Loading...
HomeMy WebLinkAboutDRB18-0231_action_form_drb_06-12-2018_5b2007643f75a-0_1528836599.pdf Design Review Board (DRB) Department of Community Development 75 South Frontage Road West TOWN F VA 1 L ACTION FORM Vail, CO 81657 Tel: 970-479-2139 www.vailgov.com Project Name: Smith Residence 2018 Application Number: DRB18-0231 Application Type: Exterior Alteration Date Applied: 06/04/2018 RA Nelson will be adding air conditioning and fire sprinkler system to units #1-2. This will require a condensing unit to be placed outside the residential unit. RA Nelson had previously received staff approval (application DRB18-0077) to place the condensing unit on ground level behind a retaining wall, but Owner now would like to put the condensing unit on the roof. This location keeps the unit Project Description: away from the edge of the building where it could be visible from the street. Also keeps unit away from penthouse windows. The condensing unit will be adjacent to the proposed condensers for units 3-4, and 6. All three condensers will be screened with wood to match existing, and placed on vibration isolators. The line set would run down the elevator core, or the down the stairwell; it would not run along the face of the building. This application is only for units 1-2. Another General Contractor is remodeling units 3,4, and 6. CONTACTS Contact Type: Applicant Full Name: RA Nelson (Erik Garcia) Address: 51 Eagle Road #2 Avon, CO 81620 Phone: 9704450309 Contact Type: Property Owner Full Name: SMITH, MICHAEL S. & IRIS BLUE SPRUCE CAPITAL CORP Address: Phone: None Contact Type: Property Owner Full Name: SMITH, MICHAEL S. & IRIS BLUE SPRUCE CAPITAL CORP Address: Phone: None Project Address: 44 W MEADOW DR 2 (210107116002 2) (210107116002)144 W MEADOW DR 1 (210107116001 1) (210107116001) Job Site Location: 1 No Legal Description: Subdivision: VAIL VILLAGE FILING 2 Lot: I Block: Data Parcel Number: 210107116001 BOARDS/STAFF ACTION Motion By: Action: Staff Approved Second By: Vote: Date: 06/12/2018 Conditions: - All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted (adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final inspections. - Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. - Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail building personnel prior to construction activities. - Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3 Appeals. - No changes to these plans maybe made without the written consent of Town of Vail staff and/or the appropriate review committee(s). - Applicant shall locate the Air Conditioning condensers on the roof in a location that will reduce the potential for visibility from the ground below. In addition, a screen shall be installed around the condenser in a design and color to match the existing screens on the roof. Planner: Chris Neubecker