Loading...
HomeMy WebLinkAboutMicropilesReport(18-6523.Micropiles.0001).pdf Client: Chad Salli Town of Vail GROUND 1309 Elkhorn 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: Jul 18,2018 Work Order No.: 18-6523.Micropiles.0001;ver: 1 Work Order Date: Jul 17,2018 Reviewed by: Shane Sorensen Micro•iles General Contractor: Haselden Performed by: Matt Raczewski Installation Contractor: Schnabel Installation Equipment: Drill rig Placement Location: Sacrificial Micropile at CL:A.2/7.2 Comments: We arrived on site for the scheduled time of 9am to observe Schnabel performing the compressive and tension verification testing of the sacrificial micro pile at gridline A.2/7.2.According to Schnabel's field engineer the test results look good and appear to be acceptable. On-Site Notifications Name Company Tom Highsmith Haselden Construction Robbie Kloehn Haselden Construction Schnabel Cody Pump Locations and Plan Dimensions Micropile Plan/Contractor Micropile Location Plan Diameter(in) Min.Length(ft) Min.Bedrock Plan Top of Pile No. Micropile No. Penetration(ft) Elevation(ft) Excavation Measurements (ft) _:--Vertical Reinforcing Micropile Existing Top of Overburden Top of Excavation Bottom Depth in Pile Top of Footing p Ground Pile Bedrock of Pile p No. Elevation Elevation Depth Elevation Depth Elevation Bedrock Length law Bottom of Footing- Casing t Length Top of Bedrock \ /y o. Casing /1 _ rl Reinforcing Centralizer Grout fI V —N Micropile Diameter Excavation Conditions Micropile Drill Start Drill Finish Top of Casing Casing Casing Deviation Excavation Ground No. Time Time Elevation(ft) Length(ft) Diameter(in) from Center Plumbness Cleanliness Water Depth (ft) Reinforcing Steel Required Vertical Actual Vertical Required Vertical Actual Vertical Required Splice Actual Splice Micropile No. Reinforcement Reinforcement Reinforcement Reinforcement Length(in) Length(in) Length(ft) Length(ft) Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 1 of 3 Client: Chad Salli Town of Vail GROUND 1309 El 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: Jul 18,2018 Work Order No.: 18-6523.Micropiles.0001;ver: 1 Work Order Date: Jul 17,2018 Reviewed by: Shane Sorensen Micro•files Grout Placement Micropile No. Grout Placement Grout Placement Water Depth Before Theoretical Grout Estimated Grout Method of Grout Start Time Finish Time Grout Placement(in) Volume(ft) Volume(ft) Placement Comments Micropile No. Description of Soil Location of Obstructions Comments Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 2 of 3 Client: Chad Salli Town of Vail GROUND 1309 El 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: Jul 18,2018 Work Order No.: 18-6523.Micropiles.0001;ver: 1 Work Order Date: Jul 17,2018 Reviewed by: Shane Sorensen Micro•files Photos • r li i Y y T- ;. , . 4i � .' �. • # 44; aRT"--,ms:Vi; � _ . .-..-e;*.: e ti -. 1 j 1 f '. .1. y[ . % SI - ' '#12114 t 101.&' 191 . ' Verification of micropile Actively testing _� ~ _ -� -yam^, - mak' . ti E - . - r • . te .■`'- UA ' .' . Compression Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 3 of 3