Loading...
HomeMy WebLinkAbout18-7-289 (06-27-18) concrete.pdf H P KU MAR5020 County Road 154 Glenwood Springs, CO 81601 Geotechnical Engineering I Engineering Geology Phone: (970)945-7988 Materials Testing I Environmental Fax: (970) 945-8454 Email: hpkglenwood aC�kumarusa.com Office Locations: Parker, Glenwood Springs, and Silverthorne, Colorado CONCRETE TEST REPORT Tina and David Wilson Project No. 18-7-289 2609 Davos Trail Date Cast: 05-30-18 Vail, Colorado 81657 Sheet: 1 of 1 Project: Proposed Additions to Residence, Lot 11, Filing 23, Vail Valley, 1965 Sunburst Drive, Vail, Colorado Placement Location: Building Addition Foundation Walls Supplier: Casey Concrete Time Batched: 11:44 am Load Size (Yds): 10 Truck No: 133 Time Arrived: 12:53 pm Yds Delivered: 10 Ticket No: 315956 Time Placed: 1:05 pm Yds Ordered: 30 Mix Design: 3000F, Footings/Wall Method of Placement: Pump Sample Point: Truck Discharge Time Sampled: 1:10 pm Wet Unit Wt: 146.0 pcf Air Temp: 70° Slump: 41/2 inches Concrete Temp: 76° Air Content: 1.8 % Water Added: 15 gallons per supplier Communication: The supplier was informed of our field test results. Time Cylinders Cast: 1:20 pm Initial Cure Time on Site: 1 day Field Storage: Insulated Cure Box Date in Lab: 05-31-18 Cylinder Temperature at Pick Up: 70° Min/Max: 58°/84° Compressive Strength Data 2018 Compressive 28 Da Lab Age Load Diameter Area Y Number Days Date lbs. in. int Strength (psi) Avg. (psi) 343A 7 06-06-18 36,000 4.01 12.63 2850 343B 28 06-27-18 59,100 4.01 12.63 4680 343C 28 06-27-18 61,200 4.01 12.63 4850 4750 343D 28 06-27-18 59,600 4.01 12.63 4720 Specified Strength for Structure: 3000 psi at 28 days Specified Strength for Mix: 3000 psi at 28 days Notes: Distribution: Tina and David Wilson(tinawilsonvailta gmail.com) Evans Chaffee Construction—Mark Jones(mionesAevanschaffee.com) Building Official City of Vail -Christopher Jarecki(ciarecki(a vailgov.com) Casey Concrete—Shawn Vondette(svondettec ws-concrete.com) /Ijf Justin Orgill David A. Young, P.E. Field Technician Reviewed By