Loading...
HomeMy WebLinkAboutcut sheets_56.pdfProject Information Project#: ® 2017 Name: Location: Vail International Condominiums Snow Melt Vail, CO Design Conditions and Summary Method Fluid Type: Total Flowrate: Max. Head Loss: Design Temp. Drop: Total Area: Radiant Panel Details Specify Loads Manually 50% Propylene Glycol 142.09 USGPM 26.9 ft water 25.0 °F 10,488 f12 Panel Type #1 • Snow Melt -Pavers Covering Material: Covering Thickness: Covering Rv: Embedded Layer Thickness: Tube Depth (Embedded Layer): Embedded Layer R per Inch: Insulation Rv: Spacing: Floorplans: New Floorplan Pave rs 2.0 in 0.4 hr·ft2· °F/btu 4.0 in 0.9 in 0.44 °F•fl"hr/Btu•in 10.0 hr·f12·°F/btu 9in 10,469 ft2 Note: Tube depth is measured from top of embedded layer to the centerline of the tubing. See end of report for important Notes and Disclaimers. Notes: Total Snow Melt Load: 1,573,214 Btu/hr Snow Melt Panel Schedule May 31, 2018 Created Using LoopCAD 2017 (5/31/2018) Version:17.0.0680 R Page 1 of 2 Nanfe:Vail ln'/'ernational Condominiums Snow Melt Project#: Disclaimers Snow Melt Panel Schedule May 31, 2018 The calculated values shown in this report are based on the data input by the user of the software. Inaccurate or erroneous data input will result in inaccurate or erroneous results. You are strongly advised to review all input data carefully, and to have the calculated results reviewed by an experienced heating professional to ensure reasonableness and suitability for your application. IN NO EVENT WILL AVENIR SOFTWARE INC. ("AVENIR") OR ITS AFFILIATES BE LIABLE UNDER ANY CONTRACT, NEGLIGENCE, STRICT LIABILITY OR OTHER LEGAL OR EQUITABLE THEORY FOR ANY CONSEQUENTIAL, INCIDENTAL, INDIRECT OR SPECIAL OR PUNITIVE DAMAGES WHATSOEVER (INCLUDING, BUT NOT LIMITED TO, DAMAGES FOR LOSS OF BUSINESS PROFITS, BUSINESS INTERRUPTION, LOSS OF BUSINESS INFORMATION OR DATA AND THE LIKE), EVEN IF SUCH PARTY HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. AVENIR'S CUMULATIVE LIABILITY FROM ANY CAUSE RELATED TO OR ARISING FROM THE USE THIS REPORT, AND REGARDLESS OF THE FORM OF THE ACTION, SHALL BE LIMITED TO NO GREATER THAN THE AMOUNT OF FEES PAID TO AVENIR UNDER THE SOFTWARE LICENSE AGREEMENT. Note: Tube depth is measured from top of embedded layer to the centerline of the tubing. See end of report for important Notes and Disclaimers. Created Using LoopCAD 2017 (5/31/2018) Version:17.0.0680 R Page 2 of 2 ® 2017 Project Information Project#: Name: Location: Vail International Condominiums Snow Melt Vail, CO Design Conditions and Summary Method Specify Loads Manually Total Circuit Lengths: Barrier PEX 5/8" Fluid Type: 50% Propylene Glycol Total Flowrate: Max. Head Loss: Design Temp. Drop: Total Area: Snow Melt System Design East Snow Melt Area C Total Area: Heated Area: Construction: Slab Depth: East Snow Melt Area D Total Area: Heated Area: Construction: Slab Depth: 2,576 ft2 2,576 ft2 Snow Melt -Pavers 4.0in 2,659 ft• 2,659 ft• Snow Melt -Pavers 4.0in 142.09 USGPM Total Circuits: 26.9 ft water Total Manifolds: 25.0 °F 10,488 ft2 Total Tubing Volume: Glycol Volume (50%): Tubing: Total Circuits: Avg. Circuit Length: Total Length in panel: Avg. Tube Spacing: Min Supply Temp: Tubing: Total Circuits: Avg. Circuit Length: Total Length in panel: Avg. Tube Spacing: Min Supply Temp: See end of report for important Notes and Disclaimers. Notes: 15,023 ft 63 4 201.95 USG 100.97 USG Barrier PEX 5/8" 16 232 ft 3,578 ft 9 in 132 °F Barrier PEX 5/8" 16 233 ft 3,570 ft 9 in 132 °F Snow Melt System Design Report Total Snow Melt Load: Design Load: Downward Loss: Total Heat Load: (User Specified Load) Design Load: Downward Loss: Total Heat Load: (User Specified Load) May 31, 2018 1,573,214 Btu/hr 321,948 Btu/hr 64,390 Btu/hr 386,337 Btu/hr 332,321 Btu/hr 66,464 Btu/hr 398,785 Btu/hr Created Using LoopCAD 2017 (5/31/2016) Version: 17 .0.0660 R Page 1of7 Name:\<ail International Condominiums Snow Melt • Project#: West Snow Melt Area A Total Area: Heated Area: Construction: Slab Depth: West Snow Melt Area B Total Area: Heated Area: Construction: Slab Depth: 2,670 ft2 2,670 ft2 Snow Melt -Pavers 4.0 in 2,584 ft2 2,584 ft2 Snow Melt -Pavers 4.0in See end of report for important Notes and Disclaimers. Tubing: Total Circuits: Avg. Circuit Length: Total Length in panel: Avg. Tube Spacing: Min Supply Temp: Tubing: Total Circuits: Avg. Circuit Length: Total Length in panel: Avg. Tube Spacing: Min Supply Temp: Barrier PEX 5/8" 16 244 ft 3,651 ft 9 in 132 °F Barrier PEX 5/8" 15 245 ft 3,523 ft 9 in 132 °F Snow Melt System Design Report May 31, 2018 Design Load: Downward Loss: Total Heat Load: (User Specified Load) Design Load: Downward Loss: Total Heat Load: (User Specified Load) 333, 719 Btu/hr 66,744 Btu/hr 400,462 Btu/hr 323,024 Btu/hr 64,605 Btu/hr 387,629 Btu/hr Created Using LoopCAD 2017 (5/31/2018) Version:17.0.0680 R Page 2 of 7 Name:Vail International Condominiums Snow Melt Project#: Manifold Summary Manifold Name Circuits Manifold 1 16 Manifold 2 15 Manifold 3 16 Manifold 4 16 Total 63 Flowrate 36.17 35.01 34.89 36.02 142.09 Supplied Max Temp. Temp. Drop 132 25 132 25 132 25 132 25 --(1) S/R Length =one way, (2) Total Head loss includes manifold, circuits and supply/return piping if specified. Tubing Circuit Details Manifold 1 Circuit Areas Served A-48 West Snow Melt Area A A-49 West Snow Melt Area A A-50 West Snow Melt Area A A-51 West Snow Melt Area A A-52 West Snow Melt Area A A-53 West Snow Melt Area A A-54 West Snow Melt Area A A-56 West Snow Melt Area A A-57 West Snow Melt Area A A-58 West Snow Melt Area A A-59 West Snow Melt Area A A-60 West Snow Melt Area A A-61 West Snow Melt Area A A-62 West Snow Melt Area A A-63 West Snow Melt Area A A-64 West Snow Melt Area A Total -(1) Head loss for circuit tubing only Total Length 243 243 244 243 244 243 244 243 245 248 244 244 245 244 244 245 3,906 See end of report for important Notes and Disclaimers. Tube Area Spacing Covered 9 164 9 165 9 167 9 167 9 169 9 163 9 171 9 169 9 169 9 172 9 168 9 167 9 167 9 166 9 164 9 164 2,670 Manifold Type SIR SIR Manifold Length' Pipe Head Loss None Selected --1.0 None Selected --1.0 None Selected - -1.0 None Selected --1.0 -- -Tubing Flow rate Barrier PEX 518" 2.22 Barrier PEX 518" 2.23 Barrier PEX 5/8" 2.26 Barrier PEX 5/8" 2.26 Barrier PEX 5/8" 2.29 Barrier PEX 5/8" 2.20 Barrier PEX 5/8" 2.31 Barrier PEX 5/8" 2.29 Barrier PEX 5/8" 2.29 Barrier PEX 5/8" 2.34 Barrier PEX 5/8" 2.27 Barrier PEX 5/8" 2.26 Barrier PEX 5/8" 2.26 Barrier PEX 5/8" 2.24 Barrier PEX 5/8" 2.22 Barrier PEX 5/8" 2.22 -36.17 Snow Melt System Design Report May 31, 2018 Circuit SIR Total Head Loss Head Loss Head Loss• 25.3 0.0 26.3 25.9 0.0 26.9 24.6 0.0 25.6 23.9 0.0 24.9 26.9 Head Temp Load Loss' Drop 22.8 25 24,590 22.9 25 24,710 23.4 25 24,987 23.5 25 25,059 24.1 25 25,372 22.5 25 24,412 24.5 25 25,599 23.9 25 25,328 24.2 25 25,405 25.3 25 25,862 23.7 25 25,137 23.5 25 25,002 23.5 25 24,981 23.3 25 24,837 22.8 25 24,562 23.0 25 24,618 25.3 400,462 Created Using LoopCAD 2017 (5/31/2018) Version:17.0.0680 R Page 3 of 7 Name:Vail International Condominiums Snow Melt Project#: Manifold 2 Circuit Areas Served A-33 West Snow Melt Area B A-34 West Snow Melt Area B A-35 West Snow Melt Area B A-36 West Snow Melt Area B A-37 West Snow Melt Area B A-38 West Snow Melt Area B A-39 West Snow Melt Area B A-40 West Snow Melt Area B A-41 West Snow Melt Area B A-43 West Snow Melt Area B A-44 West Snow Melt Area B A-45 West Snow Melt Area B A-46 West Snow Melt Area B A-47 West Snow Melt Area B A-55 West Snow Melt Area B Total -(1) Head loss for circuit tubing only Total Length 244 244 244 244 245 244 245 244 245 245 244 246 245 245 243 3,669 See end of report for important Notes and Disclaimers. Tube Area Spacing Covered 9 171 9 170 9 173 9 174 9 174 9 174 9 176 9 172 9 173 9 175 9 171 9 172 9 170 9 172 9 168 2,584 Tubing Flowrate Barrier PEX 5/8" 2.31 Barrier PEX 5/8" 2.31 Barrier PEX 5/8" 2.34 Barrier PEX 5/8" 2.35 Barrier PEX 5/8" 2.36 Barrier PEX 5/8" 2.36 Barrier PEX 5/8" 2.38 Barrier PEX 5/8" 2.33 Barrier PEX 5/8" 2.34 Barrier PEX 5/8" 2.36 Barrier PEX 5/8" 2.32 Barrier PEX 5/8" 2.33 Barrier PEX 5/8" 2.30 Barrier PEX 5/8" 2.33 Barrier PEX 5/8" 2.28 -35.01 Snow Melt System Design Report May 31, 2018 Head Loss' 24.5 24.4 25.0 25.2 25.6 25.4 25.9 24.9 25.1 25.6 24.7 24.9 24.4 25.0 23.8 25.9 Temp Load Drop 25 25,575 25 25,570 25 25,884 25 26,054 25 26,167 25 26,145 25 26,340 25 25,804 25 25,912 25 26,185 25 25,695 25 25,750 25 25,461 25 25,844 25 25,245 387,629 Created Using LoopCAD 2017 (5/31/2018) Version:17.0.0680 R Page 4 of 7 Name:Vail International Condominiums Snow Melt • Project#: Manifold 3 Circuit Areas Served Total Tube Area Length Spacing Covered A-17 East Snow Melt Area C 239 9 164 A-18 East Snow Melt Area C 234 9 161 A-19 East Snow Melt Area C 233 9 161 A-20 East Snow Melt Area C 232 9 161 A-21 East Snow Melt Area C 230 9 160 A-22 East Snow Melt Area C 230 9 160 A-23 East Snow Melt Area C 229 9 161 A-24 East Snow Melt Area C 229 9 160 A-25 East Snow Melt Area C 230 9 161 A-26 East Snow Melt Area C 229 9 159 A-27 East Snow Melt Area C 233 9 162 A-28 East Snow Melt Area C 231 9 160 A-29 East Snow Melt Area C 232 9 160 A-30 East Snow Melt Area C 228 9 157 A-31 East Snow Melt Area C 233 9 159 A-42 East Snow Melt Area C 248 9 170 Total -3,719 2,576 (1) Head loss for circuit tubing only See end of report for important Notes and Disclaimers. Tubing Flowrate Barrier PEX 5/8" 2.22 Barrier PEX 5/8" 2.18 Barrier PEX 5/8" 2.18 Barrier PEX 5/8" 2.18 Barrier PEX 5/8" 2.17 Barrier PEX 5/8" 2.17 Barrier PEX 5/8" 2.18 Barrier PEX 5/8" 2.17 Barrier PEX 5/8" 2.18 Barrier PEX 5/8" 2.16 Barrier PEX 5/8" 2.19 Barrier PEX 5/8" 2.17 Barrier PEX 5/8" 2.17 Barrier PEX 5/8" 2.12 Barrier PEX 5/8" 2.16 Barrier PEX 5/8" 2.30 -34.89 Snow Melt System Design Report May 31, 2018 Head Loss' 22.3 21.2 21.1 21.0 20.8 20.7 20.7 20.6 20.7 20.4 21.3 20.8 20.9 19.7 20.8 24.6 24.6 Temp Load Drop 25 24,554 25 24,133 25 24,135 25 24, 113 25 24,057 25 24,052 25 24,090 25 24,022 25 24,096 25 23,874 25 24,288 25 24,050 25 24,063 25 23,477 25 23,892 25 25,439 386,337 Created Using LoopCAD 2017 (513112018) Version:17.0.0680 R Page 5 of 7 Name:\/ail International Condominiums Snow Melt • Project#: Manifold 4 Circuit Areas Served Total Tube Area Length Spacing Covered A-1 East Snow Melt Area 0 234 9 165 A-2 East Snow Melt Area 0 233 9 165 A-3 East Snow Melt Area 0 232 9 165 A-4 East Snow Melt Area D 231 9 165 A-5 East Snow Melt Area D 232 9 167 A.fJ East Snow Melt Area D 229 9 165 A-7 East Snow Melt Area 0 232 9 167 A-8 East Snow Melt Area D 236 9 171 A-9 East Snow Melt Area 0 234 9 169 A-10 East Snow Melt Area D 233 9 167 A-12 East Snow Melt Area D 234 9 167 A-13 East Snow Melt Area D 233 9 165 A-14 East Snow Melt Area D 233 9 164 A-15 East Snow Melt Area 0 234 9 164 A-16 East Snow Melt Area D 233 9 168 A-32 East Snow Melt Area 0 236 9 165 Total -3,729 2,659 (1) Head loss for circuit tubing only See end of report for important Notes and Disclaimers. Tubing Flowrate Barrier PEX 5/8" 2.24 Barrier PEX 5/8" 2.24 Barrier PEX 5/8" 2.24 Barrier PEX 5/8" 2.24 Barrier PEX 5/8" 2.27 Barrier PEX 5/8" 2.24 Barrier PEX 5/8" 2.27 Barrier PEX 5/8" 2.32 Barrier PEX 5/8" 2.28 Barrier PEX 5/8" 2.26 Barrier PEX 5/8" 2.26 Barrier PEX 5/8" 2.24 Barrier PEX 5/8" 2.22 Barrier PEX 5/8" 2.22 Barrier PEX 5/8" 2.28 Barrier PEX 5/8" 2.24 -36.02 Snow Melt System Design Report May 31, 2018 Head Loss' 22.1 22.0 21.9 21.8 22.5 21.7 22.4 23.9 23.0 22.4 22.6 22.0 21.8 21.8 22.7 22.3 23.9 Temp Load Drop 25 24,752 25 24,752 25 24,752 25 24,752 25 25,090 25 24,752 25 25,083 25 25,688 25 25,287 25 24,988 25 25,020 25 24,761 25 24,629 25 24,538 25 25, 190 25 24,752 398,785 Created Using LoopCAD 2017 (5/31/2018) Version:17.0.0680 R Page 6 of 7 Name·Nail International Condominiums Snow Melt • Project#: Disclaimers Snow Melt System Design Report May 31, 2018 The calculated values shown in this report are based on the data input by the user of the software. Inaccurate or erroneous data input will result in inaccurate or erroneous results. You are strongly advised to review all input data carefully, and to have the calculated results reviewed by an experienced heating professional to ensure reasonableness and suitability for your application. IN NO EVENT WILL AVENIR SOFTWARE INC. ("AVENIR") OR ITS AFFILIATES BE LIABLE UNDER ANY CONTRACT, NEGLIGENCE, STRICT LIABILITY OR OTHER LEGAL OR EQUITABLE THEORY FOR ANY CONSEQUENTIAL, INCIDENTAL, INDIRECT OR SPECIAL OR PUNITIVE DAMAGES WHATSOEVER (INCLUDING, BUT NOT LIMITED TO, DAMAGES FOR LOSS OF BUSINESS PROFITS, BUSINESS INTERRUPTION, LOSS OF BUSINESS INFORMATION OR DATA AND THE LIKE), EVEN IF SUCH PARTY HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. AVENIR'S CUMULATIVE LIABILITY FROM ANY CAUSE RELATED TO OR ARISING FROM THE USE THIS REPORT, AND REGARDLESS OF THE FORM OF THE ACTION, SHALL BE LIMITED TO NO GREATER THAN THE AMOUNT OF FEES PAID TO AVENIR UNDER THE SOFTWARE LICENSE AGREEMENT. See end of report for important Notes and Disclaimers. Created Using LoopCAD 2017 (5/31/2018) Version:17.0.0680 R Page 7 of 7 Project Information Project#: ® 2017 Name: Location: Vail International Condominiums Snow Melt Vail, CO Water Supply Summary May 31, 2018 Notes: ls~pp1Y5u;-~;;y -------------------------------------------------------------------__ m___ I Name Temp Total Flow Water Temperature 132.0 142.09 (1) Head loss includes manifolds, circuits, and supply/return piping if specified, may also contain control valve losses. See end of report for important Notes and Disclaimers. Head Loss' Load 26.9 1,573,214 #Circuits 63 Created Using LoopCAD 2017 (5/31/2018) Version:17.0.0680 R Page 1 of6 Name:Vail International Condominiums Snow Melt Project#: Water Supply Summary May 31, 2018 I Manifold Summary ~ Manifold Name Circuits Flowrate Required Supplied Manifold Type S/R S/R Manifold Circuit S/R Total Temp. Temp. Length' Pipe Head Loss Head Loss Head Loss Head Loss• Manifold 1 16 36.17 131 132 None Selected - -1.0 25.3 0.0 26.3 Manifold 2 15 35.01 131 132 None Selected --1.0 25.9 0.0 26.9 Manifold 3 16 34.89 130 132 None Selected - -1.0 24.6 0.0 25.6 Manifold 4 16 36.02 132 132 None Selected --1.0 23.9 0.0 24.9 Total 63 142.09 132 --- -26.9 (1) SIR Length= one way, (2) Total Head loss indudes manifold, circuits and supply/return piping if specified. I Water Temperature ( 132 °F) I Manifold 1 ( 132 °F, None Selected, 16 Circuits) Circuit Areas Served Total Tube Area Length Spacing Covered A-48 West Snow Melt Area A 243 9 164 A-49 West Snow Melt Area A 243 9 165 A-50 West Snow Melt Area A 244 9 167 A-51 West Snow Melt Area A 243 9 167 A-52 West Snow Melt Area A 244 9 169 A-53 West Snow Melt Area A 243 9 163 A-54 West Snow Melt Area A 244 9 171 A-56 West Snow Melt Area A 243 9 169 A-57 West Snow Melt Area A 245 9 169 A-58 West Snow Melt Area A 248 9 172 A-59 West Snow Melt Area A 244 9 168 A-60 West Snow Melt Area A 244 9 167 A-61 West Snow Melt Area A 245 9 167 A-62 West Snow Melt Area A 244 9 166 A-63 West Snow Melt Area A 244 9 164 A-64 West Snow Melt Area A 245 9 164 Total -3,906 2,670 (1) Head loss for circuit tubing only. (2) Design Temp Drop (Estimated Actual Drop). (3) Load indudes circuit back loss. See end of report for important Notes and Disclaimers. Tubing Flowrate Head Loss' Barrier PEX 5/8" 2.22 22.8 Barrier PEX 5/8" 2.23 22.9 Barrier PEX 5/8" 2.26 23.4 Barrier PEX 5/8" 2.26 23.5 Barrier PEX 5/8" 2.29 24.1 Barrier PEX 5/8" 2.20 22.5 Barrier PEX 5/8" 2.31 24.5 Barrier PEX 5/8" 2.29 23.9 Barrier PEX 5/8" 2.29 24.2 Barrier PEX 5/8" 2.34 25.3 Barrier PEX 5/8" 2.27 23.7 Barrier PEX 5/8" 2.26 23.5 Barrier PEX 5/8" 2.26 23.5 Barrier PEX 5/8" 2.24 23.3 Barrier PEX 5/8" 2.22 22.8 Barrier PEX 5/8" 2.22 23.0 -36.17 25.3 Temp Load' Drop• 25 24,590 25 24,710 25 24,987 25 25,059 25 25,372 25 24,412 25 25,599 25 25,328 25 25,405 25 25,862 25 25, 137 25 25,002 25 24,981 25 24,837 25 24,562 25 24,618 -400,462 Created Using LoopCAD 2017 (5/31/2018) Version:17.0.0680 R Page 2 of 6 Name:Vail International Condominiums Snow Melt Project#: Manifold 2 ( 132 °F, None Selected, 15 Circuits) Circuit Areas Served Total Length A-33 West Snow Melt Area B 244 A-34 West Snow Melt Area B 244 A-35 West Snow Melt Area B 244 A-36 West Snow Melt Area B 244 A-37 West Snow Melt Area B 245 A-38 West Snow Melt Area B 244 A-39 West Snow Melt Area B 245 A-40 West Snow Melt Area B 244 A-41 West Snow Melt Area B 245 A-43 West Snow Melt Area B 245 A-44 West Snow Melt Area B 244 A-45 West Snow Melt Area B 246 A-46 West Snow Melt Area B 245 A-47 West Snow Melt Area B 245 A-55 West Snow Melt Area B 243 Total -3,669 Tube Area Spacing Covered 9 171 9 170 9 173 9 174 9 174 9 174 9 176 9 172 9 173 9 175 9 171 9 172 9 170 9 172 9 168 2,584 (1) Head loss for circuit tubing only. (2) Design Temp Drop (Estimated Actual Drop). (3) Load indudes circuit back loss. See end of report for important Notes and Disclaimers. Tubing Flowrate Head Loss' Barrier PEX 5/8" 2.31 24.5 Barrier PEX 5/8" 2.31 24.4 Barrier PEX 5/8" 2.34 25.0 Barrier PEX 5/8" 2.35 25.2 Barrier PEX 5/8" 2.36 25.6 Barrier PEX 5/8" 2.36 25.4 Barrier PEX 5/8" 2.38 25.9 Barrier PEX 5/8" 2.33 24.9 Barrier PEX 5/8" 2.34 25.1 Barrier PEX 5/8" 2.36 25.6 Barrier PEX 5/8" 2.32 24.7 Barrier PEX 5/8" 2.33 24.9 Barrier PEX 5/8" 2.30 24.4 Barrier PEX 5/8" 2.33 25.0 Barrier PEX 5/8" 2.28 23.8 -35.01 25.9 Water Supply Summary May 31, 2018 Temp Load• Drop• 25 25,575 25 25,570 25 25,884 25 26,054 25 26,167 25 26,145 25 26,340 25 25,804 25 25,912 25 26,185 25 25,695 25 25,750 25 25,461 25 25,844 25 25,245 -387,629 Created Using LoopCAD 2017 (5/31/2018) Version:17.0.06BO R Page 3 of 6 Name:Vail International Condominiums Snow Melt Proji;tt ~: Manifold 3 ( 132 °F, None Selected, 16 Circuits) Circuit Areas Served Total Length A-17 East Snow Melt Area C 239 A-18 East Snow Melt Area C 234 A-19 East Snow Melt Area C 233 A-20 East Snow Melt Area C 232 A-21 East Snow Melt Area C 230 A-22 East Snow Melt Area C 230 A-23 East Snow Melt Area C 229 A-24 East Snow Melt Area C 229 A-25 East Snow Melt Area C 230 A-26 East Snow Melt Area C 229 A-27 East Snow Melt Area C 233 A-28 East Snow Melt Area C 231 A-29 East Snow Melt Area C 232 A-30 East Snow Melt Area C 228 A-31 East Snow Melt Area C 233 A-42 East Snow Melt Area C 248 Total -3,719 Tube Area Spacing Covered 9 164 9 161 9 161 9 161 9 160 9 160 9 161 9 160 9 161 9 159 9 162 9 160 9 160 9 157 9 159 9 170 2,576 (1) Head loss for circuit tubing only. (2) Design Temp Drop (Estimated Actual Drop). (3) Load includes circuit back loss. See end of report for important Notes and Disclaimers. Tubing Flowrate Head Loss' Barrier PEX 5/8" 2.22 22.3 Barrier PEX 5/8" 2.18 21.2 Barrier PEX 5/8" 2.18 21.1 Barrier PEX 5/8" 2.18 21.0 Barrier PEX 5/8" 2.17 20.8 Barrier PEX 5/8" 2.17 20.7 Barrier PEX 5/8" 2.18 20.7 Barrier PEX 5/8" 2.17 20.6 Barrier PEX 5/8" 2.18 20.7 Barrier PEX 5/8" 2.16 20.4 Barrier PEX 5/8" 2.19 21.3 Barrier PEX 5/8" 2.17 20.8 Barrier PEX 5/8" 2.17 20.9 Barrier PEX 5/8" 2.12 19.7 Barrier PEX 5/8" 2.16 20.8 Barrier PEX 5/8" 2.30 24.6 -34.89 24.6 Water Supply Summary May 31, 2018 Temp Load' Drop• 25 24,554 25 24, 133 25 24, 135 25 24,113 25 24,057 25 24,052 25 24,090 25 24,022 25 24,096 25 23,874 25 24,288 25 24,050 25 24,063 25 23,477 25 23,892 25 25,439 -386,337 Created Using LoopCAD 2017 (5/31/2018) Version:17.0.06BO R Page 4 of 6 Name:Vail International Condominiums Snow Melt Project 1#: Manifold 4 ( 132 °F, None Selected, 16 Circuits) Circuit Areas Served Total Length A-1 East Snow Melt Area D 234 A-2 East Snow Melt Area D 233 A-3 East Snow Melt Area D 232 A-4 East Snow Melt Area D 231 A-5 East Snow Melt Area D 232 A-6 East Snow Melt Area D 229 A-7 East Snow Melt Area D 232 A-8 East Snow Melt Area D 236 A-9 East Snow Melt Area D 234 A-10 East Snow Melt Area D 233 A-12 East Snow Melt Area D 234 A-13 East Snow Melt Area D 233 A-14 East Snow Melt Area D 233 A-15 East Snow Melt Area D 234 A-16 East Snow Melt Area D 233 A-32 East Snow Melt Area D 236 Total -3,729 Tube Area Spacing Covered 9 165 9 165 9 165 9 165 9 167 9 165 9 167 9 171 9 169 9 167 9 167 9 165 9 164 9 164 9 168 9 165 2,659 (1) Head loss for circutt tubing only. (2) Design Temp Drop (Estimated Actual Drop). (3) Load includes circuit back loss. See end of report for important Notes and Disclaimers. Tubing Flowrate Head Loss' Barrier PEX 5/8" 2.24 22.1 Barrier PEX 5/8" 2.24 22.0 Barrier PEX 5/8" 2.24 21.9 Barrier PEX 5/8" 2.24 21.8 Barrier PEX 5/8" 2.27 22.5 Barrier PEX 5/8" 2.24 21.7 Barrier PEX 5/8" 2.27 22.4 Barrier PEX 5/8" 2.32 23.9 Barrier PEX 5/8" 2.28 23.0 Barrier PEX 5/8" 2.26 22.4 Barrier PEX 5/8" 2.26 22.6 Barrier PEX 5/8" 2.24 22.0 Barrier PEX 5/8" 2.22 21.8 Barrier PEX 5/8" 2.22 21.8 Barrier PEX 5/8" 2.28 22.7 Barrier PEX 5/8" 2.24 22.3 -36.02 23.9 Water Supply Summary May 31, 2018 Temp Load• Drop" 25 24,752 25 24,752 25 24,752 25 24,752 25 25,090 25 24,752 25 25,083 25 25,688 25 25,287 25 24,988 25 25,020 25 24,761 25 24,629 25 24,538 25 25,190 25 24,752 -398,785 Created Using LoopCAD 2017 (5/31/2018) Version:17.0.0680 R Page 5 of 6 Name:Vail International Condominiums Snow Melt Proje-.::t"#: Disclaimers Water Supply Summary May 31, 2018 The calculated values shown in this report are based on the data input by the user of the software. Inaccurate or erroneous data input will result in inaccurate or erroneous results. You are strongly advised to review all input data carefully, and to have the calculated results reviewed by an experienced heating professional to ensure reasonableness and suitability for your application. IN NO EVENT VI/ILL AVENIR SOFTWARE INC. ("AVENIR") OR ITS AFFILIATES BE LIABLE UNDER ANY CONTRACT, NEGLIGENCE, STRICT LIABILITY OR OTHER LEGAL OR EQUITABLE THEORY FOR ANY CONSEQUENTIAL, INCIDENTAL, INDIRECT OR SPECIAL OR PUNITIVE DAMAGES WHATSOEVER (INCLUDING, BUT NOT LIMITED TO, DAMAGES FOR LOSS OF BUSINESS PROFITS, BUSINESS INTERRUPTION, LOSS OF BUSINESS INFORMATION OR DATA AND THE LIKE), EVEN IF SUCH PARTY HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. AVENIR'S CUMULATIVE LIABILITY FROM ANY CAUSE RELATED TO OR ARISING FROM THE USE THIS REPORT, AND REGARDLESS OF THE FORM OF THE ACTION, SHALL BE LIMITED TO NO GREATER THAN THE AMOUNT OF FEES PAID TO AVENIR UNDER THE SOFTWARE LICENSE AGREEMENT. See end of report for important Notes and Disclaimers. Created Using LoopCAD 2017 (5/31/2018) Version:17.0.0680 R Page 6 of 6