HomeMy WebLinkAboutShotcreteReport(18-6523.Shotcrete.0002).pdf Client: Chad Salli
Town of Vail
GROUND 1309 El 81rn Drive
ENGINEERING
Red Sandstone Parking Garage
Report Date: Jun 22,2018 Work Order No.: 18-6523.Shotcrete.0002;ver: 1
Work Order Date: Jun 13,2018 Reviewed by: Shane Sorensen
Shotcrete
Placement Contractor: Schnabel Performed by: Chris Leeper
Nozzleman: Nick Quantity Placed: 10 yd'
Structure Type, Thickness: Soil nail wall,8 in Weather: Sunny
Finish, Curing Methods: Gun Finished, None
Placement Location: North wall:Sta 2+20 to 2+92,8222'to 8233.5'
Comments: A shotcrete panel was not constructed prior to placement of shotcrete.
Placement Area
Conforms Does Not Conform Not Applicable Not Observed
Surface/Substrate Condition:
❑ ❑ ❑ ❑
Reinforcing Steel Condition: LI LI LI LI
Means and Methods
Placement Method: LI LI LI LI
Reinforcing Encasement: LI LI LI LI
Presence of Voids: LI LI LI LI
Sand Pockets or Lamination: 0 ❑ ❑ ❑
Finish and Curing
Finish Methods: 0 ❑ ❑ ❑
Curing Methods: 0 ❑ ❑ ❑
On-Site Notifications
Name Company
Justin Marschalk Town of Vail
Tom Highsmith Haselden Construction
Shotcrete Specifications
Fresh Properties Hardened Properties
717-Shotcrete Air Content 5 to 9% Average Compressive 4000 min. Shotcrete
Strength
717-Shotcrete Slump 2 to 4 inches Conformance Test Age 28 min. Shotcrete
Material
Material Property Target
Casey,8.5 SHOTCR
Shotcrete Sampling
Sample Quantity Truck Ticket Air Temp Water
Number Location (yd3) Number Number Batch Time Test Time (oF) Added
(gal)
2 Sta 2+85 10 133 316260 9:49 AM 11:10 AM 75 0
Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not
be reproduced,except in full,without the written permission of GROUND Engineering Consultants, Inc.
www.groundeng.com
Englewood I Commerce City I Loveland I Granby I Gypsum Page 1 of 2
Client: Chad Salli
Town of Vail
GROUND 1309 El 81rn Drive
ENGINEERING
Red Sandstone Parking Garage
Report Date: Jun 22,2018 Work Order No.: 18-6523.Shotcrete.0002;ver: 1
Work Order Date: Jun 13,2018 Reviewed by: Shane Sorensen
Shotcrete
Physical Properties of Shotcrete
Sample Concrete Temp Slump(in) Air Content(%) Volume of Weight of Empty Weight of Full Unit Weight(pcf)
Number (°F) Measure(ft') Measure(Ib) Measure(Ib)
2 77 3 6.2 .249 7.78 42.09 137.8
Photos
I:— I-FITIIIIIIIMM.111.M.MMti
•
1
11 R,
' ' 11 -1 "s.‘-.:1-. ' t C' IL
•- 1'
_ _1. 4, 1 J.- 1 1 - - - ' ,--
'�': „� x
.•t , ti Y - ` --- - ��.mac,. .y7M..- "\.. _��n`a
Shotcrete Shotcrete
_ -
Iice,
r
_
Cy c f
'►'T' _ � J— r — a.
b i L1. L -
,.4- ''.77.--.
:...mo i` rR.�y,..=•"_.__.='_�- - + f
rr�.7is.} --Li..---- ..s: - ^ . "�'-_ •�. - j,� _ / c '
:x;�. - '. `?;..� _ r :lis
l I s. ,5
► tri•. _ A- `, --. _ �. - a4
nti
1 •.: .:;,,,,....
., _
__, . _s,)
. ..
_ - ..:,•..,..,, _ _,--- • 4..7. . ,-;,r- - '-`;:-!'LL-2-, -: ,-4-- _ __ . t'.3.--' •- ' . -
Shotcrete Shotcrete
Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not
be reproduced,except in full,without the written permission of GROUND Engineering Consultants, Inc.
www.groundeng.com
Englewood I Commerce City I Loveland I Granby I Gypsum Page 2 of 2