Loading...
HomeMy WebLinkAboutB01-0191 plans/ GENERAL UOTES: 1834 GLACIER,..,COURT WEST JOB #0106-08 DESIGN CRITERIA: Deck Live Load ----------------------- 100 paf Load _____----------- ------ 10 paf -- Dead Hot Tub Lo O5 af �d ----------------________ p 1 Seismic m------------------------ -� UBCEditkm - - - - - - - - - - - - - - - - - - - - - - - - - 1897 FQUNDATI.ON DESIGN:_ o' Design of individual footings is based on o ma allowable bearing pressure of 2000 pof (dead load plus full live load). b. Footings ahoU be placed on the natural undisturbed ool|, or compacted structural fill, below frost depth. C. This fo undation has been designed according to the desi recommendations set forth in geoteoh i | report 98-0321C by Inte Engineering Ltd. The contractor shall fnUovv the construction requirements from this some report. d A representative of the gnotechnico| engineer shall verify soils ' co and t ' - durin excavation. Report any discrepancies from -- original fin to s engineer for re-evaluation of foundation design. REINFORCED.. CONCRETE o. Concrete design is based on the "Building Code Requirements for Reinforced Concrete" /AC| 318-95\. b' Structural concrete oh'U have o minimum 28-doy compressive strength of 3000 poi. C. Concrete shall be proportioned using Tvoo |-|| sulfate rma��tmnt cement. Adrnixturws containing chloride salts nho|| not be used. d. Cold weather concreting procedures ahoi( be provided as recommended in the ACI Manual of Concrete a. Anchor bolts for column bearing plates uho\\ be piound with setting ternp|otme, , f. All exposed edges and corners shall be chamfered 3/4". g ' Concrete coverage for reinforcing steel /AQ 318-95\: , 1. Concrete cast against and perma exposed to earth 3 2 ' Concrete exposed to earth or weather [ � A. #5 bar and ornoUwr 1 ' '1/2" B. '' - ^ through �oO bar 2' � �onoro-- not expos to weather or in contact with ground: A. Sl abs, walls, a. joists / bar and �rnoUer\ 5 - /2' O. Beams, columns 1 ' REINFORCING TEEL: o. Detailing, fabrication and placement of reinforcing atwo| ahoU be in accordance with the ACI Manual of Concrete Practice. b E m t where otherwise noted on the u/uwre "/y�` " ~..~ ~. --'f- _ ' ---' rn� to A�TW � ��oi�oo�on A815-78 and shall b� grade 00 except field bent bars where permitted by note on plan, or bona to be we|ded, which ahoU be grade 40 C. At splices in oonorete, lo p bars 36 diameters. Do not weld or use rnochonioo| splicing devices un|woa specifically approved by engineer. d At corners, ake horizontal bore continuous or provide corner burs. ' Around op and steps in concrete, provide /2\-#5 bars extending 2,-0" beyond edge of opening or step. o Extand -no/ng steel o min o 2��' through cold j Unless ' specific ' ��|coted on pion or detoi(o, coordinate cold joint locations with engineer. t K8etho bar size conversion table: METRIC INCH #36 ' o where noted otherwise, all 2. nominal lumber, except studs, - - ` -'--''e Douglas Fir-Larch ' r-Loro ond better, and all solid timber baonou and posts � 3" nominal and wider shall be Douglas Fir-Larch #2. b. Studs ~~~ -': and better Doug|osFlr-Loroh or Hono Fir. C. Except oa noted otherwise, minimum nailing shall be provided as ' ^~` the "Nailing S on the drawings (UBC Table 23-11-B-1). d~ spec | for wood framing connections ahoU be installed with standard washers and nuts. o ' Un|000 noted otherwioe, steel connectors such as those manufactured by the Simpson Company ehoU be used to ^ |n rafters, j or beams to other beams at flush-framed conditions. Use Use U specified nails. Connector conditions not otherwise noted ohnU utilize Type U or Type HU hangers of o size specifically designed for the member eupported, as shown in the manufacturer's publi tab|os. Contact structural engineer for details as required. STRUCTURAL GLUED. LAMINATED TIMBER: o Materials, manufacturer and quality t control shall be in conformance ` with A|TO Product Standard PS 6-82` "Structural Glued Laminated Timber". b. Laminated members oho|| be fabricated using Dnug|oa Fir with the following combination symbols: - 4f-v4 Simple-span boorna 24f-v8 Continuous or cantilever boorns 5 Columns C. All rnonnbern nho|| be Architectural Appearance Grade, un|woa indicated otherwise by the architect. � d, Protect members form damage or exposure to moisture prior to and - during construction. e. Adhes aho|| meet the requirements for wet conditions of service. f. Do no t comber |onn|noted members un|aaa indicated on the drawings. o o. Verify type of fill with soils engineer and structural engineer prior to � boo~UUng. � 6 o. All grout beneath column base p(otmo and steel beams ot ba�rin shall - b� non-shrink, non-metallic type grout Grout shall have o minimum � , ^ - compressive strength of 2500 psi. co UJ ' ` � � _ ~ GENERAL REQUIREMENTS. o. Structural erection and braci The structural drawings illustrate the completed structure with all e in their final positions, properl supported and braced. The Contractor, in the proper sequence, shall --,r- shoring and bracing as may be required during construction to achieve r'-�-- e the final completed structure. Contact the structural engineer for consultation (not in contract) as required. b. Existing structures: If construction adjoins on existing structure, contractor ehoU be responsible for verifying dimensions, elevations, anyth framing, foundation and | that may effect the work shown on the drawings. Underpinning, shoring and bracing of existing structures shall be the responsibility of the contractor. C. Dimensions: wmo^ al ux.==".= against arc . d ' p rior to construction. Do not aoo|e drawings. d Construction pnoot�ooa; General Contractor is responsible for means, ^ � methods, techniques, sequences and procedures for construction of this project. Notify s tructural engineer of omissions or conflicts betvveent> e working drawings and existing conditions. Coordinate requirements for m ng penetrotions through structural elements with str engineer. Jobaitm safety is the sole responsibility of the cnntrootor. All methods used for construction ahu|| be in accordance with the |otmat edition of the UBC, e' It is the responsibility of the contractor to contact the structural engineer at the appropriate time to perform site observation visits. Observation visits t o he jobsite by the engineer are for determination of general conformance w the construction dnournonto and shall not be construed as inspection. t Though every effort is made to provide o complete and clear set of con docurnunto, discrepancies or omissions may occur. Release of these drawings anti cooperation and continued communication between - the contractor, architect and engineer to provide the best possible structure. These drawings have been prepared for the use of o qualified contractor experienced in the construction techniques and uyatorna depicted. NAILING SCHEDULE 2x floor kjoist to girder, nU| or wall plate (toenail) |-' ist to girder, nU| or wall plate (down thru bottom chord) Sole plate to joist or blocking (face nail) Top plate to stud (end nail) Stud to sole plate Double studs (face noU) Doubled too p|otno (face nail) Top plates, laps and intersections (face noU\ Continuous header, two pieces Continuous header to king stud (toenail) Ceiling/floor j |opa over partitions (face nail) Ceiling/floor joists to parallel rafters (face nail) Solid-sawn rafter to plate |-oist rafter to plate (down thru bottom chord) Built-up corner studs Built-up beunno (each nnennbar to adj Plywood or OSB roof/wall/floor sheathing J-Bd 2-1Od 1Od @ 18" 2-10d 4-8d (toenail) or 2-18d /endnoi|\ � 10d @ 24 10d @ 16 2_10d 15d @ 10" along each edge 3-1Od 3-10d 3-8d toenails or Simpson H5 2 - 12d 1Od @ 24" 1Od @ 12' along each edge 8d 00" along ed Od @ 12" intermediate supports 1. The noUo in this schedule are common wire or box nails. If cooler, oinkor, or other tvoao of noUo one used, contact engineer for required spacing and sizes. � 2. If staples are used, contact engineer for required spacing and sizes. 3. This schedule indicates roininnunn requirements for nailing. Where special conditions exist, use the specified nailing indicated on the plans and details. A. B. CONNECTION SCHEDULE JOIST A.F.F. ABOVE FINISHED FLOOR LAM. LAMINATED A.F.G. NAILING SCHEDULE 2x floor kjoist to girder, nU| or wall plate (toenail) |-' ist to girder, nU| or wall plate (down thru bottom chord) Sole plate to joist or blocking (face nail) Top plate to stud (end nail) Stud to sole plate Double studs (face noU) Doubled too p|otno (face nail) Top plates, laps and intersections (face noU\ Continuous header, two pieces Continuous header to king stud (toenail) Ceiling/floor j |opa over partitions (face nail) Ceiling/floor joists to parallel rafters (face nail) Solid-sawn rafter to plate |-oist rafter to plate (down thru bottom chord) Built-up corner studs Built-up beunno (each nnennbar to adj Plywood or OSB roof/wall/floor sheathing J-Bd 2-1Od 1Od @ 18" 2-10d 4-8d (toenail) or 2-18d /endnoi|\ � 10d @ 24 10d @ 16 2_10d 15d @ 10" along each edge 3-1Od 3-10d 3-8d toenails or Simpson H5 2 - 12d 1Od @ 24" 1Od @ 12' along each edge 8d 00" along ed Od @ 12" intermediate supports 1. The noUo in this schedule are common wire or box nails. If cooler, oinkor, or other tvoao of noUo one used, contact engineer for required spacing and sizes. � 2. If staples are used, contact engineer for required spacing and sizes. 3. This schedule indicates roininnunn requirements for nailing. Where special conditions exist, use the specified nailing indicated on the plans and details. A. B. ANCHOR BOLT JST JOIST A.F.F. ABOVE FINISHED FLOOR LAM. LAMINATED A.F.G. ABOVE FINISHED GRADE LONG| LONGITUDINAL ADJ. ADJUSTABLE LTWT. LIGHTWEIGHT ANCH. ANCHOR LVL LAMINATED VENEER LUMBER APPROX. APPROXIMATELY LSL LAMINATED STRAND R|k4 MATERIAL ARCH' ARCHITECT MAX. MAXIMUM BD. BOARD MECH. MECHANICAL BLDG. BUILDING MAl MATERIAL BLKG. BLOCKING MANUF. MANUFACTURER BM. BE/\W MIN. W|N|MUkJ BOT BOTTOM (N) NEW B.O.YV. BOTTOM OF WALL ' NOM. NOMINAL 8RG. BEARING O.C. ON CENTER CANT. CANTILEVER 0PNG. OPENING C. J. CONTROL JOINT 0SB ORIENTED STRAND BOARD CMU CONCRETE MASONRY UNIT I� PLATE CEM. CEMENT PLYYYD. PLYWOOD CLG. CEILING R.O. ROUGH OPENING . CENTERLINE RAD. RADIUS CL R. CLEARANCE REF. REFERENCE COL. COLUMN RBNF . RBNFORCE/RBNF(}RCEMENT / CONC. CONCRETE ` RE()D REQUIRED CONN. CONNECTION RET RETAINING CONT. CONTINUOUS REV. REVISION CONST. CONSTRUCTION R.S. ROUGH SAWN C.P^ CRIPPLE POST SCHED. SCHEDULE DBL. DOUBLE SECT. SECTION DET. DETAIL SH'[ SHEET D|AG. DIAGONAL Sim. SIMILAR DWQ, DRAWING SPEC. SPECIFICATION EA. EACH SQ. SQUARE E.J. EXPANSION JOINT STO, STANDARD ELEV. ELEVATION BTL. STEEL ENG. ENGINEER 3TRUCT. STRUCTURAL EQUIP. EQUIPMENT T TRIMMER EQUIV. EQUIVALENT T&B TOP & BOTTOM EXSTG. EXISTING TfbG TONGUE 8u GROOVE EXISTING T.0.C. TOP OF CONCRETE ``P. EXPANSION T.O.F. TOP OF FOOTING EXT. EXTERIOR T.O.L. TOP OF LEDGE F.D. FLOOR DRAIN T.0.M. TOP OF MASONRY FDTN. FOUNDATION T. 0. TOP OF FLR. FLOOR T.O.W. TOP OF WALL FRMG. FRAMING THRU THROUGH FTG. FOOTING TRANSV' TRANSVERSE GA, GAUGE T8 TUBE STEEL COLUMN 6ALV. GALVANIZED TYP. TYPICAL GEN. GENERAL U.N.O. UNLESS NOTED OTHERWISE G.L. GLUE-LAM VERl[ VERTICAL GYP. CYPSUW/GYPCRETE V.|.F' VERIFY IN FIELD HDR. HEADER W.F. , IDE DE FLANGE HOR|Z^ HORIZONTAL W.P. WATERPROOF Hl HEIGHT YKVKF- WELDED WIRE FABRIC INT. INTERIOR WD. WOOD INV. INVERTED WITH K KING STUD W/0 WITHOUT O C cn cn C O U (A Y (N 0 m 0 I QD 0 p cr L, U Q 0 00 0 I 0 E i c I I r� I 12" 0 CONC. PIER 0 (2) — #5 DWLS x 6" (IF PIER HEIGHT EXCEEDS 4' -0, ADD (2) — #5 VERT. BARS FULL HEIGHT OF PIER) SEE SCHED. FOR REINF. SCALE: 3/4" = 1' -0" VERIFY (E) BLKG. (E) 2x1O's @ 16" Q.C. DECK JOISTS 2xl C+ • O • O L 98 wl � ;. (N) 3 1/8x13 1/2 G.L. --' 8x8 POST NOTCHED TO HOLD G.L. OVERFRAME STAIRS 2x6 DECKING — _ � \ i VERIFY (E) HANGERS AND LEDGERS (2) -3/4" 0 THRU —BOLTS (E) 3 1 /8x13 1/2 G.L. SCALE: 3/4" = 1' -0" •• • • i� I I i f WEST UNIT 1 ! I I EAST UNIT I i S2 -- ,-- r-- �-- -- -�- -- -T -- T- -� - -C— — 1-- 1- --r— -- �-- ---, -1 — T i I— .— €-- _.�-_r— .-- .- - - -J I I I I I I i I I I I I I ! ,I I I I I I! 1 1 1 I I I I i I I I I I I EC — I I T.O IDEC� I I I I I I I I I I ! I 1 I () E '2x1d's i I I I I I I I I I @i 16" 0.C. I I I i I I i I I I I I I I I I I I I I i I I (E) 13 1/ 8x1 1/2 G.L[ I I I Q TYP. I I I I CONIT. I I I I I (E) 8x8, TYP. -..� 1 - 1 — I I P t 1 - f - ,r,-1 i — - T — I - `r1` -- t — -- rl - r - I t I — I ( j LJ _— J-- i__I_ —L ° — — — — — — — — — — — — — — — — — — — — — — — — NEW JOISTS RUN UNDER I 98 —1 1, (E) JOISTS AND ARE FACE I �+ T. C. D C MOUNTED TO (E) G.L. BEAM N) 2x 0's @ 16" O. P. 1 I I i L--------------------------- LOTTER DECK A / PLAN NOTES: 1. EXISTING STRUCTURE INDICATED ON PLAN AS DASHED LINES 3. DECKING MATERIAL IS 2x6 REDWOOD DECKING 4. WOOD BEAMS ARE DROPPED BELOW DECK JOISTS UNLESS NOTED (FLUSH). 5. "Q" INDICATES CONNECTION TYPE — REF. S1 FOR SCHEDULE. 6. (E) REFERS TO EXISTING CONSTRUCTION, (N) TO NEW `1 J SPREAD FOOTING SCHEDULE TYPE SIZE REINFORCING A 2' -6 x 2' -6 x 1' —O (3) — #5's x 2' -0 EA. WAY FOUND P L A N / PLAN NOTES 1. FOOTING ELEVATIONS ARE BASED ON FINDING ADEQUATE SOIL BEARING CONDITIONS AT THAT DEPTH. CONTACT ENGINEER IF OVEREXCAVATION IS REQUIRED. 2, DO NOT SCALE DRAWINGS. FIELD VERIFY ALL DIMENSIONS. l i (E) DECK PIERS AND FOOTINGS, TYP.