Loading...
HomeMy WebLinkAboutaction_form_drb_06-22-2018_5b2d2e93b5fbe-0.pdf Design Review Board (DRB) Department of Community Development 75 South Frontage Road West TOWN F VA 1 L ACTION FORM Vail, CO 81657 Tel: 970-479-2139 www.vailgov.com Project Name: SSCS LLC 2018 Application Number: DRB18-0186 Application Type: Addition Date Applied: 05/14/2018 final DRB review for an addition and interior renovation of a single family home. Homeowner wishes to enlarge their recreation room extending out to the rear 54", additionally they will be dong some interior work and roof work (including full Project Description: re-roof with Class A material). As part of the roof work, they would like to capture space to improve their master bath, closet and laundry. The rear setback is not being reduced, the existing building height is being maintained, lot coverage and landscaping requirements fall within allowed parameters, finishes will match existing. CONTACTS Contact Type: Applicant Full Name: GPS Designs, Ilc (Gregory Sparhawk) Address: 301 Boulder street 333 minturn, CO 81645 Phone: 9704704945 Contact Type: Property Owner Full Name: SSCS LLC Address: Phone: None Project Address: 4425 GLEN FALLS LN (210112313002) (210112313002) Job Site Location: No Legal Description: Subdivision: FOREST GLEN SUBDIVISION Lot: 2 Block: Data Parcel Number: 210112313002 BOARDS/STAFF ACTION Motion By: Cahill Action: Approved Second By: Campbell Vote: 4-0 Date: 06/06/2018 Conditions: - All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted (adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final inspections. - Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. - Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail building personnel prior to construction activities. - Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3 Appeals. - No changes to these plans maybe made without the written consent of Town of Vail staff and/or the appropriate review committee(s). - Prior to issuance of a building permit, the Applicant shall submit a construction management plan showing how access to the rear of the property will be obtained, showing where construction materials will be stored during construction, and indicating the method to prevent erosion into Gore Creek. Best Management Practices for erosion control shall be installed by the Applicant and inspected by the Town of Vail prior to start of construction. Planner: Chris Neubecker