HomeMy WebLinkAboutOther (Materials Testing)Report(18-6523.Other(MaterialsTesting).0006).pdf Client: Chad Salli
Town of Vail
GROUND 1309 El 81rn Drive
ENGINEERING
Red Sandstone Parking Garage
Report Date: Jun 25,2018 Work Order No.: 18-6523.Other(MaterialsTesting).0006;ver: 1
Work Order Date: Jun 22,2018 Reviewed by: Shane Sorensen
General Comments
General Contractor: Haselden Performed by: Chris Leeper
Subcontractor: Heyl
Services Performed: Visual Observation
Placement Location: Parking structure access road
Summary of Results: While on site we observed the bottom of excavation for the west access road between Sta 3+10 to 3+80.Heyl had to remove
approximately 6 to 8 feet of unsuitable material to find a stable platform.A proof roll should be performed prior to the placement
of access road fill.
On-Site Notifications
Name Company
Tom Highsmith Haselden Construction
Chuck Heyl
Photos
" -
`; u - r•
InCrinMi
- ==--_
-4
' Yt�- im "
l _j- u - ' `v'_tf. �+ y,.-
.0
"At. - '.F - •- •
.—
,
' - F r •
it ..7_.:.:11.1..%;._..2.41.--:` # "-I—.. 'Y'ter. \- .. •. N�
Observation Observation
Results apply only to specific items and locations referenced and at the time of testing,observations or special inspections.Unless noted otherwise,samples were received in adequate condition.This
report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants,Inc.
www.groundeng.com
Englewood I Commerce City I Loveland I Granby I Gypsum Page 1 of 1