Loading...
HomeMy WebLinkAboutOther (Materials Testing)Report(18-6523.Other(MaterialsTesting).0002).pdf Client: Chad Salli Town of Vail GROUND 1309 El 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: May 11,2018 Work Order No.: 18-6523.Other(MaterialsTesting).0002;ver: 1 Work Order Date: May 10,2018 Reviewed by: Chris Hutto General Comments General Contractor: Haselden Performed by: Chris Leeper Subcontractor: Heyl Services Performed: Visual Observation Placement Location: Shoring wall embankment from Sta 0+70 to 2+50 Comments: While onsite we observed the import and blending of pit run with native material to stabilize the bottom of excavation.The blended material placed appeared to hold the weight of the haul trucks with moderate to minimal deflection.Another proof roll will be performed prior to the placement of embankment fill. Notifications The following individuals were notifed of all results while on-site. Name Company Justin Fahnestock Haselden Construction Tom Highsmith Haselden Construction Chuck Heyl Photos �r • • • ticTf� - . Visual Results apply only to specific items and locations referenced and at the time of testing,observations or special inspections.Unless noted otherwise,samples were received in adequate condition.This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants,Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 1 of 1