Loading...
HomeMy WebLinkAboutShirley Field Report - 05-2018.pdf KRM CONSULTANTS, INC. FIELD REPORT P.O.Box 4572 • Vail,Colorado 81658 • 970-949-9391 Project Shirley Remodel Job Number 1602-04 Engineer TDH Arrive 12pm Date 5/17/18 Depart 2pm Status of Present at Site Guy Cuccia Completion General Framing- 100% Structural Elements Observed Sheet 1. Observable Framing observed on each level 2. 3. 4. 5. Deficiencies Observed Photo Ref 1. None Found 2. 3. 4. 5. Action Required Detail 1. None—The general structural framing appeared to conform to the structural drawings. 2. 3. 4. 5. Do deficiencies require follow-up structural observation? Yes 0 No ►'� Other than any deficiencies noted, are the structural elements observed in general conformance with KRM Consultants, Inc. approved plans and specifications? Yes ►i No 0 41" 1, )01-1[G45., SIGNED: \, � HENti.FP1, COPY TO: �► Tim D. Hennum, PES. 0,5/2(//8 ic<,.' ,A1 REVIEWED: 1� S y ®®•