HomeMy WebLinkAboutaction_form_drb_05-03-2018_5aeb30e7e579b-0.pdfACTION FORM
Design Review Board (DRB)
Department of Community Development
75 South Frontage Road West
Vail, CO 81657
Tel: 970-479-2139
www.vailgov.com
Project Name:Battle Mountain/Lazier Parking
Garage 2018 Application Number:DRB18-0144
Application Type:Exterior Alteration Date Applied:04/24/2018
Project Description:Demolition of existing top deck of parking structure and associated site
modifications/restoration.
CONTACTS
Contact Type:Applicant
Full Name:Braun Associates, Inc (Thomas Braun)
Address:225 Main Street, Suite G-2 225 Main Street, Suite G-2
Suite G-2 Edwards, CO 81632 Phone:9709267575
Contact Type:Property Owner
Full Name:BATTLE MOUNTAIN LLC LAUNCH DEVELOPMENT INC
Address:Phone:None
Contact Type:Property Owner
Full Name:LAZIER LIONSHEAD LLC
Address:Phone:None
Project Address:500 E LIONSHEAD CIR (210106308002) (210106308002)|534 E LIONSHEAD
CIR (210106308013) (210106308013)
Job Site Location:
Legal Description:Subdivision:VAIL LIONSHEAD FILING 1 Lot:2 & 3 Block:1
Parcel Number:210106308013
BOARDS/STAFF ACTION
Motion By:Cope Action:Approved
Second By:Campbell
Vote:3-0-1 (Pierce recused)Date:05/02/2018
Conditions:
- Approval of this project shall lapse and become void one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
- The fire lane located to the south of the garage shall be maintained and accessible during the demolition
period.
- Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant
to the Vail Town Code, Chapter 12-3-3 Appeals.
- No changes to these plans maybe made without the written consent of Town of Vail staff and/or the
appropriate review committee(s).
- All new parking areas shall meet TOV standards (9’ by 19’).
- Prior to issuance of a Demolition Permit, the Applicant shall provide to the Town of Vail a drainage letter
which accurately demonstrates where drainage will occur.
- After removal of the driveway access to the upper deck, the applicant shall connect the paver walk along
East Lionshead Circle. Alternative materials may be proposed for review and approval by the TOV. This shall
be completed prior to requesting any final inspections.
- The demo permit shall, at a minimum, include a signed/stamped engineered shoring plan.
- All trees with the exception of the two conifers along East Lionshead Circle shall remain. If other trees are
damaged or removed through construction, the applicant shall submit a revised landscape plan for review
and approval by the TOV, prior to requesting any final inspections.
- The trash room with the cooking oil shall be cleaned and both trash rooms shall operate as bear-proof
within 30 days of the approval of this DRB application.
Planner: Jonathan Spence