Loading...
HomeMy WebLinkAboutB14-0200_S2 STRUCTURAL FOUNDATION PLAN_1405626840.pdf 4 F . AppillV. iityilltiris,, igt �I 1 � I rri 1Pit *41) 4 T60 -. W. ' 5Y2 fjwilao) Va'' ° wi� vv� 07/17/14 ���iiv�i� A NOTE: ALL T.O.W. & T.O.F. ELEVATIONS ARE APPROXIMATE. FIELD VERIFY FOR EXACT ELEVATIONS ° L ° IPOPta III--- �� �SyV�9®®fl0@. all 'A SPREAD FOOTING SCHEDULE TYPESIZEREINFORCING a — #5's VERT. @ 16" O.C. e®•m•® ��'°° ', ,, ®®®e, �� A 4'-6 x 4'-6 x 1'-2 (5)—#5's x 4'-0 EA. WAY _ • 4." B 3'-6 x 3'-6 x 1'-0 (4)—#5's x 3'-0 EA. WAY T.O.W. = 56'-7 T.O.F. = 50'-0 7.0 4" 4/" C 3'-0 x 3'-0 x 1'-0 (4)—#5's x 2'-6 EA. WAY 4A / 05/26/14 `r,'ii 5 T.O.W. = 59'— # s CONT. HORIZ. @ 16" 0.0., 1 T.O.F. = 50'-0 A •.2-' S2 N PHASE FDTN. EXCAVATION & POUR — — J - ,0 'I' ALTERNATE 8' MAX. SECTIONS FOR — I cy, TWO SEPARATE EXCAVATION POUR J \\�\\�\\��� PHASES THRU—OUT TYP. �7 �%��ivv�i����� Z rn,--c--) /. T.O.W. = 54'-7 0 ��v!r C 0 N T.O.F. = 50'-0 i� #5 DWLS x C° a U) 0 rn� ��������������/ _I T.O.W. = 56'-7 @ 48 O.C. N rn Z x T.O.F. = 50'-0 6„ Z L sH 0 4" CONCRETE SLAB ON 4" CLEAN • WI T.O. (E)W. = 6O'-5Y2 I GRAVEL BASE ON UNDISTURBED 3'-0„ (2)—#5 s CONT. HORIZ. 1 3'-0" GRADE OR COMPACTED STRUCTURAL t TOP & BOT. �' ID (nI Z Z .(5) FILL PER SOILS ENGINEER. a) — — — — — — — REINFORCE SLAB WITH I � :N y, - 6x6—W1.4xW1.4 WELDED WIRE FABRIC A Ti �n C° �_ THROUGHOUT. PROVIDE 1" DEEP ` CO I .I o — SAWN OR TOOLED CONTROL JOINTS — . 50'-0 • Iwo xo 0 N - T.O.W. = 54'-7 T.O.W. = 54'-2U I S' AT 10'-0" MAXIMUM SPACING EACH T.O.F. _ ,°,A,:lx-, A L 2 J T.O.F. = 50'-0 I I ® WAY. T.O.F. = 50'—0 °° 0�., 0 A I y .,al� Y + o Q cn 0_ > 1 TDWL. (N) CONC. WALLS TO (E) T — _iC " W/ #5 DWLS. x 24" DRIVEN INTO I I PERIMETER DRAIN 4" 8" 4" '•� 5/$"0x4" HOLES @ 12" 0.0. AND ® I \ PER SOILS ENGINEER / / rT, (2) DWLS. IN—FTG., TYP. I I I 6—�- 1'-4" CUT T.O.W. — 53'-6± L T 1 410 v 15'-8Y4" 10'-1" 2'-7)/2„ SCALE: 3/4" = 1'-0" s T.O.W. = 60'-5Y2 T.O.W. = 52'-7 - / I Il � 1 T.O.F. = 50'-0 / T.O.F. = 50'-0 C co U / f2'-0" 0 , In oI PHASE FDTN: (.1N 2 CUT T.O.W. = 53'-6± L J < < PHASE 1 MUST BE POURED PRIOR TO S2 4 50' SLAB < EXCAVATION ON PHASE 2. (8' MAX. II o v POUR/PHASE LENGTH) Cip \ IH I I � \ DWL. (N) CONC. WALLS TO (E) lo B 1 _ — _ 61'-5 io W/ #5 DWLS. x 24" DRIVEN INTO C ��— — — — T.O. PLYWD.+ 5/s"0x4" HOLES @ 12" 0.C. AND I I T.O.W. = 54'-2 ) III U (2) DWLS.O.W.N 52'-7YP. I I 1 -13 T.O.F. = 50'—0 60'-5Y2 ����i - : 1 � ®. v T.O.W. = 59'-4Y2 II 2'—O" T.O.W. N 1 T.O.F. = 50 —0 L J T.O.F. = 50'-0 L J 0 �^ i (E) 2x10 JOISTS C 1 p� \ 0 - - � 0 I0000 T.O.W. = 59'-4Y2 T.O.W. = 49'-9 co STEP / T.O.F. = 47 —1 T.O.F. — 47 —1 ',o\ 71°1 I� I I Lih r--1 .71-1 \ L T L10 �� WALLEONC. FDTN. T.O. (E)W. = 60'-5Y2 -co 1 �� 16'-0" V.I.F. 1 13'-45/8" V.I.F. 12'-7" 2'-1138 I � I 3'-8" 44'-11" NOTE: EXSTG. FTG. MAY BE CUT ` 1 / TO WALL FACE PRIOR TO NEW POUR. 48'-7" 1 - 5„ _ H o 54'-7 _l— — L (1)—#5 CONT. o NORTH T.O.F. °,. ' .'�` HORIZ. @ TOP FOUNDATION PLAN = b � SCALE: 1 /4" 1 '-0' ;poi ,;(: w� �, T #5 DWLS x I designed by TDH oo��. r ; " drawn by CLR PLAN NOTES @ 16 o.c. oris 5 „ (DRIVEN INTO /$ O x4" HOLE) 1. ELEVATIONS OF CONCRETE FOUNDATION ELEMENTS INDICATED ON PLAN THUS: "* JMO T.O.W.=TOP OF CONCRETE WALL T.O.F.=TOP OF CONCRETE FOOTING 5 , a checked by = 2. TOP OF FOOTING ELEVATIONS ARE BASED ON FINDING ADEQUATE SOIL BEARING ° #5 DWLS x issued CONDITIONS AT THAT DEPTH. CONTACT ENGINEER IF OVEREXCAVATION IS REQUIRED. °° • A @ 8" O.C. D CPERMIT 05/26/14 3. STEPS IN TOP OF CONCRETE WALL INDICATED: I 3'-5 To A a #5 CONT. HORIZ. 4. CONTINUOUS CONCRETE FOOTINGS ARE CENTERED BENEATH CONCRETE FOUNDATION 3 7 @ 16" 0.0. WALLS UNLESS NOTED OTHERWISE. Y2" EXP. MAT'L, TYP. 5. CONCRETE FOUNDATION WALLS ARE 8" THICK AND CONTINUOUS FOOTINGS ARE 8" 1 CONC. SLAB THICK x 16" WIDE UNLESS NOTED OTHERWISE. PER PLAN A_ A 5O'-5 6. ALL OPENINGS AND STEPS IN CONCRETE WALLS SHALL BE VERIFIED WITH ARCHITECT - \ T.O. SLAB AND CONTRACTOR. 4 Ea a ..•yam ,�, �..(g 7. POSTS FROM ABOVE ARE INDICATED: Z o ,n -' STEEL COLUMNS FROM ABOVE ARE INDICATED: D I a , • ° , °4 �o\\oj / sheet 8. DO NOT SCALE DRAWINGS. r r 9. NOTE: ALL T.O.W. & T.O.F. ELEVATIONS ARE 10" / 3'—O" ,_ l o APPROXIMATE. FIELD VERIFY FOR EXACT ELEVATIONS �' � 1 SCALE: 3/4" = 1'—O" S2 J03 #1404- 20