Loading...
HomeMy WebLinkAboutDRB18-0278_action_form_drb_07-03-2018_5b3baa58227c1-0_1530642051.pdf Design Review Board (DRB) Department of Community Development 75 South Frontage Road West k-Ci) TOWN OF VA 1 L ACTION FORM Vail, CO 81657 Tel: 970-479-2139 www.vailgov.com Project Name: Phillips Residence 2018 Application Number: DRB18-0278 Application Type: Exterior Alteration Date Applied: 06/26/2018 16.8 kW Flush-Mount Grid-Tie Rooftop Photovoltaic Solar.This is a standard flush-mount rooftop PV solar installation.The home also is having a new roof installed,& the solar attachments will be placed during the roofing process, with the penetrations flashed by the professional roofer.Where possible,conduit will Project Description: be hidden in attic areas,and where visible it will be painted to match the exterior.There will be snow guards to prevent dangerous snow slides from the solar array where needed.The array will be a couple inches off the roof deck.The affected roof areas are difficult to view from any vantage point,although if you know exactly where to direct your attention,it is possible to catch a glimpse from 1-70. CONTACTS Contact Type: Applicant Full Name: Buglet Solar Electric Installation (Whitney Painter) Address: 722 Iowa Street Golden, CO 80403 Phone: 3039039119 Contact Type: Property Owner Full Name: PHILLIPS, MICHAEL L. & CAROL KAY Address: Phone: None Project Address: 2696 DAVOS TRL (210314204023) (210314204023) Job Site Location: Legal Description: Subdivision: VAIL RIDGE SUBDIVISION Lot: 6 Block: C Parcel Number: 210314204023 BOARDS/STAFF ACTION Motion By: Action: Staff Approved Second By: Vote: Date: 07/03/2018 Conditions: - Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. - Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3 Appeals. - No changes to these plans maybe made without the written consent of Town of Vail staff and/or the appropriate review committee(s). - 605.11 .1.2.5 Allowance for smoke ventilation operations. Panels and modules installed on Group R-3 buildings shall be located not less than 3 feet (914 mm) from the ridge in order to allow for fire department smoke ventilation operations. 605.11 .1 .2.1 Size of solar photovoltaic array. Each photovoltaic array shall be limited to 150 feet (45 720 mm) by 150 feet (45 720 mm). Multiple arrays shall be separated by a 3-foot-wide (914 mm) clear access pathway. 605.11.1.2.2 Hip roof layouts. Panels and modules installed on Group R-3 buildings with hip roof layouts shall be located in a manner that provides a 3- foot-wide (914 mm) clear access pathway from the eave to the ridge on each roof slope where panels and modules are located. The access pathway shall be at a location on the building capable of supporting the fire fighters accessing the roof. Exception: These requirements shall not apply to roofs with slopes of two units vertical in 12 units horizontal (2:12) or less. 605.11 .1.2.3 Single-ridge roofs. Panels and modules installed on Group R-3 buildings with a single ridge shall be located in a manner that provides two, 3-foot-wide (914 mm) access pathways from the eave to the ridge on each roof slope where panels and modules are located. Exception: This requirement shall not apply to roofs with slopes of two units vertical in 12 units horizontal (2:12) or less. Planner: To Be Determined