HomeMy WebLinkAboutaction_form_drb_06-22-2018_5b2d2e93b5fbe-0.pdf Design Review Board (DRB)
Department of Community Development
75 South Frontage Road West
TOWN F VA 1 L ACTION FORM Vail, CO 81657
Tel: 970-479-2139
www.vailgov.com
Project Name: SSCS LLC 2018 Application Number: DRB18-0186
Application Type: Addition Date Applied: 05/14/2018
final DRB review for an addition and interior renovation of a single family home.
Homeowner wishes to enlarge their recreation room extending out to the rear
54", additionally they will be dong some interior work and roof work (including full
Project Description: re-roof with Class A material). As part of the roof work, they would like to capture
space to improve their master bath, closet and laundry. The rear setback is not
being reduced, the existing building height is being maintained, lot coverage and
landscaping requirements fall within allowed parameters, finishes will match
existing.
CONTACTS
Contact Type: Applicant
Full Name: GPS Designs, Ilc (Gregory Sparhawk)
Address: 301 Boulder street 333 minturn, CO 81645 Phone: 9704704945
Contact Type: Property Owner
Full Name: SSCS LLC
Address: Phone: None
Project Address: 4425 GLEN FALLS LN (210112313002) (210112313002)
Job Site Location:
No
Legal Description: Subdivision: FOREST GLEN SUBDIVISION Lot: 2 Block: Data
Parcel Number: 210112313002
BOARDS/STAFF ACTION
Motion By: Cahill Action: Approved
Second By: Campbell
Vote: 4-0 Date: 06/06/2018
Conditions:
- All exposed metal flashing, trim, flues, vents, and rooftop mechanical equipment shall be anodized, painted
(adjacent facade/roof material color or flat black), or capable of weathering so as to be non-reflective
pursuant to Section 14-10-5C, Building Materials and Design, Vail Town Code, pror to requesting final
inspections.
- Approval of this project shall lapse and become void one (1) year following the date of final approval, unless
a building permit is issued and construction is commenced and is diligently pursued toward completion.
- Design Review Board approval does not constitute a permit for building. Please consult with Town of Vail
building personnel prior to construction activities.
- Design Review Board approval shall not become valid for 20 days following the date of approval, pursuant
to the Vail Town Code, Chapter 12-3-3 Appeals.
- No changes to these plans maybe made without the written consent of Town of Vail staff and/or the
appropriate review committee(s).
- Prior to issuance of a building permit, the Applicant shall submit a construction management plan showing
how access to the rear of the property will be obtained, showing where construction materials will be stored
during construction, and indicating the method to prevent erosion into Gore Creek. Best Management
Practices for erosion control shall be installed by the Applicant and inspected by the Town of Vail prior to
start of construction.
Planner: Chris Neubecker