Loading...
HomeMy WebLinkAboutMicropilesReport(18-6523.Micropiles.0002).pdf Client: Chad Salli Town of Vail GROUND 1309 Elkhorn 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: Jul 28,2018 Work Order No.: 18-6523.Micropiles.0002;ver: 1 Work Order Date: Jul 26,2018 Reviewed by: Shane Sorensen Micro•files General Contractor: Haselden Performed by: Chris Leeper Installation Contractor: Schnabel Installation Equipment: 2 x Hi tte HBR 605 Hydraulic Crawling Drill Machines Placement Location: Group A Micropiles On-Site Notifications Name Company Robbie Kloehn Haselden Construction Justin Marschalk Town of Vail Nick Schnabel Locations and Plan Dimensions Micropile Plan/Contractor Micropile Location Plan Diameter(in) Min.Length(ft) Min.Bedrock Plan Top of Pile No. Micropile No. Penetration(ft) Elevation(ft) 1 A18 A.0/4.4 6 41 - 8196.7 2 A2 A.0/2.1 6 41 - 8196.7 3 A22 A.0/4.9 6 41 - 8169.7 4 A63 A.2/1.9 6 41 - 8196.7 5 A24 A.0/5.1 6 41 - 8196.7 6 A78 A.2/4.6 6 41 - 8196.7 Excavation Measurements (ft) %Vertical Reinforcing Micropile Existing Top of Overburden Top of Excavation Bottom DepDepth in Pile Top of Footing p Ground Pile Bedrock of Pile N.., No. Elevation Elevation Depth Elevation Depth Elevation Bedrock Length / 1 - ; 1 8196.2 8196.7 - - 41.3 8154.9 - 41.8 2 8196.2 8196.7 - - 43.5 8152.7 - 44.0 Bottom of Footing- / 1 3 8196.2 8196.7 - - 41.0 8155.2 - 41.5 I Casing Length 4 8196.2 8196.7 - - 41.4 8154.8 - 41.9 Top of Bedrock v 5 8196.2 8196.7 - - 41.3 8154.9 - 41.8 \; f v 6 8196.2 8196.7 - - 41.0 8155.2 - 41.5 Casing ° i i Reinforcing ---------V I Centralizer Grout 11 I P.,. +-Micropile Diameter Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 1 of 3 Client: Chad Salli Town of Vail GROUND 1309 El 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: Jul 28,2018 Work Order No.: 18-6523.Micropiles.0002;ver: 1 Work Order Date: Jul 26,2018 Reviewed by: Shane Sorensen Micro•iles Excavation Conditions Micropile Drill Start Drill Finish Top of Casing Casing Casing Deviation Excavation Ground No. Time Time Elevation(ft) Length(ft) Diameter(in) from Center Plumbness Cleanliness Water Depth (ft) 1 7:26 AM 8:13 AM 8196.2 6.0 6 Conforms Conforms Conforms 15 2 7:26 AM 9:40 AM 8196.2 6.0 6 Conforms Conforms Conforms 18 3 9:40 AM 11:22 AM 8196.2 6.0 6 Conforms Conforms Conforms 15 4 11:34 AM 1:08 PM 8196.2 6.0 6 Conforms Conforms Conforms 10 5 1:50 PM 2:40 PM 8196.2 6.0 6 Conforms Conforms Conforms 17 6 3:35 PM 4:13 PM 8196.2 6.0 6 Conforms Conforms Conforms 15 Reinforcing Steel Required Vertical Actual Vertical Required Vertical Actual Vertical Required Splice Actual Splice Micropile No. Reinforcement Reinforcement Reinforcement Reinforcement Length(in) Length(in) Length(ft) Length(ft) 1 Threaded Bar/#18 Threaded Bar/#18 41 41.8 - - 2 Threaded Bar/#18 Threaded Bar/#18 41 44 - - 3 Threaded Bar/#18 Threaded Bar/#18 41 41.5 - - 4 Threaded Bar/#18 Threaded Bar/#18 41 41.9 - - 5 Threaded Bar/#18 Threaded Bar/#18 41 41.8 - - 6 Threaded Bar/#18 Threaded Bar/#18 41 41.5 - - Grout Placement Micropile No. Grout Placement Grout Placement Water Depth Before Theoretical Grout Estimated Grout Method of Grout Start Time Finish Time Grout Placement(in) Volume(ft) Volume(ft) Placement 1 8:21 AM 8:36 AM 0 8.2 8.2 Tremmie 2 10:09 AM 10:28 AM 0 8.6 Tremmie 3 11:38 AM 12:04 PM 0 8.1 Tremmie 4 1:25 PM 1:42 PM 0 8.2 Tremmie 5 2:58 PM 3:15 PM 0 8.2 Tremmie 6 4:40 PM 4:52 PM 0 8.1 Tremmie Comments Micropile No. Description of Soil Location of Obstructions Comments 1 Silty,Clayey SAND w/Gravel - - 2 Silty,Clayey SAND w/Gravel - - 3 Silty,Clayey SAND w/Gravel - - 4 Silty,Clayey SAND w/Gravel - - 5 Silty,Clayey SAND w/Gravel - - 6 Silty,Clayey SAND w/Gravel - - Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 2 of 3 Client: Chad Salli Town of Vail GROUND 1309 El 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: Jul 28,2018 Work Order No.: 18-6523.Micropiles.0002;ver: 1 Work Order Date: Jul 26,2018 Reviewed by: Shane Sorensen Micro•files Photos � + .fid, 1,4 r* y • ti ` L`; Ibk w' r i ,y . HI . _...., lipappide;. t. .!..•--. y ..- r ' ` •E.. • ,-, ' • • ' _; � ' f :_ .-,75d...).....7 _ i?. v- fes - 7+iii -. -- Ir, N ..P y, .{tii . ' , ll /1 ..:4. t "1%. . . Micropile Micropile P I t 1Ai. . 1 • _.J-.y . .. , ..• . ..... ) • , __., . _ - . „, . . .- r .t �,,, l% .� . R 0 j w •� �i' t•f •, PVil ' ' - �_ 1. Micropile Micropile Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 3 of 3