Loading...
HomeMy WebLinkAboutCompactionReport(18-6523.Compaction.0001).pdf Client: Chad Salli Town of Vail GROUND 1309 El 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: May 10,2018 Work Order No.: 18-6523.Compaction.0001;ver:2 Work Order Date: May 8,2018 Reviewed by: Shane Sorensen Corn•action Earthwork Contractor: Heyl Performed by: Chris Leeper Equipment Used: ExcavatoriHaul TruckiLoaderiRemote Trench Nuclear Gauge: 74,Troxler 3440,37846 Roller Weather,High/Low Temp.: Mostly Sunny,70/45(°F) Standard Counts: 2022/756 Item/Structure Type/Number: Fill Placement Location: Level 3 and 4 Access Road Notifications The following individuals were notifed of all results while on-site. Name Company Justin Fahnestock Haselden Construction Tom Highsmith Haselden Construction Greg Hall Town of Vail Chuck Heyl Material Properties Lab Max.Dry Density(pcf) Lab Opt.MC(%) Soil Type Proctor Method 142.2 4.6 (GC)s D1557 Specifications Spec.ID-Specification Title Property Specified 692-Overlot Grading/Embankment-Sand Moist. Dev.(%) -2 to 2 692-Overlot Grading/Embankment-Sand Relative Comp. (%) 95 min. Nuclear Soil Density and Moisture Content (ASTM D6938 and D4718/AASHTO T310 and T224) Results Gauge Corr. Corr. Lab Relative Test No. Spec.ID Test Location Elevation Total Wet Field Dry Field Max.Dry Lab Opt. Comp. Moist. Pass (ft) Density Density MC(/) Density MC(/o) (/) Dev. (/o) or Fail 1 692 Sta 2+35 8221 141.6 132.3 7.0 142.2 4.6 93.1 2.4 Fail 1.1 692 Sta 2+35(Retest) 8221 144.7 135.9 6.5 142.2 4.6 95.5 1.9 Pass Commonly Used Abbreviations: RSG=Rough Surface Grade BG=Below Grade RFG=Rough Footing Grade Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 1 of 2 Client: Chad Salli Town of Vail GROUND 1309 El 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: May 10,2018 Work Order No.: 18-6523.Compaction.0001;ver:2 Work Order Date: May 8,2018 Reviewed by: Shane Sorensen Com.action Photos L _ ; .. \\7%. ----.....N_ _:.O'-: '" . - * s . 3 �! --•}�'}. ;7 ,�r- •Y -tea �,• 1 ._ •'�• 1 ? • _a �- -`441*- -, - -� _ �t--' - `r ,u --•---'--t''. _ . :rte_ --_ zr - -. - -- 4111. % A *i ■ w - _ r. -..4 ;■ �� ... . -.- -4-,.... .. -- -. v F...41-i.- Fill Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 2 of 2