Town of Vail
GROUND 1309 El 81rn Drive
ENGINEERING
Red Sandstone Parking Garage
Report Date: May 17,2018 Work Order No.: 18-6523.Other(MaterialsTesting).0005;ver: 1
Work Order Date: May 17,2018 Reviewed by: Chris Hutto
General Comments
General Contractor: Haselden Performed by: Chris Leeper
Subcontractor: Heyl
Services Performed: Visual Compaction
Placement Location: Soil nail wall backfill
Comments: While on site we observed Heyl utilize an excavator,front end loader,smooth drum roller,and a water truck place and
compacted imported pit run from Sta 0+70 to 1+20.
Since the native material contains greater than 30%rock retained on the 3/4"sieve,according to ASTM D698/1557,nuclear
moisture-density testing should not be used for acceptance testing. Upon visual observation,the material appeared moist,
dense,and generally unyielding beneath the weight of the compacting equipment.
Notifications
The following individuals were notifed of all results while on-site.
Name Company
Justin Fahnestock Haselden Construction
Chuck Heyl
Photos
•
•
pt
k if
•
•
•
•
Visual
Results apply only to specific items and locations referenced and at the time of testing,observations or special inspections.Unless noted otherwise,samples were received in adequate condition.This
report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants,Inc.