Loading...
HomeMy WebLinkAbout18-7-289 (05-25-18) steel.pdf H P Ku mAR5020 County Road 154 Glenwood Springs, CO 81601 eotechn cai engineering I Engineering Geology Phone: (970)945-7988 `i1aterials Testing I Environmental Fax: (970)945-8454 Email: hpkglenwoodkumarusa.com Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado REINFORCEMENT STEEL INSPECTION REPORT Client: Tina and David Wilson Project No.: 18-7-289 Day: Friday 2609 Davos Trail Date: 5/25/18 Vail, Colorado 81657 Page: 1 of 1 Project: Proposed Additions to Residence, Lot 11, Filing 23, Vail Valley, 1965 Sunburst Drive, Vail, Colorado Area of Inspection: Epoxied Dowels for Addition Foundation Walls. Reference Documents Structural Drawings provided by the contractor. Used: Inspection Notes: Dowel holes were brushed with a wire brush and blown free of debris with compressed air prior to application of HILTI HIT-RE 500V3 Epoxy. Inspection Status: ❑ Preliminary ® Final ® Concrete reinforcement as noted above was judged to be in reasonable conformance with the referenced construction documents. ❑ Exceptions Noted: Verbal S2M personnel were informed of our inspection results. Communication: Distribution: Tina and David Wilson (tinawilsonvail[a)cumail.com) Evans Chaffee Construction—Mark Jones(mlonesAevanschaffee.com) fljf Justin Orgill David A. Young, P.E. Field Technician Reviewed By