Loading...
HomeMy WebLinkAbout18-7-259 (05-22-18) reinforce steel_1.pdf H P Ku mAR 5020 County Road 154 Glenwood Springs, CO 81601 Geotechnical Engine g I L_ Phone: (970)945-7988 Materials Testing I Environmental Fax: (970)945-8454 Email: hpkglenwoodakumarusa.com Office Locations: Parker, Glenwood Springs, and Silverthorne,Colorado REINFORCEMENT STEEL INSPECTION REPORT Client: Viele and Company Project No.: 18-7-259 Day: Tuesday Attn: David Viele Date: 05-22-18 P.O. Box 4310 Page: 1 of 1 Vail, Colorado 81658 Project: Proposed Residence, Lot 12, Block 1, Potato Patch, 790 Potato Patch Drive, Vail, Colorado Area of Inspection: Unit B & C footings and epoxied dowels for Unit B & C footings and walls. Reference Documents Structural drawings provided by the contractor. Used: Inspection Notes: Holes were a minimum of 4" deep and blown and brushed freee of debris prior to application of Dayton Superior all Weather J51W Epoxy. Inspection Status: ❑ Preliminary ® Final ® Installation of dowels as noted above was judged to be in reasonable conformance with the referenced construction documents. ❑ Exceptions Noted: Verbal Contractor was informed of our inspection. Communication: Distribution: Viele and Company-David Viele(davidAvieleandcompany.com) Viele and Company—Ed Glut(ed anvieleandcompanv.com) KRM Consultants—Nicholas Ripp(nicholasakrmconsultants.com) Pierce Architects—Jordan Kalasnik(ikalasnikavailarchitects.com) Alan Kildow(alkildowaaol.com) /kac Justin Orgill Daniel E. Hardin, P.E. Field Technician Reviewed By