Loading...
HomeMy WebLinkAboutDRB18-0264_action_form_drb_06-27-2018_5b33e34601ad1-0_1530129871.pdf Design Review Board (DRB) Department of Community Development 75 South Frontage Road West TOWN F VA 1 L ACTION FORM Vail, CO 81657 Tel: 970-479-2139 www.vailgov.com Project Name: Chamonix Vail 2015 Application Number: DRB18-0264 Application Type: Change to Approved Date Applied: 06/20/2018 Revisions to the boiler flue exhaust penetrations. The existing side wall exhaust Project Description: louver is to be re-routed to up through the attic and through the roof as a pipe penetration. The existing side wall location will be maintained for the boiler fresh air intake. See revised locations on elevations and roof plan. CONTACTS Contact Type: Applicant Full Name: 359 Design (Rob Wilberger) Address: 3630 Osage Denver, CO 80211 Phone: 7208393066 Contact Type: Property Owner Full Name: TOWN OF VAIL Address: Phone: None Project Address: 2310 CHAMONIX RD (210311415022) (210311415022) Job Site Location: No Legal Description: Subdivision: VAIL DAS SCHONE FILING 1 Lot: Parcel B Block: Data Parcel Number: 210311415022 BOARDS/STAFF ACTION Motion By: Action: Staff Approved Second By: Vote: Date: 06/27/2018 Conditions: - Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. - All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted (adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final inspections. - No changes to these plans maybe made without the written consent of Town of Vail staff and/or the appropriate review committee(s). - Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3 Appeals. Planner: Jonathan Spence