HomeMy WebLinkAboutB18-0139_approved documents_1527720568.pdfCOMcheck Software Version 4.0.7.1
Interior Lighting Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Construction Site:
100 East Meadow Drive
Vail, CO 81657
Owner/Agent:
Mark Current
Current Architects
PO Box 5393
Vail, CO 81657
970.331.6345
michael@currentarchitects.com
Designer/Contractor:
BG Buildingworks
222 Chapel Place, Unit AC-201
Avon, CO 81620
970.949.6108
Project Information
Energy Code:
100 East Meadow Drive
Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations.
Additional Efficiency Package
Allowed Interior Lighting Power
A
Area Category
B
Floor Area
(ft2)
C
Allowed
Watts / ft2
D
Allowed Watts
(B X C)
1-Retail 3650 1.13 4139
4139Total Allowed Watts =
Proposed Interior Lighting Power
E
(C X D)
D
Fixture
Watt.
A
Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast
B
Lamps/
Fixture
C
# of
Fixtures
1-Retail
LED 1: R1/R1E: Other: 1 33 19 627
LED 9: R1: Other: 1 2 19 Exempt
Exemption:Retail Display Window
LED 2: R2: Other: 1 7 33 231
LED 3: R3: Other: 1 13 50 644
LED 4: R4: Other: 1 6 16 99
LED 5: R5/R5E: Other: 1 11 19 209
Incandescent 1: P1: Other: 1 4 320 1280
LED 6: S1: Other: 1 2 9 17
LED 7: T1: Other: 1 436 4 Exempt
Exemption:Furniture-mounted Supplemental Task Lighting
Track lighting 1: T4: Wattage based on 16 feet of track 0 0 480 Exempt
Exemption:Retail Display Window
Track lighting 2: T12: Wattage based on 24 feet of track 0 0 720 720
LED 8: V1: Other: 1 1 96 96
3923Total Proposed Watts =
Project Title:
Data filename:
100 East Meadow Drive
S:\BGProjects\9949.00 100 East Meadow Drive Retail\Engineering\Energy\Calculations\100 EMD
COMcheck.cck
04/13/18Report date:
61 of Page
Interior Lighting Compliance Statement
Compliance Statement: The proposed interior lighting design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed interior lighting systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.0.7.1 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Interior Lighting PASSES: Design 5% better than code
Project Title:
Data filename:
100 East Meadow Drive
S:\BGProjects\9949.00 100 East Meadow Drive Retail\Engineering\Energy\Calculations\100 EMD
COMcheck.cck
04/13/18Report date:
62 of Page
Brent Schumacher - Electrical Engineer 04.13.2018
Inspection Checklist
Requirements: 90.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.0.7.1
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Plan Review Complies? Comments/Assumptions
C103.2
[PR4]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the interior lighting
and electrical systems and equipment
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations, wattage of
bulbs and ballasts, transformers and
control devices.
Complies
Does Not
Not Observable
Not Applicable
C406
[PR9]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the additional energy
efficiency package options.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title:
Data filename:
100 East Meadow Drive
S:\BGProjects\9949.00 100 East Meadow Drive Retail\Engineering\Energy\Calculations\100 EMD
COMcheck.cck
04/13/18Report date:
63 of Page
Section
#
& Req.ID
Rough-In Electrical Inspection Complies? Comments/Assumptions
C405.2.1
[EL15]1
Lighting controls installed to uniformly
reduce the lighting load by at least
50%.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: E-000, E-101, E-102
C405.2.1
[EL18]1
Occupancy sensors installed in
required spaces.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: E-000, E-101, E-102
C405.2.1,
C405.2.2.
3
[EL23]2
Independent lighting controls installed
per approved lighting plans and all
manual controls readily accessible and
visible to occupants.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: E-000, E-101, E-102
C405.2.2.
1
[EL22]2
Automatic controls to shut off all
building lighting installed in all
buildings.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: E-000, E-101, E-102
C405.2.3
[EL16]2
Daylight zones provided with
individual controls that control the
lights independent of general area
lighting.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
Location on plans/spec: E-000, E-101, E-102
C405.2.3,
C405.2.3.
1,
C405.2.3.
2
[EL20]1
Primary sidelighted areas are
equipped with required lighting
controls.
Complies
Does Not
Not Observable
Not Applicable
Exception: Lighting required to have specific application
controls.
Location on plans/spec: E-000, E-101, E-102
C405.2.3,
C405.2.3.
1,
C405.2.3.
3
[EL21]1
Enclosed spaces with daylight area
under skylights and rooftop monitors
are equipped with required lighting
controls.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C405.2.4
[EL4]1
Separate lighting control devices for
specific uses installed per approved
lighting plans.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: E-000, E-101, E-102
C405.2.4
[EL8]1
Additional interior lighting power
allowed for special functions per the
approved lighting plans and is
automatically controlled and
separated from general lighting.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: E-000, E-101, E-102
C405.3
[EL6]1
Exit signs do not exceed 5 watts per
face.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Location on plans/spec: E-200
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title:
Data filename:
100 East Meadow Drive
S:\BGProjects\9949.00 100 East Meadow Drive Retail\Engineering\Energy\Calculations\100 EMD
COMcheck.cck
04/13/18Report date:
64 of Page
Section
#
& Req.ID
Final Inspection Complies? Comments/Assumptions
C303.3,
C408.2.5.
2
[FI17]3
Furnished O&M instructions for
systems and equipment to the
building owner or designated
representative.
Complies
Does Not
Not Observable
Not Applicable
C405.4.1
[FI18]1
Interior installed lamp and fixture
lighting power is consistent with what
is shown on the approved lighting
plans, demonstrating proposed watts
are less than or equal to allowed
watts.
Complies
Does Not
Not Observable
Not Applicable
See the Interior Lighting fixture schedule for values.
C408.2.5.
1
[FI16]3
Furnished as-built drawings for
electric power systems within 90 days
of system acceptance.
Complies
Does Not
Not Observable
Not Applicable
C408.3
[FI33]1
Lighting systems have been tested to
ensure proper calibration, adjustment,
programming, and operation.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title:
Data filename:
100 East Meadow Drive
S:\BGProjects\9949.00 100 East Meadow Drive Retail\Engineering\Energy\Calculations\100 EMD
COMcheck.cck
04/13/18Report date:
65 of Page
Project Title:
Data filename:
100 East Meadow Drive
S:\BGProjects\9949.00 100 East Meadow Drive Retail\Engineering\Energy\Calculations\100 EMD
COMcheck.cck
04/13/18Report date:
66 of Page
COMcheck Software Version 4.0.7.0
Mechanical Compliance Certificate
Project Title:
2015 IECC
Project Type:New Construction
Location:Vail, Colorado
Climate Zone:6b
Construction Site: Owner/Agent: Designer/Contractor:
Project Information
Energy Code:
Reduced interior lighting power. Requirements are implicitly enforced within interior lighting allowance calculations.
Additional Efficiency Package
Mechanical Systems List
Quantity System Type & Description
Heating: 1 each - Other, Gas, Capacity = 40 kBtu/h
No minimum efficiency requirement applies
Fan System: None
1 Lower Level Baseboard (Multiple-Zone):
VRF, Air Cooled Heat Pump
Heating Mode: Capacity = 36 kBtu/h,
No minimum efficiency requirement applies
Cooling Mode: Capacity = 36 kBtu/h,
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Fails: Fan system has no fans
Fans:
2 Multi-Split Heat Pumps (Multiple-Zone):
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans,
specifications, and other calculations submitted with this permit application. The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.0.7.0 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Name - Title Signature Date
Project Title:
Data filename: S:\BGProjects\9949.00 100 East Meadow Drive Retail\Engineering\Energy\Calculations\100 EMD
COMcheck.cck
04/13/18Report date:
101 of Page
Steven Shea 04.13.2018
Inspection Checklist
Requirements: 75.0% were addressed directly in the COMcheck software
COMcheck Software Version 4.0.7.0
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Energy Code: 2015 IECC
Section
#
& Req.ID
Plan Review Complies? Comments/Assumptions
C103.2
[PR2]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the mechanical
systems and equipment and
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C406
[PR9]1
Plans, specifications, and/or
calculations provide all information
with which compliance can be
determined for the additional energy
efficiency package options.
Complies
Does Not
Not Observable
Not Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title:
Data filename: S:\BGProjects\9949.00 100 East Meadow Drive Retail\Engineering\Energy\Calculations\100 EMD
COMcheck.cck
04/13/18Report date:
102 of Page
Section
#
& Req.ID
Footing / Foundation Inspection Complies? Comments/Assumptions
C403.2.4.
5,
C403.2.4.
6
[FO9]3
Snow/ice melting system sensors for
future connection to controls. Freeze
protection systems have automatic
controls installed.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title:
Data filename: S:\BGProjects\9949.00 100 East Meadow Drive Retail\Engineering\Energy\Calculations\100 EMD
COMcheck.cck
04/13/18Report date:
103 of Page
Section
#
& Req.ID
Plumbing Rough-In Inspection Complies? Comments/Assumptions
C404.5,
C404.5.1,
C404.5.2
[PL6]3
Heated water supply piping conforms
to pipe length and volume
requirements. Refer to section details.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.5,
C404.5.1,
C404.5.2
[PL6]3
Heated water supply piping conforms
to pipe length and volume
requirements. Refer to section details.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.6.3
[PL7]3
Pumps that circulate water between a
heater and storage tank have controls
that limit operation from startup to
<= 5 minutes after end of heating
cycle.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.6.3
[PL7]3
Pumps that circulate water between a
heater and storage tank have controls
that limit operation from startup to
<= 5 minutes after end of heating
cycle.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.7
[PL8]3
Water distribution system that pumps
water from a heated-water supply
pipe back to the heated-water source
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C404.7
[PL8]3
Water distribution system that pumps
water from a heated-water supply
pipe back to the heated-water source
through a cold-water supply pipe is a
demand recirculation water system.
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
entering the cold-water piping to
104°F.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title:
Data filename: S:\BGProjects\9949.00 100 East Meadow Drive Retail\Engineering\Energy\Calculations\100 EMD
COMcheck.cck
04/13/18Report date:
104 of Page
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies? Comments/Assumptions
C402.2.6
[ME41]3
Thermally ineffective panel surfaces of
sensible heating panels have
insulation >= R-3.5.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.12
.1
[ME65]3
HVAC fan systems at design
conditions do not exceed allowable
fan system motor nameplate hp or fan
system bhp.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
See the Mechanical Systems list for values.
C403.2.12
.1
[ME65]3
HVAC fan systems at design
conditions do not exceed allowable
fan system motor nameplate hp or fan
system bhp.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
See the Mechanical Systems list for values.
C403.2.12
.3
[ME117]2
Fans have efficiency grade (FEG) >=
67. The total efficiency of the fan at
the design point of operation <= 15%
of maximum total efficiency of the
fan.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.12
.3
[ME117]2
Fans have efficiency grade (FEG) >=
67. The total efficiency of the fan at
the design point of operation <= 15%
of maximum total efficiency of the
fan.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.13
[ME71]2
Unenclosed spaces that are heated
use only radiant heat.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.3
[ME55]2
HVAC equipment efficiency verified. Complies
Does Not
Not Observable
Not Applicable
See the Mechanical Systems list for values.
C403.2.4.
4
[ME112]3
Zone isolation devices and controls
installed where applicable.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
4
[ME112]3
Zone isolation devices and controls
installed where applicable.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.6.
1
[ME59]1
Demand control ventilation provided
for spaces >500 ft2 and >25
people/1000 ft2 occupant density and
served by systems with air side
economizer, auto modulating outside
air damper control, or design airflow
>3,000 cfm.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.6.
2
[ME115]3
Enclosed parking garage ventilation
has automatic contaminant detection
and capacity to stage or modulate
fans to 50% or less of design capacity.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.7
[ME57]1
Exhaust air energy recovery on
systems meeting Table C403.2.7(1)
and C403.2.7(2).
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title:
Data filename: S:\BGProjects\9949.00 100 East Meadow Drive Retail\Engineering\Energy\Calculations\100 EMD
COMcheck.cck
04/13/18Report date:
105 of Page
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies? Comments/Assumptions
C403.2.8
[ME116]3
Kitchen exhaust systems comply with
replacement air and conditioned
supply air limitations, and satisfy hood
rating requirements and maximum
exhaust rate criteria.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.9
[ME60]2
HVAC ducts and plenums insulated.
Where ducts or plenums are installed
in or under a slab, verification may
need to occur during Foundation
Inspection.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.9
[ME10]2
Ducts and plenums sealed based on
static pressure and location.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.9.
1.3
[ME11]3
Ductwork operating >3 in. water
column requires air leakage testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.2.9.
1.3
[ME11]3
Ductwork operating >3 in. water
column requires air leakage testing.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.4.1.
1
[ME75]2
Hydronic and multizone HVAC system
controls areVAV fans driven by
mechanical or electrical variable
speed drive per Table C403.4.1.1.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.4.1.
1
[ME75]2
Hydronic and multizone HVAC system
controls areVAV fans driven by
mechanical or electrical variable
speed drive per Table C403.4.1.1.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.4.1.
2
[ME67]2
VAV fans have static pressure sensors
located so controller setpoint <=1.2
w.c..
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.4.1.
2
[ME67]2
VAV fans have static pressure sensors
located so controller setpoint <=1.2
w.c..
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.4.1.
3
[ME24]2
Reset static pressure setpoint for DDC
controlled VAV boxes reporting to
central controller based on the zones
requiring the most pressure.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.4.1.
3
[ME24]2
Reset static pressure setpoint for DDC
controlled VAV boxes reporting to
central controller based on the zones
requiring the most pressure.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
C403.4.2.
3.2.2
[ME122]3
Open- or closed circuit cooling towers
have a separate heat exchanger to
isolate the cooling tower from the
heat pump loop, and heat loss is
controlled by shutting down the
circulation pump on the cooling tower
loop.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title:
Data filename: S:\BGProjects\9949.00 100 East Meadow Drive Retail\Engineering\Energy\Calculations\100 EMD
COMcheck.cck
04/13/18Report date:
106 of Page
Section
#
& Req.ID
Mechanical Rough-In Inspection Complies? Comments/Assumptions
C403.4.4.
6
[ME110]3
Multiple zone VAV systems with DDC
of individual zone boxes have static
pressure setpoint reset controls.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
See the Mechanical Systems list for values.
C403.4.4.
6
[ME110]3
Multiple zone VAV systems with DDC
of individual zone boxes have static
pressure setpoint reset controls.
Complies
Does Not
Not Observable
Not Applicable
Exception: Requirement does not apply.
See the Mechanical Systems list for values.
C408.2.2.
1
[ME53]3
Air outlets and zone terminal devices
have means for air balancing.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title:
Data filename: S:\BGProjects\9949.00 100 East Meadow Drive Retail\Engineering\Energy\Calculations\100 EMD
COMcheck.cck
04/13/18Report date:
107 of Page
Section
#
& Req.ID
Final Inspection Complies? Comments/Assumptions
C303.3,
C408.2.5.
3
[FI8]3
Furnished O&M manuals for HVAC
systems within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.2
[FI27]3
HVAC systems and equipment
capacity does not exceed calculated
loads.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
1
[FI47]3
Heating and cooling to each zone is
controlled by a thermostat control.
Minimum one humidity control device
per installed
humidification/dehumidification
system.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
1
[FI47]3
Heating and cooling to each zone is
controlled by a thermostat control.
Minimum one humidity control device
per installed
humidification/dehumidification
system.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
1.1
[FI42]3
Heat pump controls prevent
supplemental electric resistance heat
from coming on when not needed.
Complies
Does Not
Not Observable
Not Applicable
C403.2.4.
1.2
[FI38]3
Thermostatic controls have a 5 °F
deadband.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
1.3
[FI20]3
Temperature controls have setpoint
overlap restrictions.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
2
[FI39]3
Each zone equipped with setback
controls using automatic time clock or
programmable control system.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C403.2.4.
2.1,
C403.2.4.
2.2
[FI40]3
Automatic Controls: Setback to 55°F
(heat) and 85°F (cool); 7-day clock, 2-
hour occupant override, 10-hour
backup
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.1
[FI28]1
Commissioning plan developed by
registered design professional or
approved agency.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.3.
1
[FI31]1
HVAC equipment has been tested to
ensure proper operation.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.3.
2
[FI10]1
HVAC control systems have been
tested to ensure proper operation,
calibration and adjustment of controls.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title:
Data filename: S:\BGProjects\9949.00 100 East Meadow Drive Retail\Engineering\Energy\Calculations\100 EMD
COMcheck.cck
04/13/18Report date:
108 of Page
Section
#
& Req.ID
Final Inspection Complies? Comments/Assumptions
C408.2.4
[FI29]1
Preliminary commissioning report
completed and certified by registered
design professional or approved
agency.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.5.
1
[FI7]3
Furnished HVAC as-built drawings
submitted within 90 days of system
acceptance.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.5.
3
[FI43]1
An air and/or hydronic system
balancing report is provided for HVAC
systems.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
C408.2.5.
4
[FI30]1
Final commissioning report due to
building owner within 90 days of
receipt of certificate of occupancy.
Complies
Does Not
Not Observable
Not Applicable
Requirement will be met.
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Project Title:
Data filename: S:\BGProjects\9949.00 100 East Meadow Drive Retail\Engineering\Energy\Calculations\100 EMD
COMcheck.cck
04/13/18Report date:
109 of Page
Project Title:
Data filename: S:\BGProjects\9949.00 100 East Meadow Drive Retail\Engineering\Energy\Calculations\100 EMD
COMcheck.cck
04/13/18Report date:
1010 of Page
75 South Frontage Road
West,
Vail, CO 81657
Office: 970.479.2139
Inspection Line: 970.479.2149
Construction
B18-0139
Issued: 05/30/2018
TOWN OF VAIL
Property Information
Address: 100 E MEADOW DR 7A (210108256036 7A) ( 210108256036 )
Unit #: 7A
Parcel Number: 210108256036
Legal Description:Subdivision: VAIL VILLAGE PLAZA CONDOS Unit: 7A BK-0525 PG-0640 DEC 03-22-90 BK-0684 PG-
0190 WD 12-15-95
Contacts
Contact Type: Applicant
Full Name: Michael Current
Address: PO Box 5293 X Vail, CO 81657 Phone: 9703316345
Contact Type: Property Owner
Full Name: AJW PROPERTIES II LLC
Address: 2910 BOOTH CREEK DR 22 VAIL, CO 81657-4604 Phone: None
Contact Type: Property Owner
Full Name: AJW PROPERTIES II LLC
Address: 2910 BOOTH CREEK DR 21 VAIL, CO 81657-4604 Phone: None
Contact Type: Property Owner
Full Name: AJW PROPERTIES II LLC
Address: 2910 BOOTH CREEK DR 8 VAIL, CO 81657-4604 Phone: None
Contact Type: Property Owner
Full Name: AJW PROPERTIES II LLC
Address: Phone: None
Contractor
Contractor Type: General
Company: Rocky Mountain Construction Group
State License #: Phone: 970-476-4458
Project Information
Project Name: AJW Properties II LLC 2018
Project Description:
Renovation of Units 7A, 8, 21, and 22. Interior remodel including architectural finishes and new electrical
and mechanical systems. Exterior renovation including TOV DRB and VVIPCA HOA approved changes to
one new roof, exterior finishes, and window and door modifications.
Fees Paid
Account #: 001-0000.31111.00 - Building Permit Fee Fee Amount:$2,931.35
Account #: 001-0000.31123.00 - Building Plan Review Fee Fee Amount:$1,905.38
Account #: 110-0000.31060.00 - Construction Use Tax Fee Fee Amount:$8,710.00
Account #: 001-0000.31111.00 - Mechanical Permit Fee Fee Amount:$1,500.00
Account #: 001-0000.31123.00 - Mechanical Plan Review Fee Fee Amount:$375.00
Account #: 001-0000.31111.00 - Plumbing Permit Fee Fee Amount:$315.00
Account #: 001-0000.31123.00 - Plumbing Plan Review Fee Fee Amount:$78.75
Account #: 001-0000.31128.00 - Will Call Fee (Building Scope)Fee Amount:$5.00
Account #: 001-0000.31128.00 - Will Call Fee (Mechanical Scope)Fee Amount:$5.00
Account #: 001-0000.31128.00 - Will Call Fee (Plumbing Scope)Fee Amount:$5.00
Total Paid:$15,830.48
Conditions
CONDITIONS UNDER WHICH PERMITS BECOME VOID:
If construction is not begun within 6 months from the date permit was issued.
If more than 5 months elapses between inspections.
If incorrect information is given on the application at the time the permit was issued.
Christopher Jarecki - Town of Vail Building Official
NOTICE: By issuance of this Permit the applicant agrees to comply with all Titles of the Town of Vail Code and all applicable State and Federal
law. Failure to do so will void this Permit and the applicant shall forfeit all applicable fees.