Loading...
HomeMy WebLinkAboutOther (Materials Testing)Report(18-6523.Other(MaterialsTesting).0006).pdf Client: Chad Salli Town of Vail GROUND 1309 El 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: Jun 25,2018 Work Order No.: 18-6523.Other(MaterialsTesting).0006;ver: 1 Work Order Date: Jun 22,2018 Reviewed by: Shane Sorensen General Comments General Contractor: Haselden Performed by: Chris Leeper Subcontractor: Heyl Services Performed: Visual Observation Placement Location: Parking structure access road Summary of Results: While on site we observed the bottom of excavation for the west access road between Sta 3+10 to 3+80.Heyl had to remove approximately 6 to 8 feet of unsuitable material to find a stable platform.A proof roll should be performed prior to the placement of access road fill. On-Site Notifications Name Company Tom Highsmith Haselden Construction Chuck Heyl Photos " - `; u - r• InCrinMi - ==--_ -4 ' Yt�- im " l _j- u - ' `v'_tf. �+ y,.- .0 "At. - '.F - •- • .— , ' - F r • it ..7_.:.:11.1..%;._..2.41.--:` # "-I—.. 'Y'ter. \- .. •. N� Observation Observation Results apply only to specific items and locations referenced and at the time of testing,observations or special inspections.Unless noted otherwise,samples were received in adequate condition.This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants,Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 1 of 1