Loading...
HomeMy WebLinkAboutaction_form_drb_05-03-2018_5aeb30e7e579b-0.pdfACTION FORM Design Review Board (DRB) Department of Community Development 75 South Frontage Road West Vail, CO 81657 Tel: 970-479-2139 www.vailgov.com Project Name:Battle Mountain/Lazier Parking Garage 2018 Application Number:DRB18-0144 Application Type:Exterior Alteration Date Applied:04/24/2018 Project Description:Demolition of existing top deck of parking structure and associated site modifications/restoration. CONTACTS Contact Type:Applicant Full Name:Braun Associates, Inc (Thomas Braun) Address:225 Main Street, Suite G-2 225 Main Street, Suite G-2 Suite G-2 Edwards, CO 81632 Phone:9709267575 Contact Type:Property Owner Full Name:BATTLE MOUNTAIN LLC LAUNCH DEVELOPMENT INC Address:Phone:None Contact Type:Property Owner Full Name:LAZIER LIONSHEAD LLC Address:Phone:None Project Address:500 E LIONSHEAD CIR (210106308002) (210106308002)|534 E LIONSHEAD CIR (210106308013) (210106308013) Job Site Location: Legal Description:Subdivision:VAIL LIONSHEAD FILING 1 Lot:2 & 3 Block:1 Parcel Number:210106308013 BOARDS/STAFF ACTION Motion By:Cope Action:Approved Second By:Campbell Vote:3-0-1 (Pierce recused)Date:05/02/2018 Conditions: - Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. - The fire lane located to the south of the garage shall be maintained and accessible during the demolition period. - Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3 Appeals. - No changes to these plans maybe made without the written consent of Town of Vail staff and/or the appropriate review committee(s). - All new parking areas shall meet TOV standards (9’ by 19’). - Prior to issuance of a Demolition Permit, the Applicant shall provide to the Town of Vail a drainage letter which accurately demonstrates where drainage will occur. - After removal of the driveway access to the upper deck, the applicant shall connect the paver walk along East Lionshead Circle. Alternative materials may be proposed for review and approval by the TOV. This shall be completed prior to requesting any final inspections. - The demo permit shall, at a minimum, include a signed/stamped engineered shoring plan. - All trees with the exception of the two conifers along East Lionshead Circle shall remain. If other trees are damaged or removed through construction, the applicant shall submit a revised landscape plan for review and approval by the TOV, prior to requesting any final inspections. - The trash room with the cooking oil shall be cleaned and both trash rooms shall operate as bear-proof within 30 days of the approval of this DRB application. Planner: Jonathan Spence