Loading...
HomeMy WebLinkAboutB18-0066_16121 LSL BCE Special Inspection Report No. 1_june 5 2018_1529535484.pdf 0 OF I/4 � C �r BC&E 0. I Is 06/20/18 Special Inspection Report No. 1 Project Name: Lions Square Lodge—Conference Room Structural Attachments Location: 600 West Lionshead Place,Vail Colorado 81657 Permit No.: B 18-0066 BC&E No.: 17165 Date(s)of Site Visit: May 29,2018 Date of Report: June 5,2018 Total Pages: 2 Pages Present at Site: Sonja Hinish(BC&E) Tsering Norbu(R.A. Nelson) Background Ms. Sonja Hinish,PE visited the above-referenced site on May 29,2018 to perform a limited visual inspection of the completed welds at the structural steel framing supporting the moveable wall partitions in the Gore/Columbine Rooms and Wildwood Room. We reviewed the steel framing and welds for general conformance with the details in our Drawings dated February 12, 2018. We prepared this report containing a summary of our observations,opinions,and recommendations which were discussed with field personnel while on site.We did not perform any other testing during our site visit. Observations During our site visit,we observed and discussed the following items: 1. Our review included observation and visual inspection of a representative sample of welds at the structural steel framing supporting the new moveable partition walls in the Wildwood and Gore/Columbine Rooms and the ceiling isolation hanger supports installed between steel bar joists in the Gore/Columbine Rooms. It should be noted that we did not perform a 100%visual inspection of the welds as access to the welds and our time on site was limited. Slag was still present on a portion of many of the welds which also limited our review(Photo 1).Based on our design and engineering judgement,we did not observe weld conditions requiring repair or correction.Photos of typical welds can be found in Photo 2 through Photo 4. To the best of my information, knowledge, and belief, the special inspections for the steel framing on this project have been completed in general accordance with our Drawings. Sincerely, O�p,DO LI. %11 r Ov�VPG• F.4(5:<%%1 y'4'i• 11 • 411 , • 5269 � •• clrl(11). (0 5 /9 Sonja Hinish,PE .�t0,�•. � .............. Associate \ S10NAl Son a �igitallysigned J by Sonja Hinish Hinish Date:2018.06.05 11:02:39-06'00' Lions Square Lodge—Conference Room Structural Attachments Special Inspection Report No. 1 June 5,2018 Page 1 of 2 NOli OF le, I'll' .111 ' Ill .0,,, BC&E . _, rr.... ... Ar 4. o•. 3q0= Photos 06/20/18 Ilk .4:.F . _. 4+ f r • ' r. . 1 { 4 4.0. Photo 1: Slag present on a portion of a weld. Photo 2: Typical fillet weld at steel bracing in Wildwood Room. , ir'' wok1 4 ' Ok..- -4 ,, ,i 10.0 rf,i • Photo 3: Typical fillet weld at WT support framing in Photo 4: Typical fillet weld at isolation hanger in Gore/Columbine Room. Gore/Columbine Room. End of report Lions Square Lodge—Conference Room Structural Attachments Special Inspection Report No. 1 June 5,2018 Page 2 of 2