Loading...
HomeMy WebLinkAboutOther (Materials Testing)Report(18-6523.Other(MaterialsTesting).0001).pdf Client: Chad Salli Town of Vail GROUND 1309 El 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: May 11,2018 Work Order No.: 18-6523.Other(MaterialsTesting).0001;ver: 1 Work Order Date: May 8,2018 Reviewed by: Chris Hutto General Comments General Contractor: Haselden Performed by: Chris Leeper Subcontractor: Heyl Services Performed: Proof Roll Placement Location: Shoring wall embankment from Sta 0+80 to 2+00 Summary of Results: While on site to inspect the base of excavation for the soil nail shoring wall we observed significant pumping beneath the weight of the haul trucks delivering embankment fill. The material at the base of excavation appeared to be overly saturated and a stable platform was not achieved. The areas of concern were approximately from Sta 0+80 to 2+00. Haselden and Heyl were immediately notified of the issue and we recommended the that no embankment fill be placed until a stable platform is achieved at the base of excavation. Another proof roll should be scheduled at a later date. Notifications The following individuals were notifed of all results while on-site. Name Company Justin Fahnestock Haselden Construction Robbie Kloehn Haselden Construction Tom Highsmith Haselden Construction Chuck Heyl Photos _ ff r -'pi "fir�'- F y .4. • rVMOM. Ii. ' i yy��� —4a y ~�..7.---,.— r �.�`�M1"�nYV•-�.1Ge.ti -�n.'R1R�rk � . Yti _ .F` r ^ `may - `~\ , • • ' i r� i: + t it • Z X .. . e "c. .A, 'tet?! Proof roll Proof roll Results apply only to specific items and locations referenced and at the time of testing,observations or special inspections.Unless noted otherwise,samples were received in adequate condition.This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants,Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 1 of 1