HomeMy WebLinkAbout2018-8630 DOUBLE TREE VAIL KITCHEN FINAL REPORT 4-12-18.pdf JEDI Balancing, Inc. 568 Briggs Street (physical) P.O. Box 525 (mail) Erie, CO. 80516 Phone (720) 839-5333 www.jedibalancing.com Certified Test, Adjust & Balance Report Project Double Tree Vail -Kitchen Address 2211 N Frontage Road Vail, CO 81657 Architect Unavailable Mechanical Engineer Unavailable Contractor RK Mechanical TABB Certified Supervisor Bryan A. Hund Date 4/12/2018 Job Number 2018-8630 Bryan A. Hund TABB Certified Supervisor TABB Firm Certification #BB009003C Stamp Expires 3/31/19 Warranty Information: The data presented in this report is a record of system measurements and final adjustments that have been obtained in accordance with the current edition of the TABB International Standards for Environmental Systems Balance. The measurements shown, and the information given, in this report are certified to be accurate and complete, at the time and date information was gathered. Any variances from design quantities, which exceed TABB tolerances, are noted in the TAB report project summary. This project has a one-year guarantee on all Testing, Adjusting & Balancing from the date listed on this cover page. Instrumentation: Instrument Manufacturer Model Serial Number Calibrated On Tachometer Shimpo MT-200 B168B5005P 10-04-2017 Air Temperature Meter Evergreen Telemetry RM-T-1 1700353 10-15-2017 Air Temperature Probe Evergreen Telemetry PR-T-1 1700353 10-15-2017 Immersion Temperature Probe Evergreen Telemetry PR-T-4-6 1700223 10-12-2017 Contact Temperature Probe Evergreen Telemetry PR-T-2 1700117 10-17-2017 Humidity Evergreen Telemetry S-H-3-5 1700296 10-17-2017 Volt-Amp Meter Flir CM-83 Z354881 10-12-2017 Rotating Vane Extech AM-300 Z354582 10-06-2017 Air Pressure TSI / Alnor EBT-731 EBT-731652014 03-15-2018 Air Velocity / Airfoil TSI / Alnor EBT-731 EBT-731652017 03-15-2018 Flowhood TSI / Alnor EBT-731 EBT-731652017 03-15-2018 Hydronic Pressure TSI HM-675 71646136 03-09-2018 Hydronic Differential Pressure TSI HM-675 71646136 03-09-2018 Abbreviation Index TAB: Testing, Adjusting & Balancing Cx: Commissioning AHU: Air Handling Unit Motor FLA: Full Load Amperage RTU: Roof Top Unit S.F.: Service Factor PACU: Packaged Air Conditioning Unit OD: Outside Diameter MAU: Make Up Air Unit P.F.: Power Factor FCU: Fan Coil Unit Nom. Eff.: Nominal Efficiency CRAC: Computer Room Air Conditioning Unit RPM: Revolutions per Minute VAV: Variable Air Volume T1: Terminal 1 K Factor: Correction Factor T2: Terminal 2 FPB: Fan Powered Box T3: Terminal 3 AK: Area Correction PSI: Pounds per Square Inch Design D.P.: Design Differential Pressure TDH: Total Dynamic Head Actual D.P.: Recorded Differential Pressure CS: Circuit Setter Ind.Imp.Dia. Indicated Impeller Diameter BV: Balance Valve CUH: Cabinet Unit Heater Valve D.P.: Discharge Pressure UH: Unit Heater Valve S.P.: Suction Pressure ERV: Energy Recovery Ventilator ERU: Energy Recovery Unit EF: Exhaust Fan PEF: Power Exhaust Fan KEF: Kitchen Exhaust Fan SF: Supply Fan RF: Return Fan TF: Transfer Fan Diff.: Differential SEF: Smoke Exhaust Fan SPF: Stairwell Pressurization Fan DX: Direct Expansion SACU: Spilt Air Conditioner Unit SP: Static Pressure TSP: Total Static Pressure in. wc: Inches Water Column ESP: External Static Pressure HW: Heating Water VP: Velocity Pressure CHW: Cooling Water SA: Supply Air CW: Condenser Water RA: Return Air HX: Heat Exchanger OSA: Outside Air SWD: Sidewall Diffuser OA: Outside Air EAT: Entering Air Temperature MA: Mixed Air LAT: Leaving Air Temperature SD: Supply Diffuser EWT: Entering Water Temperature CD: Ceiling Diffuser LWT: Leaving Water Temperature ER: Exhaust Register MVD: Manual Volume Damper RG: Return Grille OBD: Opposed Blade Damper CFM: Cubic Feet Per Minute NAC: No Access FPM: Feet Per Minute NG: Not Given SSD: Square Supply Diffuser NIC: Not in Contract SRD: Square Return Diffuser E: Existing TG: Transfer Grille cm: Centimeter l/s: Liters per Second M: Meter mm: Millimeter Pa: Pascal kPa: Kilopascal CMH: Cubic Meters per Hour Report Summary and Remarks SEE ALL FIELD NOTES LOCATED BELOW EQUIPMENT DATA JEDI Balancing, Inc. 568 Briggs Street (physical) P.O. Box 525 (mail) Erie, CO. 80516 Phone (720) 839-5333 www.jedibalancing.com Scope The Test, Adjust and Balance (TAB) scope of work consisted of 1 make up air unit (MAU), 1 roof top unit (RTU) 2 exhaust fans (EF). Procedures: Typical AHU / RTU POSTURING Submittals Submittals were not provided for the project. RTU and AHU - CONSTANT VOLUME The RTU’s have constant volume fans that were set for design airflow and the associated supply outlets and inlets were balanced in full cooling demand. After the distribution systems were complete, the outside air values were measured and set. The Outside Air CFM was directly measured. The Return Air CFM was derived from subtracting Outside Air CFM from Total Supply Air CFM. There was no access to the unit discharge to obtain a duct traverse. Total CFM was derived by the sum of the Outlet measurements. All final TAB settings and performance measurements were completed, and data was recorded on to the appropriate test report forms. The MAU’s has a constant volume fan that was tested and proportioned in full cooling demand. After proportion of system all final TAB settings and performance measurements were completed, and data was recorded on to the appropriate test report forms. Exhaust Fan Remarks EXHAUST FANS WITH GRILLES The exhaust fans were energized, measured and set for total airflow. The associated inlets were balanced as noted in this report. Total CFM was derived as noted on the individual test pages. Final settings and performance measurements were completed, and data recorded on to the appropriate test report forms. SCHEMATIC LINE DIAGRAMS Report includes reduced mechanical drawings used for the test and balance work. These “Keyed Drawing” were used in place of single line schematic diagrams and include the unique designations for the tested items in the final TAB report. Table Of ContentsPROJECT:LOCATION:DOUBLE TREE VAIL KITCHENVAIL, CO 2018-8630PROJECT #: DATE:CONTACT:4/12/2018Josh Cota Table Of Contents1 Project Summary......................................................................................................................................................1 2 Air Handling Unit......................................................................................................................................................2 2.1 MAU-01..............................................................................................................................................................2 2.2 MAU-01/SPP-01.................................................................................................................................................3 3 Roof Top Unit...........................................................................................................................................................4 3.1 RTU-A1 ..............................................................................................................................................................4 3.2 RTU-A1 /SPP-01................................................................................................................................................5 3.3 RTU-A1 /Duct-01................................................................................................................................................6 4 Fan Unit....................................................................................................................................................................8 4.1 EF-09 DISH........................................................................................................................................................8 4.2 KEF-01...............................................................................................................................................................9 JEDI Balancing, Inc. Project SummaryPROJECT:LOCATION:DOUBLE TREE VAIL KITCHENVAIL, CO 2018-8630PROJECT #: DATE:CONTACT:4/12/2018Josh Cota Test System / Unit Name Date Contact Notes / Comment Logs Air Handling Unit MAU-01 11-Apr-18 Bryan Hund KITCHEN -0.008" TO ADJOINING AREA. Fan Unit EF-09 DISH 11-Apr-18 Bryan Hund FAN WOULD NOT RUN WITH DISHWASHER INTERLOCK. USED TEMP POWER TO TEST AIRFLOW. Fan Unit KEF-01 11-Apr-18 Bryan Hund KITCHEN -0.008" TO ADJOINING AREA. JEDI Balancing, Inc.Page 1 of 9 Air Handling UnitPROJECT:LOCATION:DOUBLE TREE VAIL KITCHENVAIL, CO 2018-8630PROJECT #: DATE:CONTACT:4/12/2018Josh Cota Tested By:Bryan Hund Date:4/11/2018 SYSTEM/UNIT: MAU-01 Log:MAU-01 4/11/2018 Bryan Hund KITCHEN -0.008" TO ADJOINING AREA. Unit Data Unit Manufacturer CAPTIVEAIRE Unit Model Number A2D.500-20D Unit Serial Number 3136269 HMAU-1 Design Data Total CFM Design 3600 CFM Total Connected Design CFM 3600 CFM Outside Air CFM Design 3600 CFM Design TSP 0.29 in. wc Electrical Test Data MAU-01/Supply Fan Motor Volts 1 144 Motor Volts 2 145 Motor Volts 3 145 Motor Amps 1 3.7 Motor Amps 2 3.84 Motor Amps 3 3.71 Corrected FLA 0.01 Unitary MAU-01/Supply Fan Starter Model No.LENZE (VFD) Motor Data MAU-01/Supply Fan Motor Manufacturer TECO Motor HP 2 Motor RPM 1740 Motor Frame 145T Motor Type ASGH Motor Rated Volts 230/460 Motor Phase 3 Motor FL Amps 5.48/2.74 Motor Service Factor 1.15 Nominal Efficiency 86.5 Power Factor 84.0 Sheave Data MAU-01/Supply Fan Drive Type DIRECT DRIVE Final Data Total CFM Actual 3610 Outside Air CFM Actual 3610 OA Damper Pos 100 % Measured Data MAU-01/Supply Fan Fan RPM Actual DIRECT DRIVE Operating Hertz 40 Filter Data MAU-01/SF Filter Bank Filter Type OSA METAL TYPE Filter Quantity (set 1)3 Filter Size (set 1)23X19 JEDI Balancing, Inc.Page 2 of 9 Air Handling UnitPROJECT:LOCATION:DOUBLE TREE VAIL KITCHENVAIL, CO 2018-8630PROJECT #: DATE:CONTACT:4/12/2018Josh Cota Tested By:Bryan Hund Date:4/10/2018 SYSTEM/UNIT: MAU-01/SPP-01 Test Pressures Final Filter SP In ATMOSPHERE in. w.c. Final Filter SP Out -0.16 in. w.c. Heating Coil SP In -0.16 in. w.c. Heating Coil SP Out -0.27 in. w.c. Supply Fan SP In -0.27 in. w.c. Supply Fan SP Out 0.26 in. w.c. Static Pressure Profile System/Unit Area Served Outlet Type Size (in) Design Reading Prelim Reading Final Reading % Final Instrum ent Open Area (sq ft) Ak (sq ft) Final Vel FPM Outlet-01 SD 600 220 585 98 Flow Hood 1.000 1.000 585 Outlet-02 SD 600 155 610 102 Flow Hood 1.000 1.000 610 Outlet-03 SD 600 200 610 102 Flow Hood 1.000 1.000 610 Outlet-04 SD 600 145 590 98 Flow Hood 1.000 1.000 590 Outlet-05 SD 600 270 605 101 Flow Hood 1.000 1.000 605 Outlet-06 SD 600 220 610 102 Flow Hood 1.000 1.000 610 Totals:---3600 1210 3610 100 ---- MAU-01 Supply Outlet Summary JEDI Balancing, Inc.Page 3 of 9 Roof Top UnitPROJECT:LOCATION:DOUBLE TREE VAIL KITCHENVAIL, CO 2018-8630PROJECT #: DATE:CONTACT:4/12/2018Josh Cota Tested By:Bryan Hund Date:4/10/2018 SYSTEM/UNIT: RTU-A1 Unit Data Unit Manufacturer TEMPMASTER Unit Model Number ZWT15S30H2BCE11AA Unit Serial Number N1A8422377 Total CFM Design 4500 Design SP 0.75 in. wc Outside Air CFM Design 500 Total Connected CFM 4500 Test Data Total CFM Actual 4475 Outside Air CFM Actual 525 Return Air CFM Actual 3950 Electrical Test Data RTU-A1 /Supply Fan Motor Volts 1 214 Motor Volts 2 214 Motor Volts 3 212 Motor Amps 1 9.94 Motor Amps 2 10.1 Motor Amps 3 9.8 Corrected FLA -1.89 Unitary RTU-A1 /Supply Fan Starter Model No.BUILT IN Motor Data RTU-A1 /Supply Fan Motor Manufacturer BALDOR Motor HP 5 Motor RPM 1750 Motor Frame 184T Motor Type N/G Motor Rated Volts 208-230/460 Motor Phase 3 Motor FL Amps 13.5-13/6.5 Motor Service Factor 1.15 Nominal Efficiency 89.5 Power Factor 80.0 Sheave Data RTU-A1 /Supply Fan Drive Type BELT Motor Sheave Make BROWNING Motor Sheave Model / Size VP65 in. Motor Sheave Bore 1 1/8 in. Fan Sheave Make BROWNING Fan Sheave Model / Size BK110 in. Fan Sheave Bore 1 in. Sheave Center Line 31 in. Number of Belts 1 Belt Make BROWNING Belt Size BX83 Measured Data RTU-A1 /Supply Fan Fan RPM Actual 972 Test Pressures OA Damper Position 15 % Filter Data RTU-A1 /Filter Bank Filter Type FIBER Filter Quantity (set 1)6 Filter Size (set 1)12X24X2 JEDI Balancing, Inc.Page 4 of 9 Roof Top UnitPROJECT:LOCATION:DOUBLE TREE VAIL KITCHENVAIL, CO 2018-8630PROJECT #: DATE:CONTACT:4/12/2018Josh Cota Tested By:Bryan Hund Date:4/10/2018 SYSTEM/UNIT: RTU-A1 /SPP-01 Test Pressures Cooling Coil SP In -0.34 in. w.c. Cooling Coil SP Out -0.53 in. w.c. Final Filter SP In -0.23 in. w.c. Final Filter SP Out -0.34 in. w.c. Heating Coil SP In NAC in. w.c. Heating Coil SP Out 0.26 in. w.c. Supply Fan SP In -0.53 in. w.c. Supply Fan SP Out NAC in. w.c. Static Pressure Profile JEDI Balancing, Inc.Page 5 of 9 Roof Top UnitPROJECT:LOCATION:DOUBLE TREE VAIL KITCHENVAIL, CO 2018-8630PROJECT #: DATE:CONTACT:4/12/2018Josh Cota Tested By:Bryan Hund Date:4/10/2018 SYSTEM/UNIT: RTU-A1 /Duct-01 Traverse Data Points Unit Data Traverse Location OSA INTAKE Type of Traverse RECTANGULAR Outer Height 50 in. Outer Width 45 in. Air Flow Area (Ak)15.6 sq. ft. Number Of Rows 5 Readings Per Row 3 Total Readings 15 Final Data Design Total Flow 500 CFM Actual Total Flow 525 CFM Average Reading 34 FPM Sum of Readings 506.00 FPM Instrument Used ADM Probe VELGRID JEDI Balancing, Inc.Page 6 of 9 Roof Top UnitPROJECT:LOCATION:DOUBLE TREE VAIL KITCHENVAIL, CO 2018-8630PROJECT #: DATE:CONTACT:4/12/2018Josh Cota System/Unit Area Served Outlet Type Size (in) Design Reading Prelim Reading Final Reading % Final Instrum ent Open Area (sq ft) Ak (sq ft) Final Vel FPM Outlet-01 SD 800 770 780 98 Flow Hood 1.000 1.000 780 Outlet-02 SD 800 650 820 103 Flow Hood 1.000 1.000 820 Outlet-03 SD 800 960 810 101 Flow Hood 1.000 1.000 810 Outlet-04 SD 800 870 790 99 Flow Hood 1.000 1.000 790 Outlet-05 SD 500 100 485 97 Flow Hood 1.000 1.000 485 Outlet-06 SD 800 230 790 99 Flow Hood 1.000 1.000 790 Totals:---4500 3580 4475 99 ---- RTU-A1 Supply Outlet Summary JEDI Balancing, Inc.Page 7 of 9 Fan UnitPROJECT:LOCATION:DOUBLE TREE VAIL KITCHENVAIL, CO 2018-8630PROJECT #: DATE:CONTACT:4/12/2018Josh Cota Tested By:Bryan Hund Date:4/11/2018 SYSTEM/UNIT: EF-09 DISH Log:EF-09 DISH 4/11/2018 Bryan Hund FAN WOULD NOT RUN WITH DISHWASHER INTERLOCK. USED TEMP POWER TO TEST AIRFLOW. Unit Data Fan Manufacturer TWIN CITY Fan Model Number BCRU110B Fan Serial Number L17-000000238189 Starter Data Starter Manufacturer NONE Design Data Total CFM Design 400 Total Connected Design CFM 400 Design TSP 0.25 in. wc Electrical Test Data Motor Volts 1 Actual 122 Motor Amps 1 Actual 3.71 Corrected FLA 0.01 Motor Data Motor Manufacturer US MOTOR Motor HP 1/4 Motor RPM 1725 Motor Frame 48Y Motor Type TEFC Motor Rated Volts 115/230 Motor Phase 1 Motor FL Amps 5.3/2.7 Motor Service Factor 1.15 Nominal Efficiency N/G % Power Factor N/G Sheave Data Drive Type BELT Motor Sheave Make BROWNING Motor Sheave Model / Size VL40 in. Motor Sheave Bore 5/8 in. Fan Sheave Make BROWNING Fan Sheave Model / Size AK59 Fan Sheave Bore 3/4 in. Sheave Center Line 5.5 IDLER PULLEY in. Number of Belts 1 Belt Make BROWNING Belt Size 3L280 in. Final Data Total Fan CFM Actual 415 Measured Data Fan RPM Actual 1211 Test Pressures Fan SP In Actual -0.11 in. wc Fan SP Out Actual ATMOSPHERE in. wc System/Unit Area Serve d Outlet Type Size (in) Design Reading Prelim Reading Final Reading % Final Instruments Open Area (sq ft) Ak (sq ft) Final Vel FPM Inlet-01 TOTAL 400 360 415 104 Flow Hood 1.000 1.000 415 Totals:---400 360 415 104 ---- EF-09 DISH Exhaust Inlet Summary JEDI Balancing, Inc.Page 8 of 9 Fan UnitPROJECT:LOCATION:DOUBLE TREE VAIL KITCHENVAIL, CO 2018-8630PROJECT #: DATE:CONTACT:4/12/2018Josh Cota Tested By:Bryan Hund Date:4/11/2018 SYSTEM/UNIT: KEF-01 Log:KEF-01 4/11/2018 Bryan Hund KITCHEN -0.008" TO ADJOINING AREA. Unit Data Fan Manufacturer CAPTIVEAIRE Fan Model Number USB124DD-RM Fan Serial Number 3136269 EF-1 Starter Data Starter Manufacturer LENZE (VFD) Design Data Total CFM Design 4500 Total Connected Design CFM 4500 Design TSP 1.5 in. wc Electrical Test Data Motor Volts 1 Actual 180 Motor Volts 2 Actual 177 Motor Volts 3 Actual 177 Motor Amps 1 Actual 6.2 Motor Amps 2 Actual 6.34 Motor Amps 3 Actual 6.3 Corrected FLA 0.01 Motor Data Motor Manufacturer TECO Motor HP 3 Motor RPM 1175 Motor Frame 213T Motor Type ASGH Motor Rated Volts 230/460 Motor Phase 3 Motor FL Amps 9.2/4.6 Motor Service Factor 1.15 Nominal Efficiency 88.5 % Power Factor 86.5 Sheave Data Drive Type DIRECT DRIVE Final Data Total Fan CFM Actual 4745 Measured Data Fan RPM Actual DIRECT DRIVE Operating Hertz 49 Test Pressures Fan SP In Actual -0.89 in. wc Fan SP Out Actual ATMOSPHERE in. wc System/Unit Area Serve d Outlet Type Size (in) Design Reading Prelim Reading Final Reading % Final Instruments Open Area (sq ft) Ak (sq ft) Final Vel FPM Inlet-01 ER 2250 555 2345 104 Flow Hood 1.000 1.000 2345 Inlet-02 ER 2250 610 2400 107 Flow Hood 1.000 1.000 2400 Totals:---4500 1165 4745 105 ---- KEF-01 Exhaust Inlet Summary JEDI Balancing, Inc.Page 9 of 9 ELASTOMERIC RUBBER IN SHEAR VIBRATION ISOLATORS (TYP. 4) AIR HANDLER HANGER RODS SECURED TO STRUCTURE HOT WATER PIPING TO BOILER. FLEX CONNECTION RETURN AIR 1-1/2" DEEP 18 GAUGE GALVANIZED AUXILIARY DRAIN PAN SUSPENDED BELOW UNIT. SUPPLY AIR FLEXIBLE P-TRAP CONNECTION DISCHARGE TO PLUMBING DRAIN FILTERSREFRIGERANT PIPING TO CONDENSING UNITS. HOT WATER COIL PACKAGED ROOFTOP UNIT SCHEDULE UNIT TAG LOCATION SERVICE TO SUPPLY FAN DATA DX COOLING COIL DATA @ 90°F AMBIENT FLOWRATE STATIC PRES. MOTOR DATA MAX. (CFM) MIN. (CFM) OA MIN. (CFM) EXT./ TOTAL (IN. H20)QUAN. HP RPM VOLT PH VFD FLOWRATE (CFM) EAT LAT TOTAL COOLING (MBH)SENSIBLE (MBH) EER (ARI) MAX. dP (FT. H2O)(°F DB) (°F WB) (°F DB) (°F WB) MAU-1 ROOF 151 KITCHEN 3600 2000 100% 0.29 / 0.96 1 2 1480 208 3 YES N/A N/A N/A N/A N/A N/A N/A N/A N/A RTU-A1 ROOF 151 KITCHEN 4500 2250 500 0.75 / 1.46 1 5 830 208 3 YES 4500 87.1 58.1 52.5 43.2 168.4 168.4 13.4 0.1 PACKAGED ROOFTOP UNIT SCHEDULE (CONTINUED) NATURAL GAS HEAT DATA FILTER DATA ELECTRICAL DATA SELECTION BASED ON REMARKS MANUFACTURER MODELINPUT (MBH) OUTPUT (MBH)STAGES FLOW RATE (CFM) EAT ( º F) LAT ( º F)UNIT FILTER (MERV)VOLT PH MCA MOP DISCONNECT PROVIDED BY 312 287 5 3600 1 75 7 208 3 11 15 YES DIV. 23 CAPTIVAIRE A2-D.500-20D 3 300 240 2 4500 53 105 7 208 3 80.1 90 YES DIV. 23 TEMPMASTER ZWT15S30 1, 2 GENERAL NOTES: 1) PROVIDE 4 STAGE COMPRESSOR, ASHRAE 90.1 COMPLIANT MULTISPEED FAN CONTROLLER (INTELLISPEED), HIGH ALTITUDE STAINLESS STEEL 2 STAGE NATURAL GAS BURNER, 24" CURB. 2)PROVIDE LOW AMBIENT COOLING DOWN TO 0°F AND ECONOMIZER WITH BAROMETRIC RELIEF AND FULLY MODULATING OUTDOOR AIR CONTROL. 3)PROVIDE KITCHEN DEMAND CONTROL SYSTEM TO VARY AIRFLOW BASED ON KITCHEN LOAD, LOW FIRE START CAPABILITY WITH 30:1 TURNDOWN, AND MOTORIZED BACKDRAFT DAMPER. FAN SCHEDULE UNIT TAG LOCATION SERVICE TO FLOWRATE (CFM) STATIC PRES. TOTAL (IN. H20) TYPE DRIVE FAN RPM SONES MOTOR DATA SELECTION BASED ON REMARKS WATTS HP VOLT PH VFD STARTER/ DISCONNECT FURNISHED BY MANUFACTURER MODEL EF-5 ABOVE CEILING 136/137 LOCKER, 138/139 RR'S 760 0.25 INLINE CENTRIFUGAL DIRECT 810 3.7 306 --- 120 1 NO YES DIV. 23 TWIN CITY FAN T900L 2, 3, 4, 5 EF-6 ABOVE CEILING 149/150 RESTROOMS 900 0.25 INLINE CENTRIFUGAL DIRECT 1055 8.6 468 --- 120 1 NO YES DIV. 23 TWIN CITY FAN T1500L 2,3 ,4, 5 EF-7 ROOF GENERAL PRESSURE RELIEF 1335 0.125 CENTRIFUGAL DOWNBLAST DIRECT 700 5.2 93 --- 120 1 NO YES DIV. 23 TWIN CITY FAN 150B DCRD 1, 2, 3, 5 EF-8 ROOF ECONOMIZER PRESSURE RELIEF 5080 0.125 CENTRIFUGAL DOWNBLAST BELT 550 9.7 373 --- 120 1 NO YES DIV. 23 TWIN CITY FAN 240D BCRD 1, 2, 3 EF-9 ROOF DISHWASHER HOOD 400 0.25 CENTRIFUGAL UPBLAST BELT 1249 8.5 --- 1/4 208 1 NO YES DIV. 23 PENNBARRY FX08B 2, 3, 5, 7 KEF-1 ROOF KITCHEN EXHAUST HOOD 4500 1.5 UTILITY SET DIRECT 1066 22 --- 3 208 3 YES --- DIV. 23 CAPTIVEAIRE USBI24DD-RM 2, 6 GENERAL NOTES: 1)PROVIDE ROOF CURB 2)PROVIDE DISCONNECT SWITCH 3)PROVIDE BACKDRAFT DAMPER 4)PROVIDE VIBRATION DAMPENING HANGERS 5)PROVIDE UNIT-MOUNT SOLID STATE SPEED CONTROL 6) PROVIDE KITCHEN RATED EXHAUST CURB (MIN. 40" FROM COMBUSTIBLES), GREASE COLLECTOR, KITCHEN DEMAND CONTROL SYSTEM AND VFD, AND UL 762 CONSTRUCTION AND LABEL 7)PROVIDE MIN. 30" TALL ROOF CURB MECHANICAL DUCTWORK AND PIPE INSULATION SCHEDULE INSULATION ITEMS SYSTEM LOCATION MATERIAL THICK REMARKS -NESS DUCTWORK:DW - DUCTWRAP; FE - FLEXIBLE ELASTOMERIC SUPPLY AIR DUCT ALL INDOOR DW OR FE 2" RETURN AIR DUCT ALL INDOOR DW OR FE 2" HOT WATER SUPPLY AND RETURN PIPING ALL INDOOR FE 1-1/2" AC CONDENSATE ALL INDOOR FE 1" REFRIGERANT SUCTION AND HOT GAS PIPING AND TUBING ALL OUTDOOR FE 2" NOTES: 1. REFER TO PROJECT SPECIFICATION AND/OR SPECIFICATION NOTES ON DRAWINGS FOR PRODUCT MATERIAL INFORMATION, AND INSTALLATION REQUIREMENTS. 2. PAINT INSULATION WITH 2 COATS OF MANUFACTURER'S RECOMMENDED PROTECTIVE COATING. REFRIGERANT SUCTION AND HOT GAS PIPING AND TUBING ALL INDOOR FE 1" SEE NOTE 2 SEE NOTE 2 D1 D2 STAINLESS STEEL ROUND SPIRAL DUCT EXTERNAL DUCT JACKETDUCT INSULATION D2 END VIEW SIDE VIEW D1: DUCT DIAMETER AS INDICATED ON PLANS D2: OVERALL DIMENSION INCLUDING DUCT INSULATION AND EXTERIOR DUCT JACKET NOTE: REFER TO DIVISION 23 SPECIFICATIONS "METAL DUCTS" AND "DUCT INSULATION" FOR REQUIRED FIRE RATING AND INSULATION DESIGN. BASIS OF DESIGN IS SELKIRK "ZERO CLEARANCE" GREASE DUCT. 1 A23456ABCDE 134562 COPYRIGHT 2016 BASKERVILL. USE OF THIS WORK IN WHOLE OR IN PART IS FORBIDDEN WITHOUT EXPRESSED WRITTEN CONSENT.BCDEDRAWING NO. P.O. BOX 400, RICHMOND, VA 23218-0400 DRAWING TITLE ISSUE PROJECT OWNER ®9/19/2017 4:50:17 AMDETAILS AND SCHEDULES THE WIDEWATERS GROUP 2.160036.0 DOUBLETREE VAIL, CO CONVERSION GUESTROOMS & PUBLIC SPACES RENOVATION 08/25/16 - CONSTRUCTION DOCUMENTS M002 2211 N FRONTAGE RD, VAIL, COLORADO 81657 NOT TO SCALE3AINSULATION SCHEDULE NOT TO SCALE3BAIR HANDLER HANGER DETAIL 1 8/25/2016 FOR CONSTRUCTION SET 10 9/15/17 CCD-06 SCALE: 12" = 1'-0"3C KITCHEN EXHAUST DUCT DETAIL 09/07/2017201709/0 T T T TT T MEETING ROOM 127 BOARDROOM 126 POOL EQUIP 145 MECHANICAL 146 OFFICE 4 129 ELECTRICAL 116 FITNESS CENTER 148 SKI & BOOT STORAGE 111 WORK AREA 108 DISHWASHING 106 BALLROOM/ MEETING ROOM 104 LUGGAGE ROOM 118 ROOM 122 ROOM 121 ROOM 120 MASSAGE/ SPA WAITING 119 ROOM 123 CORRIDOR 119B ROOM 124 ENGINEER 133 ENGINEER STORAGE 134 STORAGE 135 EMPLOYEE BREAK ROOM 136 RECEPTION 128 LOBBY LOUNGE WITH CONNECTIVITY ZONE 102 VESTIBULE 101 SKI BOOT REMOVAL AREA 110 OFFICE 3 130 OFFICE 1 132 MADE MARKET 105 KITCHEN 151 LOBBY BAR 103 CHECK-IN 107 EXIT PASSAGE 112 EXIT PASSAGE 114 ELEVATOR EQUIP 113 TELECOM ROOM 117 M EMPLOYEE LOCKER ROOM 138 WOMEN'S BATHROOM 139 MEN'S BATHROOM 141 GUEST LAUNDRY 147 MEN'S 149 WOMEN'S 150 CORRIDOR 140 PREFUNCTION 152 MEETING STORAGE 153 W EMPLOYEE LOCKER ROOM 137 23.223.11 23.11 23.11 23.11 23.11 23.11 23.11 M202 5A S-1 10" DIA. 105-24 38'-0" (TOTAL PER SIDE) 24'-0" (ACTIVE PER SIDE) PROVIDE MITERED CORNERS. LOCATE REMOTE CABLE DAMPER IN RECESSED CEILING. ENGINEERED 2-1/2" HIGH SLOT RETURN IN VERTICAL FACE OF RECESSED CEILING. SEE ARCHITECTURAL PLANS FOR DETAIL. 16 SQ. FT FREE AREA. EXISTING ROOFTOP UNIT RTU-2 TO PROVIDE: 120 MBH HEATING 7.5 TONS COOLING 2850 CFM SUPPLY AIR 750 CFM OUTSIDE AIR EXISTING ROOFTOP UNIT RTU-1 TO PROVIDE: 120 MBH HEATING 5 TONS COOLING 2000 CFM SUPPLY AIR 390 CFM OUTSIDE AIR EXISTING AIR HANDLING UNIT AHU-3 TO PROVIDE: 50 MBH HEATING 1480 CFM SUPPLY AIR MIN. 400 CFM OUTSIDE AIR32x128ø10ø8ø18x12 12x12 10ø 8ø 6ø 8ø 8ø 8ø 24x16 8ø 8ø 8ø 8ø 24x14 8ø12x12 30x16 8ø 8ø8ø8ø8ø8ø 8ø8ø 8ø 8ø10x126ø 6ø 6ø 6ø 6ø 6ø6ø 8ø24x8 18x12 12x12 12x12 24x1416x10 8ø 8ø 8ø 30x18 8ø S-2 230 CFM 8ø S-2 100 CFM (TYP. OF 2) 8ø S-2 95 CFM 8ø S-2 85 CFM 8ø S-2 125 CFM 8ø S-2 125 CFM 4'-0" S-1 90 CFM 4'-0" S-1 90 CFM E-1 450 CFM 8ø S-2 130 CFM 4'-0" S-1 70 CFM 4'-0" S-1 70 CFM 8ø S-2 200 CFM 8ø S-2 200 CFM 8ø S-2 200 CFM 6ø S-2 90 CFM 6ø S-2 80 CFM 6ø S-2 80 CFM 6ø S-2 60 CFM 6ø S-2 60 CFM 6ø S-2 60 CFM 8ø S-2 160 CFM S-2 250 CFM S-2 250 CFM 8ø S-2 185 CFM 8ø S-2 190 CFM 8ø S-2 190 CFM 8ø S-2 190 CFM 6ø S-2 65 CFM 6ø S-2 65 CFM 8ø S-2 170 CFM 6ø S-2 65 CFM 8ø S-2 170 CFM 10x6 S-4 190 CFM 8x6 S-4 80 CFM 6ø S-2 90 CFM 6ø S-2 95 CFM 6ø S-2 95 CFM 6ø S-2 95 CFM EF-6 CU-1 CU-2 VAV-3 VAV-2 VAV-4 VAV-8 VAV-1 VAV-7 E-1 1255 CFM R-2 R-1 R-1 R-2 R-2 R-2R-2 R-1 R-2 R-2 R-2 R-2 R-2 R-1 R-1 R-1 R-1 R-1 R-1 R-1 6ø8x6 S-4 150 CFM PROVIDE INTEGRAL FLUE FAN AT FIREPLACE. PROVIDE POSITIVE PRESSURE DUCT INTO ENCLOSURE AND PROVIDE FLUE GAP AT THE TOP EWH-1 SEE SHEET M202 FOR DUCTWORK ABOVE LOBBY CEILING VAV-8 VAV-3 12x10 6ø6ø 8ø 14x128ø 8ø 8ø 10ø10x1210ø 12x6 23.13 8x612x8 6ø6ø 6ø 6ø23.156ø6ø6ø12x108x86ø6ø 6ø6ø S-2 80 CFM 8ø S-2 175 CFM 6ø S-2 40 CFM6ø VAV-4 VAV-7 VAV-5 6x6 S-4 40 CFM10x6 8x46x6 23.11 23.17 M202 5D SEE SHEET M202 FOR DUCTWORK ABOVE BATHROOM CEILINGS 20x8 30x10 22x22 36x10 16x88x612x108ø 8ø 18x10 10x10 8ø 6x68ø6ø 20x8 20x8 R-2R-2 R-2 18x1234x20R-1 R-1R-1 R-1 COVER DUCT INLET WITH 1"x1" WIRE MESH 6ø S-2 65 CFM R-2 8ø 8ø8ø8ø8ø8ø8ø8ø 8x1023.22 T AHU-1 T RTU-1 TAHU-2 T RTU-2 T AHU-3 PROVIDE MARKEL MODEL F1FUH03003 (OR EQUAL) 3.3 KW UNIT HEATER. MOUNT UNIT AS HIGH AS POSSIBLE ON WALL. MAINTAIN MANUFACTURER REQUIRED CLEARANCE DISTANCES. DIVISION 23 TO PROVIDE ELECTRICAL DISCONNECT, ADJUSTABLE WALL BRACKET, AND BUILT IN THERMOSTAT. EWH-2 RETAIL 109 VESTIBULE 143 PROVIDE 9 MBH PACKAGED TERMINAL HEAT PUMP WITH 2.5 KW ELECTRIC HEATER. BASIS OF DESIGN IS AMANA DIGIAIRE PMH093G. BALANCE TO 30 CFM OF FRESH AIR. PROVIDE WALL SLEEVE AND INTERNAL THERMOSTAT. DISCHARGE CONDENSATE TO SPLASH BLOCK ON GRADE. M203 4A SEE SHEET M203 FOR KITCHEN LAYOUT 18x18 R-1 1 A23456ABCDE 134562 COPYRIGHT 2016 BASKERVILL. USE OF THIS WORK IN WHOLE OR IN PART IS FORBIDDEN WITHOUT EXPRESSED WRITTEN CONSENT.BCDEDRAWING NO. P.O. BOX 400, RICHMOND, VA 23218-0400 DRAWING TITLE ISSUE PROJECT OWNER ®9/19/2017 4:50:34 AM1ST FLOOR DUCTWORK PLAN THE WIDEWATERS GROUP 2.160036.0 DOUBLETREE VAIL, CO CONVERSION GUESTROOMS & PUBLIC SPACES RENOVATION 08/25/16 - CONSTRUCTION DOCUMENTS M201 2211 N FRONTAGE RD, VAIL, COLORADO 81657 SCALE: 1/8" = 1'-0" DRAWING REF: E401a6A1ST FLOOR EQUIPMENT AND DUCTWORK PLAN KEY NOTES 23.2 EQUIPMENT IN MECHANICAL ROOM TO REMAIN. KEEP EXISTING DUCTWORK, PIPING, AND CONTROLS IN PLACE EXCEPT WHERE OTHERWISE NOTED. 23.11 UNDERCUT DOOR FOR 100 CFM 23.13 4" DIA. DRYER EXHAUST DUCT UP TO ROOF (TYP. OF 3). INSTALL CLOTHES DRYERS AND DRYER EXHAUST DUCT PER IMC 2012 SECTION 913 AND SECTION 504. 23.15 PROVIDE NEW 42" X 12" LOUVER. COORDINATE COLOR AND STYLE WITH ARCHITECT. MINIMUM 50% FREE AREA. 23.17 PROVIDE 12X12 IN DOOR GRILLE WITH MINIMUM 40% FREE AREA. 23.22 COORDINATE WALL HEATER LOCATION WITH ARCHITECT. 1. MAIN DUCT RUNS SHOWN TO INDICATE GENERAL ROUTING. INSTALL TIGHT TO STRUCTURE ABOVE TO ALLOW MAXIMUM CLEARANCE BELOW. COORDINATE EXACT INSTALLATION HEIGHT WITH ALL OTHER TRADES. 2. BRANCH DUCT RUNS SHALL BE AS NOTED.EACH BRANCH DUCT SHALL BE PROVIDED WITH A MANUAL BALANCING DAMPER. 3. INSTALL THERMOSTATS AT 48" A.F.F. MEASURED TO THE TOP OF THE THERMOSTAT. 4. FIRE DAMPERS SHALL BE INSTALLED IN DUCTS PENETRATING RATED WALLS IN LOCATIONS SHOWN WITH MEANS TO ACCESS THEM, BY AN ACCESS DOOR OR 12" REMOVABLE SECTION OF DUCT. 5. PROVIDE REMOTE CABLE DAMPERS FOR DUCTWORK LOCATED IN INACCESSIBLE AREAS. 6. INSTALL VAV BOXES SUCH THAT 30" CLEARANCE IS MAINTAINED FOR ACCESS TO LOW VOLTAGE CONTROL PANELS. GENERAL DUCTWORK NOTES NOT IN SCOPE OF NEW CONSTRUCTION 1 8/25/2016 FOR CONSTRUCTION SET 5 12/07/2016 RFI #55 6 1/09/2017 CCD-03 9 7/21/17 CCD-05 10 9/15/17 CCD-0609/07/2017201709/0 KITCHEN KITCHEN AIR BALANCE OUTSIDE AIR (CFM) EXHAUST AIR (CFM) MAKEUP AIR FROM PUBLIC SPACE (CFM) BOTH HOODS ACTIVE 4100 -5100 1000 30x2234x20 18x12 12ø S-5 800 CFM (TYP. OF 4) 12ø S-5 800 CFM 22x46 R-3 4000 CFM24x2024x12 24x12 24x12 24x12 24x12 24x12 20x14 3D M203 23.25 36x2218X12 EXHAUST DUCT UP TO EF-7 ON LOW ROOF. 24X24 EXHAUST DUCT UP TO EF-8 ON LOW ROOF. 24X20 MAKEUP AIR DUCT UP TO MAU-1 ON LOW ROOF. 36X22 SUPPLY AIR DUCT UP TO RTU-A1 ON LOW ROOF. 23.26 36X34 RETURN AIR DUCT UP TO RTU-A1 ON LOW ROOF. 14x6 14x6 EXHAUST DUCT UP TO EF-9 ON LOW ROOF. T MAU-1 23.29 PROVIDE SMOKE DETECTOR IN RTU-A1 RETURN DUCT. 18x18 AIR TRANSFER DUCT 18X18 R-1 (TYP. OF 2) 12ø S-5 500 CFM 20x3046x22 10ø 23.28 T RTU-A1 24x24 23.26 23.26 23.26 KEF-1 16ø 16ø22ø23.30 23.31 1 A23456ABCDE 134562 COPYRIGHT 2016 BASKERVILL. USE OF THIS WORK IN WHOLE OR IN PART IS FORBIDDEN WITHOUT EXPRESSED WRITTEN CONSENT.BCDEDRAWING NO. P.O. BOX 400, RICHMOND, VA 23218-0400 DRAWING TITLE ISSUE PROJECT OWNER ®9/19/2017 4:50:46 AMKITCHEN DUCTWORK PLAN THE WIDEWATERS GROUP 2.160036.0 DOUBLETREE VAIL, CO CONVERSION GUESTROOMS & PUBLIC SPACES RENOVATION 08/25/16 - CONSTRUCTION DOCUMENTS M203 2211 N FRONTAGE RD, VAIL, COLORADO 81657 10 9/15/17 CCD-06 SCALE: 1/2" = 1'-0" DRAWING REF: M2014A1ST FLOOR KITCHEN PLAN KEY NOTES 23.25 SUPPLY AIR CONNECTIONS TO HOOD. PROVIDE VOLUME DAMPERS IN VERTICAL DROP TO HOOD. BALANCE TO 600 CFM (TYP. OF 6). PROVIDE NONCOMBUSTIBLE INSULATION WITHIN 18 INCHES OF HOOD PER SECTION 506.3.1.2 OF THE IMC. COORDINATE EXACT HOOD CONNECTION SIZES AND LOCATIONS WITH HOOD MANUFACTURER. 23.26 21 X 10 TYPE 1 GREASE HOOD EXHAUST DUCT. COMPLY WITH ALL REQUIREMENTS IN SECTION 506 OF THE IMC. SLOPE ALL DUCT BACK TO HOOD AT A MINIMUM OF 1/4" PER FOOT. PROVIDE "ZERO CLEAR" TYPE DUCT PER DETAIL 3C ON SHEET M002. 23.28 TYPE 2 DISHWASHER EXHAUST HOOD. COORDINATE ACTUAL CONNECTION SIZE AND LOCATION WITH HOOD MANUFACTURER. 23.29 MOUNT MAU-1 HMI TO HOOD. PROVIDE TEMPERATURE SENSORS IN EACH EXHAUST RISER FOR KEF-1 AND KEF-2. LOCATE ROOM TEMPERATURE SENSORS ADJACENT TO THE THERMOSTAT FOR RTU-A1. 23.30 PROVIDE GREASE DUCT CLEANOUTS PER ECTION 506.3.8 AND 506.3.9 OF THE IMC. 23.31 DIRECT KEF-1 DISCHARGE AWAY FROM BUILDING. MAINTAIN MIN. 5'-0" CLEARANCE BETWEEN FAN DISCHARGE AND WALL. SCALE: 1/2" = 1'-0" DRAWING REF: M2033DKITCHEN EXHAUST DUCT SECTION 09/07/2017201709/0 600 CFM TYP. 6 KEF-01 MAU-01 RTU-A1 1 2 3 4 5 6 1 2 1 2 34 5 6 EF-09 DISH 1 TTK3 206 KAL 204 KAR 203 K2 202 QQ1L 205 QQ1R 207 K1L 208 LAUNDRY 200 CORRIDOR 240 JANITOR 200B KSR 201 23.8 6ø CU-5 EF-8 EF-7 LIQUID REFRIGERANT LINE DOWN SUCTION REFRIGERANT LINE DOWN MAU-1 KEF-1 RTU-A1 23.27 23.27 EF-9 23.2723.32 23.27 18x4 S-3 240 CFM (TYP. OF 4) 18x4 S-3 200 CFM (TYP. OF 10) 12x612x6 10x8 10x8 16x12 16x12 336" x 4" S-3 BAR DIFFUSER WITH PREMIUM FINISH AS SELECTED BY ARCHITECT. TEN ACTIVE SECTIONS, EACH 18" LONG EXISTING AIR HANDLER AHU-2 TO PROVIDE: 120 MBH HEATING 5 TONS COOLING 2000 CFM SUPPLY AIR 430 CFM OUTSIDE AIR EXISTING AIR HANDLER AHU-1 TO PROVIDE: 120 MBH HEATING 5 TONS COOLING 2010 CFM SUPPLY AIR 430 CFM OUTSIDE AIR CONNECT OA DUCT TO EXISTING INTAKES ON LOW ROOF (TYP. OF 2). CONTRACTOR TO CONFIRM EXISTING LOUVERS HAVE MINIMUM OF 0.75 SQFT OF FREE AREA. 8ø S-1 100 CFM 8ø S-1 100 CFM 4'-0" S-1 100 CFM 4'-0" S-1 100 CFM 4'-0"S-1 100 CFM 4'-0" S-1 100 CFM 8ø S-2 200 CFM 8ø S-2 200 CFM 8ø S-2 200 CFM 8ø S-2 200 CFM8ø S-2 200 CFM 8ø S-2 200 CFM R-1 785 CFM LOBBY LOUNGE WITH CONNECTIVITY ZONE 102 VESTIBULE 101SKI BOOT REMOVAL AREA 110 8ø S-2 200 CFM 16x128ø 8ø8ø10x88ø 8ø 8ø8ø18x2024x14 24x14 12x10 12x10 6ø 6ø8x88ø 14x14 8ø 8ø 18x418x418x423.16 23.16 45 DEGREE ELBOWS 18x418x418x418x418x418x418x418x418x418x4 18x4 255" x 4" S-3 BAR DIFFUSER WITH PREMIUM FINISH AS SELECTED BY ARCHITECT. FOUR ACTIVE SECTIONS, EACH 18" LONG 18x12SEE SHEET A401d IN ARCHITECTURAL PLANS 4'-0" S-1 105 CFM 4'-0" S-1 105 CFM (TYP. OF 2) 4'-0" S-1 105 CFM 8x4 E-1 95 CFM TYP. OF 4 10x6 E-1 95 CFM TYP. OF 4 EF-5 8ø S-2 170 CFM AHU-5, DISCHARGE CONDENSATE TO FLOOR DRAIN IN MECAHNICAL ROOM 10x6 6x66x6 20x1220x8 10x8 6x66x66x610x6 12x106x6 6x66x10 12x88x10 10x10 6ø14x10 14x1010ø8ø 8ø 6x6 8ø32x12VAV-9 VAV-6 24x30 24x32 MOTORIZED DAMPERS FOR ECONOMIZER FUNCTIONALITY. SEE CONTROLS NARRATIVE. 23.14 M EMPLOYEE LOCKER ROOM 138 W EMPLOYEE LOCKER ROOM 137 WOMEN'S BATHROOM 139 MEN'S BATHROOM 141 90.00° VAV-9 VAV-6 23.19 23.18 8ø8ø8ø6x108ø6x88ø 8ø4'-0" S-1 105 CFM 8ø VAV-5 10x6 10ø 1 A23456ABCDE 134562 COPYRIGHT 2016 BASKERVILL. USE OF THIS WORK IN WHOLE OR IN PART IS FORBIDDEN WITHOUT EXPRESSED WRITTEN CONSENT.BCDEDRAWING NO. P.O. BOX 400, RICHMOND, VA 23218-0400 DRAWING TITLE ISSUE PROJECT OWNER ®9/19/2017 4:50:41 AM1ST FLOOR LOBBY, BATHROOM, AND 2ND FLOOR DUCTWORK PLAN THE WIDEWATERS GROUP 2.160036.0 DOUBLETREE VAIL, CO CONVERSION GUESTROOMS & PUBLIC SPACES RENOVATION 08/25/16 - CONSTRUCTION DOCUMENTS M202 2211 N FRONTAGE RD, VAIL, COLORADO 81657 SCALE: 1/8" = 1'-0" DRAWING REF: E401a2A2ND FLOOR EQUIPMENT AND DUCTWORK PLAN KEYNOTESGENERAL NOTES 1. REPLACE ALL PTAC UNITS IN GUEST ROOMS (SECOND, THIRD, AND FOURTH FLOORS) WITH EQUIVALENT PTAC UNITS. THE NEW PTAC UNITS MUST SUPPLY 50 CFM OF OUTSIDE AIR. 23.8 PROVIDE NEW EXHAUST FAN TO MATCH EXISTING FANS IN GUEST ROOMS. CONNECT TO EXISTING EXHAUST DUCT IN CHASE. 23.14 CONNECT TO EXISTING LOUVER IN PRECAST WALL. CONTRACTOR TO LOCATE ACTUAL LOCATION IN FIELD. 23.16 COORDINATE DUCT INSTALLATION WITH EXISTING TRUSSES IN LOBBY AREA. 23.18 CONTRACTOR TO VERIFY 24X32" DUCT WILL FIT IN EXISTING PRECAST CONCRETE WALL OPENING. IF OPENING NEEDS TO BE ENLARGED, CONTRACTOR TO VERIFY STRUCTURAL REQUIREMENTS. 23.19 CONTRACTOR TO VERIFY THAT EXISTING LOUVER HAS MINIMUM 8.5 SQFT OF FREE AREA. OTHERWISE, COORDINATE LOUVER SIZE WITH ENGINEER. 23.27 ENSURE MIN. 10'-0" CLEARANCE IS MAINTAINED BETWEEN EXHAUST AIR SOURCES AND VENTILATION AIR INLETS. 23.32 REUSE EXISTING ROOF PENETRATIONS SCALE: 1/4" = 1'-0" DRAWING REF: M2015ALOBBY DUCT LAYOUT SCALE: 1/4" = 1'-0" DRAWING REF: M2015DBACK OF HOUSE BATHROOM DUCT LAYOUT 1 8/25/2016 FOR CONSTRUCTION SET 10 9/15/17 CCD-0609/07/2017201709/0 KEF-01 MAU-01 RTU-A1 EF-09 GENERAL WHEN THE UNIT IS NOT SUPPLYING AIR, THE UNIT ISOLATION DAMPERS SHALL BE CLOSED. THE SEQUENCE DESCRIBED BELOW CONSISTS OF THREE MODES: SHUTDOWN, OCCUPIED COOLING OR HEATING, AND ECONOMIZER. SHUTDOWN MODE IS INTENDED TO DESCRIBE STOPPING RTU FANS IN AN ORDERLY MANNER, CLOSING DAMPERS AND INDICATE SHUTDOWN INFORMATION AT THE CONTROLLER. OCCUPIED COOLING OR HEATING MODE IS DETERMINED BASED ON THE OCCUPANCY SCHEDULE AND ADJUSTED BY THE OPTIMAL START PROGRAM FROM THE CONTROLLER. INITIAL OCCUPANCY SCHEDULE SHALL BE RUNNING 24 HOURS PER DAY. SHUTDOWN MODE: WHEN THE RTU IS INDEXED FOR SHUTDOWN MODE, THE UNITS SUPPLY AND EXHAUST FANS SHALL STOP. THE RTU EXHAUST AIR DAMPER SHALL OPEN FULLY, RELIEF AIR, OUTSIDE AIR AND ISOLATION DAMPERS SHALL CLOSE. COOLING AND HEATING SHALL BE DISABLED DURING SHUTDOWN. THE SYSTEM SHALL BE INDEXED TO SHUTDOWN MODE IF ANY ONE OR MORE OF THE FOLLOWING CONDITIONS ARE MET: ● A SHUTDOWN SIGNAL FROM THE CONTROLLER CONSOLE. ● AN ALARM CONDITION FROM THE RTU SUPPLY AND EXHAUST DUCT SMOKE DETECTOR. ● UPON ALARM CONDITION FROM THE RTU FREEZESTAT. OCCUPIED MODE: HEATING OR COOLING: ● AT THE PREDETERMINED OPTIMUM START TIME, AS DETERMINED BY THE OCCUPANCY SCHEDULE, THE RTU WILL BE ENABLED. ● THE BAS SHALL NEXT COMMAND THE RTU TO RUN AND OPEN THE ISOLATION DAMPERS. ● SPACE TEMPERATURE AND HUMIDITY SETPOINTS SHALL BE LOCATED IN TWO FLOORS IN THE CORRIDORS. TEMPERATURE AND HUMIDITY SHALL BE "WORST CASE" SELECTED AS THE CRITICAL CONTROL POINT. ● WITH THE SUPPLY FAN AND EF-7 RUNNING, THE OVERALL AIRFLOWS AT SHALL PROVIDE POSITIVE PRESSURE TO THE BUILDING. A BUILDING PRESSURE SENSOR SHALL BE PROVIDED AS AN AUXILIARY INPUT TO EACH UNIT. THE SENSOR SHALL MEASURE FROM AN UPPER LEVEL CORRIDOR TO OUTSIDE AMBIENT TO ENSURE A POSITIVE READING. EACH UNIT'S CONTROLLER SHALL THEN INDICATE WITH A DIGITAL INDICATION, WHETHER OR NOT THE ASSOCIATED SENSOR IS POSITIVE OR NEGATIVE. ● (MECHANICAL COOLING) ON A RISE IN SPACE AIR TEMPERATURE ABOVE SETPOINT AND THE HEATING COIL IS DISABLED, COOLING SHALL BE STAGED TO MAINTAIN TEMPERATURE SETPOINT (ADJ, INITIAL SETPOINT 74 F RESET THE SPACE TEMPERATURE SET POINT TO 70 F WHENEVER OAT < 35 F, BOTH ADJ.). THE AIR HANDLER SHALL VARY THE SUPPLY FAN SPEED TO MAINTAIN DOWNSTREAM STATIC PRESSURE AS MEASURED BY THE DUCT MOUNTED SENSOR. ● ON A FALL BELOW SPACE AIR TEMPERATURE SETPOINT, AND COOLING IS DISABLED,THE HYDRONIC HEATING COIL SHALL MODULATE TO MAINTAIN DISCHARGE TEMPERATURE SETPOINT. ● HIGH HUMIDITY DISCHARGE CONTROL SHALL BE ACCOMPLISHED VIA THE SPACE HUMIDITY SENSOR TO MAINTAIN A MAXIMUM HUMIDITY OF 55 PERCENT (ADJ.) AND ACCOMPLISHED BY COOLING AT THE AIR HANDLER AND HYDRONIC REHEAT AT THE TERMINAL BOXES. SMOKE SHUTDOWN: IN THE EVENT THAT SMOKE IS PRESENT IN THE RTU EXHAUST OR SUPPLY AIR DUCT: ● AN AUXILIARY CONTACT IN THE EXHAUST OR SUPPLY AIR DUCT SMOKE DETECTOR SHALL OPEN DE-ENERGIZING THE AUTO-MAINTAINED POWER SUPPLY TO THE FAN'S STARTER OR AFD OF THE RTU CAUSING THE FANS TO SHUT OFF. ● THE BAS SHALL SHUT DOWN THE EXHAUST AIR FANS UPON SHUTDOWN OF THE SUPPLY AIR FANS IN THE UNIT. ● SMOKE DETECTOR CONTACTS SHALL BE WIRED IN SERIES IN THE FAN MOTOR STARTER CIRCUIT. ● THE MECHANICAL CONTRACTOR SHALL PROVIDE AND TERMINATE THE HARD-WIRED CONNECTIONS FROM ANY DETECTOR RELAY (PROVIDED BY FIRE ALARM CONTRACTOR AND INSTALLED BY MECHANICAL CONTRACTOR) TO THE ASSOCIATED FAN TO BE SHUT DOWN, UNLESS OTHERWISE COORDINATED WITH THE UNIT MANUFACTURER. ● DURING MORNING COOL DOWN THE COMPRESSOR SHALL MODULATE OPEN OR CLOSED TO MAINTAIN DISCHARGE AIR TEMPERATURE AT DISCHARGE TEMPERATURE SETPOINT (ADJUSTABLE, STARTUP SETPOINT 58 F). THE AHU CONTROLLER SHALL RESET THE SUPPLY AIR TEMPERATURE SETPOINT 1 F COLDER EVERY 10 MINUTES (ADJUSTABLE) UNTIL THE SUPPLY TEMPERATURE IS AT THE OPERATING SETPOINT TEMPERATURE (ADJUSTABLE, INITIAL SETPOINT 55 F). IF THE RETURN AIR RELATIVE HUMIDITY RISES ABOVE 50%, THE 10 MINUTE CYCLE SHALL REPEAT AT THE SAME TEMPERATURE. ● DURING MORNING WARM-UP THE BAS SHALL MODULATE THE PREHEAT COIL VALVE TO ACHIEVE DISCHARGE SETPOINT. AFTER THAT DISCHARGE SETPOINT IS ACHIEVED AND RETURN AIR FROM THE TERMINAL ZONES REACHES THE PREDETERMINED ROOM SETPOINT (68° F, ADJ), THE BAS SHALL COMMAND THE TWO-POSITION, MINIMUM OA DAMPER OPEN. GENERAL NOTE: 1.) TERMINAL UNIT LOOP BRANCH PUMP/LOOP SHALL BE ENABLED WHEN BOILER LOOP IS ENABLED AND RUNNING. HOT WATER PUMP: 1.) THE HOT WATER LOOP CONSISTS OF A CONSTANT VOLUME DEDICATED PUMP THAT SHALL INCORPORATE THREE-WAY MIXING VALVES AT THE TERMINAL UNIT HOT WATER COILS TO MAINTAIN FLOW AND DISCHARGE TEMPERATURE. 2.) WHEN ENABLED, THE PUMP SHALL RUN CONTINUOUSLY. 3.) THE THREE-WAY MIXING VALVES SHALL BE CONTROLLED TO MAINTAIN SPACE TEMPERATURE PER ZONE THROUGH THE TERMINAL UNIT CONTROLLER. VALVES SHALL BE SIZED TO ALLOW CONSTANT FLOW AT THE PUMP. ECONOMIZER MODE: ● SYSTEM SHALL MONITOR DRY BULB TEMPERATURE DIFFERENTIAL BETWEEN RETURN AIR AND OUTDOOR AIR. WHEN OUTDOOR TEMPERATURE IS LESS THAN RETURN AIR TEMPERATURE, ECONOMIZER MODE SHALL BE ENABLED. ● WHEN ECONOMIZER MODE IS ENABLED, OPEN OUTDOOR AIR DAMPER TO 100% SETTING AND CLOSE THE RETURN AIR TO THE 0% SETTING. COOLING AND HEATING SHALL BE DISABLED WHEN ECONOMIZER MODE IS ENABLED. EF-7 SHALL CEASE OPERATION, AND EF-8 SHALL ENABLE TO PROVIDE BUILDING PRESSURE RELIEF. 1.) A MASTER HOOD SWITCH IN THE KITCHEN SHALL ENABLE THE HOOD EXHAUST FAN. THE SWITCH SHALL BE HARD-WIRED TO THE MASTER NATURAL GAS SOLENOID VALVES (AS SHOWN BY PLUMBING DESIGN DOCUMENTS) TO PREVENT COOKING WITHOUT EXHAUST HOOD OPERATION. MAU-1 SHALL BE COMMANDED TO RUN IN OCCUPIED MODE. 2.) WHEN INDIVIDUAL HOOD SWITCH IS INDICATED TO "ON", THE FOLLOWING SHALL OCCUR: a. THE ASSOCIATED APPLIANCE GAS SOLENOID VALVES (BY KITCHEN HOOD MANUFACTURER) SHALL OPEN ALLOWING THE OPERATION OF THE COOKING APPLIANCES. b. THE ASSOCIATED KITCHEN EXHAUST FANS SHALL START AND RUN CONTINUOUSLY. A VFD HAS BEEN PROVIDED FOR SOFT STARTING AND DEMAND CONTROL. THE DEMAND CONTROL SYSTEM SHALL VARY EXHAUST AND MAKEUP AIR FLOWS BASED ON EXHAUST TEMPERATURE OF THE HOOD. c. THE BAS SHALL MONITOR THE ANSUL FIRE SUPPRESSION SYSTEM AND, IF ACTIVATED, THE MASTER GAS SOLENOID VALVES AND ALL APPLIANCE GAS SOLENOID VALVES SHALL CLOSE. THE ASSOCIATED EXHAUST FAN SHALL CONTINUE TO OPERATE. GENERAL WHEN THE UNIT IS NOT SUPPLYING AIR, THE UNIT ISOLATION DAMPERS SHALL BE CLOSED. THE SEQUENCE DESCRIBED BELOW CONSISTS OF THREE MODES: SHUTDOWN, OCCUPIED COOLING OR HEATING, AND ECONOMIZER. SHUTDOWN MODE IS INTENDED TO DESCRIBE STOPPING RTU FANS IN AN ORDERLY MANNER, CLOSING DAMPERS AND INDICATE SHUTDOWN INFORMATION AT THE CONTROLLER. OCCUPIED COOLING OR HEATING MODE IS DETERMINED BASED ON THE OCCUPANCY SCHEDULE AND ADJUSTED BY THE OPTIMAL START PROGRAM FROM THE CONTROLLER. INITIAL OCCUPANCY SCHEDULE SHALL BE RUNNING 24 HOURS PER DAY. SHUTDOWN MODE: WHEN THE RTU IS INDEXED FOR SHUTDOWN MODE, THE UNITS SUPPLY AND EXHAUST FANS SHALL STOP. THE RTU EXHAUST AIR DAMPER SHALL OPEN FULLY, RELIEF AIR, OUTSIDE AIR AND ISOLATION DAMPERS SHALL CLOSE. COOLING AND HEATING SHALL BE DISABLED DURING SHUTDOWN. THE SYSTEM SHALL BE INDEXED TO SHUTDOWN MODE IF ANY ONE OR MORE OF THE FOLLOWING CONDITIONS ARE MET: ● A SHUTDOWN SIGNAL FROM THE CONTROLLER CONSOLE. ● AN ALARM CONDITION FROM THE RTU SUPPLY AND EXHAUST DUCT SMOKE DETECTOR. ● UPON ALARM CONDITION FROM THE RTU FREEZESTAT. OCCUPIED MODE: HEATING OR COOLING: ● AT THE PREDETERMINED OPTIMUM START TIME, AS DETERMINED BY THE OCCUPANCY SCHEDULE, THE RTU WILL BE ENABLED. ● THE BAS SHALL NEXT COMMAND THE RTU TO RUN AND OPEN THE ISOLATION DAMPERS. ● SPACE TEMPERATURE SETPOINTS SHALL MEASURED BY THE SPACE THERMOSTAT. ● THE SUPPLY FAN IN COOLING MODE SHALL VARY THE AIRFLOW FROM 100% TO 50% BASED ON THE LOAD AS DETERMINED BY THE SPACE THERMOSTAT. THE SUPPLY AIRFLOW IN HEATING MODE SHALL BE CONSTANT. ● (MECHANICAL COOLING) ON A RISE IN SPACE AIR TEMPERATURE ABOVE SETPOINT AND THE HEATING COIL IS DISABLED, COOLING SHALL BE STAGED TO MAINTAIN TEMPERATURE SETPOINT (ADJ, INITIAL SETPOINT 74 F RESET THE SPACE TEMPERATURE SET POINT TO 70 F WHENEVER OAT < 35 F, BOTH ADJ.). ● ON A FALL BELOW SPACE AIR TEMPERATURE SETPOINT, AND COOLING IS DISABLED, THE GAS BURNER SHALL STAGE TO MAINTAIN SPACE TEMPERATURE SETPOINT. SMOKE SHUTDOWN: IN THE EVENT THAT SMOKE IS PRESENT IN THE RTU RETURN OR SUPPLY AIR DUCT: ● AN AUXILIARY CONTACT IN THE EXHAUST OR SUPPLY AIR DUCT SMOKE DETECTOR SHALL OPEN DE-ENERGIZING THE AUTO-MAINTAINED POWER SUPPLY TO THE FAN'S STARTER OR AFD OF THE RTU CAUSING THE FANS TO SHUT OFF. ● THE BAS SHALL SHUT DOWN THE EXHAUST AIR FANS UPON SHUTDOWN OF THE SUPPLY AIR FANS IN THE UNIT. ● SMOKE DETECTOR CONTACTS SHALL BE WIRED IN SERIES IN THE FAN MOTOR STARTER CIRCUIT. ● THE MECHANICAL CONTRACTOR SHALL PROVIDE AND TERMINATE THE HARD-WIRED CONNECTIONS FROM ANY DETECTOR RELAY (PROVIDED BY FIRE ALARM CONTRACTOR AND INSTALLED BY MECHANICAL CONTRACTOR) TO THE ASSOCIATED FAN TO BE SHUT DOWN, UNLESS OTHERWISE COORDINATED WITH THE UNIT MANUFACTURER. ● DURING MORNING COOL DOWN THE COMPRESSOR SHALL MODULATE CAPACITY TO MAINTAIN DISCHARGE AIR TEMPERATURE AT DISCHARGE TEMPERATURE SETPOINT (ADJUSTABLE, STARTUP SETPOINT 58 F). THE AHU CONTROLLER SHALL RESET THE SUPPLY AIR TEMPERATURE SETPOINT 1 F COLDER EVERY 10 MINUTES (ADJUSTABLE) UNTIL THE SUPPLY TEMPERATURE IS AT THE OPERATING SETPOINT TEMPERATURE (ADJUSTABLE, INITIAL SETPOINT 55 F). IF THE RETURN AIR RELATIVE HUMIDITY RISES ABOVE 50%, THE 10 MINUTE CYCLE SHALL REPEAT AT THE SAME TEMPERATURE. ● DURING MORNING WARM-UP THE BAS SHALL STAGE THE NATURAL GAS BURNER TO ACHIEVE DISCHARGE SETPOINT. AFTER THAT DISCHARGE SETPOINT IS ACHIEVED AND RETURN AIR FROM THE TERMINAL ZONES REACHES THE PREDETERMINED ROOM SETPOINT (68° F, ADJ), THE BAS SHALL COMMAND THE MINIMUM OA DAMPER OPEN. ECONOMIZER MODE: ● SYSTEM SHALL MONITOR THE DRY BULB DIFFERENTIAL BETWEEN RETURN AIR AND OUTDOOR AIR. WHEN OUTDOOR DRY BULB TEMPERATURE IS LESS THAN RETURN AIR TEMPERATURE, ECONOMIZER MODE SHALL BE ENABLED. ● WHEN ECONOMIZER MODE IS ENABLED, OPEN OUTDOOR AIR DAMPER TO 100% SETTING AND CLOSE THE RETURN AIR TO THE 0% SETTING. COOLING AND HEATING SHALL BE DISABLED WHEN ECONOMIZER MODE IS ENABLED. SEQUENCE OF OPERATION - SINGLE DUCT TERMINAL UNIT - (TYPICAL) SEQUENCE OF OPERATION - VAV TERMINAL UNITS, NO FAN, H.W. HEAT 1. UNOCCUPIED: WHEN THE BUILDING IS INDEXED FOR UNOCCUPIED OPERATION, THE TERMINAL PRIMARY AIR DAMPER SHALL CLOSE. 2. NIGHT SETBACK: THE PRIMARY AIR DAMPER SHALL OPEN TO ITS MINIMUM SETPOINT. WHEN THE SPACE TEMPERATURE DROPS TO 60F (ADJ.), THE HYDRONIC REHEAT VALVE SHALL MODULATE. THE PRIMARY AIR DAMPER SHALL CLOSE WHEN THE SPACE TEMPERATURE RISES TO 65F(ADJ.). 3. NIGHT SETUP: THE PRIMARY AIR DAMPER SHALL OPEN WHEN THE SPACE TEMPERATURE RISES TO 90F. THE PRIMARY AIR DAMPER SHALL CLOSE WHEN THE SPACE TEMPERATURE DROPS TO 85F. 4. OPTIMAL START WARM-UP: WHEN THE OPTIMAL START PROGRAM CALLS FOR WARM UP OPERATION, THE PRIMARY AIR DAMPER SHALL OPEN TO ITS HEATING CFM SETPOINT AND MODULATE THE HW VALVE TO OPEN. THE VAV TERMINAL SHALL OPERATE AS DESCRIBED UNDER OCCUPIED OPERATION. 5. OPTIMAL START COOL-DOWN: WHEN THE OPTIMAL START PROGRAM CALLS FOR COOL-DOWN OPERATION, THE PRIMARY AIR DAMPER SHALL OPEN TO ITS MAXIMUM COOL CFM SETPOINT. THE VAV TERMINAL SHALL OPERATE AS DESCRIBED UNDER OCCUPIED OPERATION. 6. UNOCCUPIED OVERRIDE: THE UNIT TEMPERATURE SENSOR SHALL HAVE AN OVERRIDE SWITCH IN THE HOUSING WHICH CAN BE MANUALLY ACTIVATED TO PROVIDE ONE HOUR (ADJ.) OF OCCUPIED TERMINAL OPERATION DURING THE UNOCCUPIED PERIOD. THE AHU SHALL START AND OPERATE AS DESCRIBED UNDER ITS SEQUENCE OF OPERATION. THE TERMINAL SHALL OPERATE AS DESCRIBED UNDER OCCUPIED OPERATION. 7. OCCUPIED: WHEN THE UNIT IS INDEXED FOR OCCUPIED OPERATION, THE UNIT SHALL CONTROL AT THE HEATING SETPOINT OF 70 F, COOL SETPOINT OF 74 F . THE PRIMARY AIR DAMPER SHALL BE POSITIONED TO ITS CFM AIR FLOW, AS SCHEDULED. THE HEATING COIL SHALL MODULATE AS REQUIRED TO MAINTAIN THE SPACE TEMPERATURE . ON A RISE IN SPACE TEMPERATURE THE PRIMARY AIR DAMPER WILL OPEN AFTER THE HW VALVES HAVE BOTH CLOSED. 8. THE CONTROLS SHALL BE ARRANGED FOR PRESSURE INDEPENDENT OPERATION, I.E., THE DAMPER POSITION SHALL BE SET BY THE FLOW SENSOR, AND THE SPACE TEMPERATURE WILL RESET THE FLOW SENSOR SO THAT PRIMARY AIR FLOW WILL BE CONSTANT AT ANY SETPOINT, REGARDLESS OF CHANGES IS PRIMARY DUCT PRESSURE. 1 A23456ABCDE 134562 COPYRIGHT 2016 BASKERVILL. USE OF THIS WORK IN WHOLE OR IN PART IS FORBIDDEN WITHOUT EXPRESSED WRITTEN CONSENT.BCDEDRAWING NO. P.O. BOX 400, RICHMOND, VA 23218-0400 DRAWING TITLE ISSUE PROJECT OWNER ®9/19/2017 4:50:51 AMUNIT CONTROLS THE WIDEWATERS GROUP 2.160036.0 DOUBLETREE VAIL, CO CONVERSION GUESTROOMS & PUBLIC SPACES RENOVATION 08/25/16 - CONSTRUCTION DOCUMENTS M701 2211 N FRONTAGE RD, VAIL, COLORADO 81657 SEQUENCE OF OPERATIONS AHU VARIABLE AIR VOLUME AIR HANDLER UNIT SEQUENCE OF OPERATIONS TERMINAL UNIT HYDRONIC CONTROLS 1 8/25/2016 FOR CONSTRUCTION SET 10 9/15/17 CCD-06 SEQUENCE OF OPERATIONS KITCHEN HOOD INTEGRATION SEQUENCE OF OPERATIONS ROOFTOP UNIT (RTU-A1) SEQUENCE OF OPERATIONS TERMINAL UNIT AIRSIDE CONTROLS 09/07/2017201709/0