Loading...
HomeMy WebLinkAboutB18-0207_Approved Documents_1527193455.pdf75 South Frontage Road West, Vail, CO 81657 Office: 970.479.2139 Inspection Line: 970.479.2149 Expedited B18-0207 Issued: 05/24/2018 TOWN OF VAIL Property Information Address: 1730 BUFFEHR CREEK RD (210312210009) ( 210312210009 ) Unit #: Parcel Number: 210312210009 Legal Description:Subdivision: LIA ZNEIMER SUBDIVISION Lot: 7 BK-0699 PG-0588 BSD 06-27-96 BK-0703 PG-0989 BSD 06-27-96 R905518 SWD 01-27-05 Contacts Contact Type: Applicant Full Name: Robert Valenzuela Address: 332 Grand Ave Eagle, CO 81631 Phone: 9703284044 Contact Type: Property Owner Full Name: FAGAN, BRITTAINY N. Address: Phone: None Contractor Contractor Type: General Company: A.g. Roofing Company Inc State License #: Phone: 970-328-4044 Project Information Project Name: Fagan Residence Re-roof 2018 Project Description: Residential Re-roof of 100% of roof. Remove cedar shake and replace with DaVinci color Vineyard Fees Paid Account #: 001-0000.31111.00 - Building Permit Fee Fee Amount:$979.75 Account #: 001-0000.31123.00 - Building Plan Review Fee Fee Amount:$636.84 Account #: 110-0000.31060.00 - Construction Use Tax Fee Fee Amount:$1,754.80 Account #: 001-0000.31128.00 - Will Call Fee (Building Scope)Fee Amount:$5.00 Total Paid:$3,376.39 Conditions CONDITIONS UNDER WHICH PERMITS BECOME VOID: If construction is not begun within 6 months from the date permit was issued. If more than 5 months elapses between inspections. If incorrect information is given on the application at the time the permit was issued. Christopher Jarecki - Town of Vail Building Official NOTICE: By issuance of this Permit the applicant agrees to comply with all Titles of the Town of Vail Code and all applicable State and Federal law. Failure to do so will void this Permit and the applicant shall forfeit all applicable fees. Page 1 of 3Multi-Width Composite Slate Roof Tile | DaVinci Roofscapes 05/22/2018https://www.davinciroofscapes.com/products/slate/multi-width-davinci/ Page 2 of 3Multi-Width Composite Slate Roof Tile | DaVinci Roofscapes 05/22/2018https://www.davinciroofscapes.com/products/slate/multi-width-davinci/ Page 3 of 3Multi-Width Composite Slate Roof Tile | DaVinci Roofscapes 05/22/2018https://www.davinciroofscapes.com/products/slate/multi-width-davinci/ PERMIT FEE RECEIPT Case # B18-0207 Date Printed: 05/16/2018 TOWN OF VAIL - FEES RECEIPT Permit Summary Case Number: B18-0207 Status: Created Permit Number: Date Started: 05/16/2018 Permit Type: Expedited Subcases Re-roof Lot Number: 7 Property: 1730 BUFFEHR CREEK RD (210312210009) (210312210009) Contacts Contact Type: Applicant Company Name: AG Roofing Company Full Name: Robert Valenzuela Address: 332 Grand Ave Eagle, CO 81631 Email: info@agroofingcompany.com Contact Type: Property Owner Full Name: FAGAN, BRITTAINY N. Address: Permit Fees Fee Information Account Amount Permit Fee 001-0000.31111.00 $979.75 Plan Review 001-0000.31123.00 $636.84 Construction Tax 110-0000.31060.00 $1,754.80 Will Call Fee 001-0000.31128.00 $5.00 Payment Information Date Paid Payment Type Amount Will Call Fee 05/16/2018 Check $5.00 Paid By: AG Roofing Company Inc. - Notes: ck# 1794 Construction Tax 05/16/2018 Check $1,754.80 Paid By: AG Roofing Company Inc. - Notes: ck# 1794 Permit Fee 05/16/2018 Check $979.75 Paid By: AG Roofing Company Inc. - Notes: ck# 1794 Plan Review 05/16/2018 Check $636.84 Paid By: AG Roofing Company Inc. - Notes: ck# 1794 FEE TOTAL $3,376.39 AMOUNT PAID $3,376.39 BALANCE DUE $0.00 05/16/2018 - 2:47:48 PM - Generated by: cgodfrey75 South Frontage Road West, Vail, Colorado 81657 1 / 1 A.G. Roofing Company Inc. PO Box 5438 Eagle CO 81631 Office 970-328-4044 Fax 970-328-4221 www.agroofingcompany.com info@agroofingcompany.com DATE: 05/08/2018 JOB: RR17-073-R2 CONTACT NAME: Brittainy fagan CELL/OFFICE: (214) 930-5857 EMAIL: Faganbrittainy@gmail.com JOB SITE ADDRESS: 1730 Buffher Creek, Vail Colorado 81657 Note: 1- If we need to cut the stucco, siding or stone for dry-in and flashing installation that work will be done on a T&M Basis, all work to repair these sections will be done by others than AG Roofing. If any fascia and soffit need’s repairs, it will be done on a time and material basis. 2- Any gutters that need to be removed by A.G. Roofing Company will be removed before the start of the project and re installed at the end. This will be done on a T&M basis. 3- Building permit fees will be paid by the owner. 4- Payments: The Contract will be paid as follows: 40% Initial Deposit at Time of Signed Contract; 30% When the Material is Delivered to the Job Site. The Remaining 30% plus extras such as Building Permit, Snow Guards, Stucco Removal, Plywood if any, Roll Vent/Venting if Needed will be due at the time of completion. 5- AG Roofing will charge an additional $60/Per 4’ x 8’ Sheet of Plywood that turns up damaged/rotten. (Includes material, disposal of debris and installation of new plywood) 6- AG Roofing Company recommends installing snow clips to all roof areas to protect entrances, walk ways, and gutter areas. Any specialty equipment (Conveyor or Crane) needed to move materials/Debris off or on to the roof will be added as an extra and charged accordingly. A.G. Roofing Company Inc. PO Box 5438 Eagle CO 81631 Office 970-328-4044 Fax 970-328-4221 www.agroofingcompany.com info@agroofingcompany.com JOB: RR17-073-R2 The Following Proposal Is For The Residence At 1730 Buffher Creek. Vail, Colorado 81657 SCOPE OF WORK FOR NEW ROOF DaVinci Classic Single-Width Vineyard Slate 1. A.G. Roofing Company to inspect all new sloped roof areas. 2. A.G. Roofing Company to keep reinforced plastic on jobsite at all times to cover roof when necessary. 3. A.G Roofing Company to manufacture and install 16Oz. COPPER FLASHING to all eaves, rakes, valley, etc. Color TBD. 4. A.G. Roofing Company to provide and install ICE & WATER SHIELD to 100% of designated sloped roof area. 5. A.G. Roofing Company to provide and install ECOCHIEF SOLAR HIDE to 100% of designated sloped roof areas for a class-A fire rated roof. 6. A.G. Roofing company to provide and install DAVINCI CLASSIC SINGLE-WIDTH SLATE to 100% of designated sloped roof areas. Vineyard Slate Color CONTRACT PRICE FOR ALL ABOVE WORK ………………………… ………$79,000.00_____ Round Eaves 1. A.G. Roofing to perform all work to on the round eaves on a time and material basis. 2. A.G. Roofing will manufacture and install custom round 16oz Copper rake flashings to 100% of designated areas. ROUND EAVES THROUGHOUT THE RESIDENCE TO BE COMPLETED ON A TIME & MATERIAL BASIS SCOPE OF WORK FOR NEW GUTTERS 16oz ½ Round Copper Gutters 1. A.G. Roofing Company to manufacture and provide approximately 105 LF OF 16OZ HALF ROUND COPPER GUTTER and approximately 162 LF OF 3” 16OZ COPPER DOWN SPOUT to designated areas throughout the residence……………………………………………… ………………………………….…………………… ..$9,000.00_____ SCOPE OF WORK FOR HEAT TAPE 1. A.G. Roofing Company to provide and install approximately 360’ Linear feet of 240V Raychem Heat Tape to all gutters and down spouts throughout the home……………………………………… …$4,240.00_____ 2. A.G Roofing Company to provide and install approximately 440’ Linear Feet of 240V Raychem Heat Tape to all the valleys throughout the roof and in zig zag form to designated areas…..$5,500.00_____ A.G. Roofing Company Inc. PO Box 5438 Eagle CO 81631 Office 970-328-4044 Fax 970-328-4221 www.agroofingcompany.com info@agroofingcompany.com JOB: RR17-073-R2 CONDITIONS: 1) MATERIALS: Please be advised that materials for this proposal have been bid at current market prices and cannot be guaranteed past 30 days. A.G. Roofing reserves the right to increase the proposal amount to meet the increase in material cost. Any extra material not indicated in proposal will be charged as an extra. 2) REROOF: A.G. Roofing Company will provide and install materials indicated by homeowner, any change orders will be charged accordingly. If A.G. Roofing has to take off gutters or heat tape to prevent damages, it will be charge on T&M (time and material basis at $60.00/hr.). If for any reason the roofing supply company cannot deliver the material (drive way blocked, truck too heavy for the drive way, etc…) A.G. Roofing Company will rent the equipment necessary to move the material on the roof at the owners’ expense. 3) PAYMENTS: Payments are due upon receipt of invoice. Any invoices over 30 days old are subject to interest charge of 3% per month. PROPERTY SUBJECT TO HAVE A LIEN FILED IF NOT PAID WITH IN 120 DAYS FROM LAST DAY WORKED AT JOB SITE. 4) WINTER CONDITIONS CLAUSE: Any work performed from NOVEMBER 1, THRU APRIL 30, will be subject to a winterization charge (not to exceed 10% of contract price). Contract does not include ice and snow removal, or application of plastic on roof deck, and will be billed on a T & M basis. Priming of ice & water shield will be required and will be charged @ $.20 PER SQ FT. 5) INSURANCE: A.G. Roofing Company is fully insured with liability insurance in the amount of $2,000,000 and workman's compensation. Certificates of insurance will be forwarded to client upon acceptance of proposal. 6) ATTORNEY'S FEES: Should either party be required to retain an attorney or attorneys to enforce the provisions of this agreement, whether or not litigation is actually required, the non-breaching party shall be entitled to recover from the party breaching this agreement those reasonable attorney's fees incurred as a result of such breach. If judgment is against A.G. Roofing Company, the sum cannot exceed the contract price. 7) WARRANTY: A.G. Roofing Company will warranty all labor against leaks for a period of 2 YEARS. Warranty is void if snow exceeds 30" and is not removed. Snow removal performed by anyone other than A.G. Roofing Company or other local properly insured contractor will void warranty. Proof of general liability insurance must be forwarded to A.G. Roofing Company PRIOR to commencement of snow removal. Broken tile is not included in scope of warranty. Any work or alteration on roof (snow fence, snow clips etc...) done by others will void Warranty as well. 8) NOTICE TO PROCEED: Once work is started this proposal becomes the primary contract is not over ruled by any other contract, whether it is signed or not. Any delays caused because of non-preparation on the part of the client or his/her Hired tradesman or subcontractors will validate a charge by A.G. Roofing Company to the client for any lost time and/or materials. ACCEPTANCE OF PROPOSAL _05/08/2018 ____________________________05/08/2018 Adalberto Chanez, A.G. Roofing/Estimator AUTHORIZED REPRESENTATIVE