Loading...
HomeMy WebLinkAboutB18-0067_Pavement Design signed_1521480169.pdf H-P-�KU mAR5020 County Road 154 Glenwood Springs, CO 81601 Geotechnical Engineering I Engineering Geology Phone: (970)945-7988 Materials Testing I Environmental Fax: (970)945-8454 Email: hpkglenwood@kumarusa.com Office Locations: Denver(HQ), Parker, Colorado Springs, Fort Collins, Glenwood Springs, Summit County, Colorado January 25, 2018 Westwind at Vail Attn: Jeff Jacobs 548 South Frontage Road Vail, Colorado 81657 iiacobs@vail.net Project No. 17-7-463 Subject: Recommendations for Pavement Section Thickness Design, Proposed Site Improvements,Westwind at Vail, 548 South Frontage Road, Vail, Colorado Dear Jeff: As requested by Bill Pierce, we are providing recommendations for pavement section thickness design at the subject site. This report provides our recommendations for the pavement section and subgrade preparations. The services are supplemental to our agreement for geotechnical services to Westwind at Vail dated June 9, 2017. Background Information: H-P/Kumar previously conducted a subsoil study for design of the proposed fitness center pool renovations at the site and presented our findings in a report dated October 6, 2017, Project No. 17-7-463. New concrete pavement on the west and north sides of the building are also planned. The pavement will be subjected to regular vehicle traffic including some truck traffic, consisting primarily of trash pick-up, with occasional fire trucks. The traffic loadings have not been provided but are assumed to be typical of the development. The concrete pavement will be heated. Subgrade Conditions: Our previous borings on the east side of the building encountered primarily silty clayey sand with scattered gravel soils at shallow depths underlain by coarse granular soils. The sand soils are assumed to be exposed at subgrade in the new pavement areas. These soils typically have an AASHTO Classification of A-4 and are considered fair to poor support for pavement sections, and moderately susceptible to frost heave. We assume a modulus of subgrade reaction of 75 pci for the rigid (concrete) pavement design. Westwind at Vail January 25, 2018 Page 2 Traffic Loading: Since anticipated traffic loading information was not available at the time of report preparation, an 18 kip equivalent daily load application (EDLA) of about 12 was assumed for combined automobile and truck traffic, including fire trucks, in the pavement areas. These loadings are typical of a similar size development driveway, and should be checked by the project civil engineer. Recommendations: Based on the assumed and estimated parameters, the pavement section in areas of combined automobile and truck traffic should consist of a 61 inches CDOT Class D portland cement concrete on 4 inches of CDOT Class 6 aggregate base course. The section assumes a design strength of 4,500 psi for the concrete. The concrete should be air entrained. It is feasible to place 2 inch thick rigid insulation between the base course and concrete. The insulation should consist of heavy duty Styrofoam Brand Highload material or equivalent. Prior to placing new pavement materials, the subgrade should be stripped of debris, topsoil, unsuitable fill materials and any unstable soils, scarified, moisture content adjusted to near optimum and compacted to at least 95% of the maximum standard Proctor density. Some subgrade soil areas may be highly moist and need to be stabilized or removed. The pavement subgrade should be proof-rolled with a heavily loaded pneumatic-tired vehicle. Pavement design procedures assume a stable subgrade. Areas which deform excessively under heavy wheel loads are not stable and should be removed and replaced with well graded coarse granular soils to achieve a stable subgrade prior to paving. Backfill needed in low areas should consist of a relatively well-graded granular soil, excluding debris and rocks larger than 6 inches, and be compacted to at least 95% of standard Proctor density within 2 percentage points of optimum. The collection and diversion of surface drainage away from paved areas is extremely important to the satisfactory performance of pavement. Drainage design should provide for the removal of water from paved areas and prevent wetting of the subgrade soils. Limitations: The recommendations submitted in this report are based on assumed traffic loadings and subgrade conditions from nearby borings. We did not perform subsurface exploration to determine the subsoil conditions at the pavement areas. It is possible the data obtained by subsurface exploration could change the recommendations contained in this letter. We should verify the assumed subgrade conditions at the time of construction. If conditions encountered during construction appear different from those described in this report, we should H-PMKUMAR Project No. 17-7-463 Westwind at Vail January 25, 2018 Page 3 be notified at once so re-evaluation of the recommendations may be made. Significant design changes may require additional analysis or modifications to the recommendations presented herein. We recommend observation of subgrade conditions exposed and proof-rolling of the subgrade, and compaction testing of structural fill by a representative of the geotechnical engineer. If you have any questions or need further assistance, please call our office. Sincerely, H-PKUMAI itomatob 5.3 la* t• fa David A. Young, P.E. -216 �tg ® DAY/kswk 32 143 �'",, , rOe14 cc: William Pierce Architects—Bill Pierce (bill@vailarchitects.com) Yarnel Engineering—Justin Yarnel (Justin@theyarnells.com) RA Nelson &Associates—Jason Morley(imorley@ranelson.com) Sean Reynolds (sean@vailmanagement.com) H-PKUMAR Project No. 17-7-463