNOT resolved