Loading...
HomeMy WebLinkAboutMicropilesReport(18-6523.Micropiles.0027).pdf Client: Chad Salli Town of Vail GROUND 1309 El 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: Aug 3,2018 Work Order No.: 18-6523.Micropiles.0027;ver: 1 Work Order Date: Aug 3,2018 Reviewed by: Shane Sorensen Micro•iles General Contractor: Haselden Performed by: Chris Leeper Installation Contractor: Schnabel Installation Equipment: 2 x Hiltte HBR 605 Hydraulic Crawling Drilling Machine Placement Location: Micropiles from Groups A and D On-Site Notifications Name Company Tom Highsmith Haselden Construction Locations and Plan Dimensions Micropile Plan/Contractor Micropile Location Plan Diameter(in) Min.Length(ft) Min.Bedrock Plan Top of Pile No. Micropile No. Penetration(ft) Elevation(ft) 31 D1 C.910.9 6 26 - 8195.4 32 A15 A.014.0 6 41 - 8196.7 33 C7 B.910.9 6 26 - 8195.4 Excavation Measurements (ft) Vertical Reinforcing Micropile Existing Top of Overburden Top of Excavation Bottom Depth in Pile Top of Footing p Ground Pile Bedrock of Pile '° !tom ` No. Elevation Elevation Depth Elevation Depth Elevation Bedrock Length A ¢ 31 8194.9 8195.4 - - 26.8 8168.1 - 27.3 /• 32 8196.2 8196.7 - - 41.1 8155.1 - 41.6 Bottom of Footing---/ 33 8194.9 8195.4 - - - 8195.4 t Casing -- — Length t Top of Bedrock w /� J O. Casing ° !i t • 2u •t Reinforcing ---------V1 Centralizer I Irl Grout f~ I 1 I f r +—Micropile Diameter Excavation Conditions Micropile Drill Start Drill Finish Top of Casing Casing Casing Deviation Excavation Ground No. Time Time Elevation(ft) Length(ft) Diameter(in) from Center Plumbness Cleanliness Water Depth (ft) 31 8:03 AM 8:46 AM 8194.9 6.0 6 Conforms Conforms Conforms 20 32 9:30 AM 10:01 AM 8196.2 6.0 6 Conforms Conforms Conforms 21 33 10:11 AM 11:05 AM 8194.9 6.0 6 Conforms Conforms Conforms 20 Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 1 of 2 Client: Chad Salli Town of Vail GROUND 1309 El 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: Aug 3,2018 Work Order No.: 18-6523.Micropiles.0027;ver: 1 Work Order Date: Aug 3,2018 Reviewed by: Shane Sorensen Micro•files Reinforcing Steel Required Vertical Actual Vertical Required Vertical Actual Vertical Required Splice Actual Splice Micropile No. Reinforcement Reinforcement Reinforcement Reinforcement Length(in) Length(in) Length(ft) Length(ft) 31 Threaded Bar/#18 Threaded Bar/#18 26 27.3 - - 32 Threaded Bar/#18 Threaded Bar/#18 41 41.6 - - 33 Threaded Bar/#10 Threaded Bar/#10 26 - - Grout Placement Micropile No. Grout Placement Grout Placement Water Depth Before Theoretical Grout Estimated Grout Method of Grout Start Time Finish Time Grout Placement(in) Volume(ft) Volume(ft) Placement 31 9:13 AM 9:27 AM 0 5.4 TremmielDrop 32 10:30 AM 10:41 AM 0 8.2 Tremmie 33 10:11 AM 10:11 AM 0 1609.2 Tremmie Comments Micropile No. Description of Soil Location of Obstructions Comments 31 Silty,Clayey SAND w/Gravel - The last 5+/-feet of casing was poured directly into casing due to clog in tremie tube. 32 Silty,Clayey SAND w/Gravel - - Due to heavy rain Schnabel decided to delay the completion of 33 Silty,Clayey SAND w/Gravel - Micropile C7. Micropile C7 will be redrilled and grouted at a later date. Photos • lieW'r •I it ' ' . . • ! Fl. `lvY� Jfc i a+ ¢ 11.- J f P 11111111P- . (rile" • [. � 4 •S I ?•moi 1 .1111.111.1111111111: is,r NEA6ir 4 . _Ail II 4" olliblN7. 40i_ . • ., �. � fK., , Y - - -- - - _ Micropile Micropile Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 2 of 2