Loading...
HomeMy WebLinkAboutOther (Materials Testing)Report(18-6523.Other(MaterialsTesting).0003).pdf Client: Chad Salli Town of Vail GROUND 1309 El 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: May 17,2018 Work Order No.: 18-6523.Other(MaterialsTesting).0003;ver: 1 Work Order Date: May 14,2018 Reviewed by: Chris Hutto General Comments General Contractor: Haselden Performed by: Chris Leeper Subcontractor: Heyl Services Performed: Observation Placement Location: Soil nail wall fill Summary of Results: While on site we observed Heyl utilize an excavator,front end loader,smooth drum roller,and a water truck place and compacted imported pit run from Sta 2+20 to 2+90. Since the native material contains greater than 30%rock retained on the 3/4"sieve,according to ASTM D698/1557,nuclear moisture-density testing should not be used for acceptance testing. Upon visual observation,the material appeared moist, dense,and generally unyielding beneath the weight of the compacting equipment. Photos r••� $ two. _ • x1 •x t. d, . � .'.�: r.•.�_ ;� .air.- . . .�_ Structural Fill Results apply only to specific items and locations referenced and at the time of testing,observations or special inspections.Unless noted otherwise,samples were received in adequate condition.This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants,Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 1 of 1