Loading...
HomeMy WebLinkAbout18-7-289 (06-20-18) concrete.pdf H P KU MAR5020 County Road 154 Glenwood Springs, CO 81601 Geotechnical Engineering Engineering Geology Phone: (970)945-7988 Materials Testing Environmental Fax: (970)945-8454 Email: hpkglenwoodt kumarusa.com Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado CONCRETE TEST REPORT Tina and David Wilson Project No. 18-7-289 2609 Davos Trail Date Cast: 05-23-18 Vail, Colorado 81657 Sheet: 1 of 1 Project: Proposed Additions to Residence, Lot 11, Filing 23, Vail Valley, 1965 Sunburst Drive, Vail, Colorado Placement Location: Building Addition Footings Supplier: Casey Concrete Time Batched: 12:41 pm Load Size (Yds): 6 Truck No: 149 Time Arrived: 1:37 pm Yds Delivered: 6 Ticket No: 315847 Time Placed: 1:45 pm Yds Ordered: 12 Mix Design: 3000F Method of Placement: Pump Sample Point: Truck Discharge Time Sampled: 1:50 pm Wet Unit Wt: 145.6 pcf Air Temp: 65° Slump: 4.0 inches Concrete Temp: 71° Air Content: 2.0 % Water Added: None Communication: The contractor and supplier were informed of our field test results. Time Cylinders Cast: 2:00 pm Initial Cure Time on Site: 1 day Field Storage: Insulated Cure Box Date in Lab: 05-24-18 Cylinder Temperature at Pick Up: 76° Min/Max: 60°/76° Compressive Strength Data _ 2018 Compressive 28 Da Lab Age Load Diameter Area y Number Days Date lbs. in. in Strength (psi) Avg. (psi) 329A 7 05-30-18 39,500 4.01 12.63 3130 329B 28 06-20-18 59,800 4.01 12.63 4740 329C 28 06-20-18 58,500 4.01 12.63 4630 4720 329D 28 06-20-18 60,400 4.01 12.63 4780 Specified Strength for Structure: 3000 psi at 28 days Specified Strength for Mix: 3000 psi at 28 days Notes: Distribution: Tina and David Wilson (tinawiisonvail aemmail.com) Evans Chaffee Construction—Mark Jones(mlonesAevanschaffee.com) Building Official City of Vail -Christopher Jarecki (ciareckiAvaiigov.com) Casey Concrete—Shawn Vondette(svondetteAws-concrete.com) Justin Orgill David A. Young, P.E. /ljf Field Technician Reviewed By