Loading...
HomeMy WebLinkAboutMicropilesReport(18-6523.Micropiles.0003).pdf Client: Chad Salli Town of Vail GROUND 1309 Elkhorn 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: Jul 30,2018 Work Order No.: 18-6523.Micropiles.0003;ver: 1 Work Order Date: Jul 27,2018 Reviewed by: Chris Hutto Micro•iles General Contractor: Haselden Performed by: Chris Leeper Installation Contractor: Schnabel Installation Equipment: 2 x Hiltte HBR 605 Hydraulic Crawling Drilling Machine Placement Location: Group A Micropiles On-Site Notifications Name Company Tom Highsmith Haselden Construction Nick Schnabel Locations and Plan Dimensions Micropile Plan/Contractor Micropile Location Plan Diameter(in) Min.Length(ft) Min.Bedrock Plan Top of Pile No. Micropile No. Penetration(ft) Elevation(ft) 7 A4 A.012.5 6 41 - 8196.7 8 A25 A.015.2 6 41 - 8196.7 Excavation Measurements (ft) Vertical Reinforcing Micropile Existing Top of Overburden Top of Excavation Bottom Depth in Pile Top of Footing p Ground Pile Bedrock of Pile '° !tom ` No. Elevation Elevation Depth Elevation Depth Elevation Bedrock Length I 7 8196.2 8196.7 - - 41.5 8154.7 - 42.0 /• 8 8196.2 8196.7 - - 41.0 8155.2 - 41.5 Bottom of Footing---/ I Casing -- — Length r Top of Bedrock w /� J O. Casing i ° It — 2 t Reinforcing ---------V1 Centralizer I Irl Grout f~ I 1 I f r +—Micropile Diameter Excavation Conditions Micropile Drill Start Drill Finish Top of Casing Casing Casing Deviation Excavation Ground No. Time Time Elevation(ft) Length(ft) Diameter(in) from Center Plumbness Cleanliness Water Depth (ft) 7 7:28 AM 11:55 AM 8196.2 6.0 6 Conforms Conforms Conforms 12 8 8:25 AM 9:10 AM 8196.2 6.0 6 Conforms Conforms Conforms 15 Reinforcing Steel Required Vertical Actual Vertical Required Vertical Actual Vertical Required Splice Actual Splice Micropile No. Reinforcement Reinforcement Reinforcement Reinforcement Length(in) Length(in) Length(ft) Length(ft) 7 Threaded Bar/#18 Threaded Bar/#18 41 42 - - 8 Threaded Bar/#18 Threaded/#18 41 41.5 - - Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 1 of 3 Client: Chad Salli Town of Vail GROUND 1309 El 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: Jul 30,2018 Work Order No.: 18-6523.Micropiles.0003;ver: 1 Work Order Date: Jul 27,2018 Reviewed by: Chris Hutto Micro•files Grout Placement Micropile No. Grout Placement Grout Placement Water Depth Before Theoretical Grout Estimated Grout Method of Grout Start Time Finish Time Grout Placement(in) Volume(ft) Volume(ft) Placement 7 12:45 PM 1:02 PM 0 8.2 Tremmie 8 9:48 AM 10:02 AM 0 8.1 Tremmie Comments Micropile No. Description of Soil Location of Obstructions Comments 7 Silty,Clayey SAND w/Gravel Initial Drilling was complete at 8:48 A.M.Schnabel was unable to install reinforcement so they had to re-drill. 8 Silty,Clayey - - Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 2 of 3 Client: Chad Salli Town of Vail GROUND 1309 El 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: Jul 30,2018 Work Order No.: 18-6523.Micropiles.0003;ver: 1 Work Order Date: Jul 27,2018 Reviewed by: Chris Hutto Micro•files Photos - ��yJ•• . r.t . gip• 4 • ' �4�JT + _, 441 . r - 1 �.s r 2:•"'‘"- ' '• J.� 71...... � 'l, 'Sr-'"'. y �rC i' K ...,...,.:.. . .,.... ,. . .. ..... 2.. , . , , .A1 6,. ../...:' ' . a �. - is `• -i • I ''''. :.;4—'• . d--"Ieb:'.r.: \.. • '•Id::'11 i t — �y _ • l+i • 'wry :'1 . • Y a 1 4ti ' ' + ".1—!_` `y• iY '' • .. fie.. ` ', :. Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 3 of 3