HomeMy WebLinkAboutShotcreteReport(18-6523.Shotcrete.0010).pdf Client: Chad Salli
Town of Vail
GROUND 1309 El 81rn Drive
ENGINEERING
Red Sandstone Parking Garage
Report Date: Jul 26,2018 Work Order No.: 18-6523.Shotcrete.0010;ver:3
Work Order Date: Jun 27,2018 Reviewed by: Aaron Loeck
Shotcrete
Placement Contractor: Schnabel Performed by: Chris Leeper
Nozzleman: Nick Quantity Placed: 10 yd3
Structure Type, Thickness: Soil Nail Retaining Wall,8 in Weather: Mostly Sunny
Finish, Curing Methods: Other,None
Placement Location: North Soil Nail Wall:Sta 1+80 to 2+20(8217'-8222')
Placement Area
Conforms Does Not Conform Not Applicable Not Observed
Surface/Substrate Condition: U U
Reinforcing Steel Condition: U U
Means and Methods
Placement Method:
Reinforcing Encasement: DI
Presence of Voids: DI
Sand Pockets or Lamination:
Finish and Curing
Finish Methods: El
Curing Methods: El
On-Site Notifications
Name Company
Tom Highsmith Haselden Construction
Kevin Haas Martin&Martin, Inc.
Shotcrete Specifications
Fresh Properties Hardened Properties
717-Shotcrete Air Content 5 to 9% Average Compressive 4000 min. Shotcrete
Strength
717-Shotcrete Slump 2 to 4 inches Conformance Test Age 28 min. Shotcrete
Material
Material Property Target
Casey,8.5 SHOTCR
Results apply only to the specific items and locations referenced and at the time of testing,observations or special inspections.This report should not be reproduced,except in full,without the written
permission of GROUND Engineering Consultants,Inc.
www.groundeng.com
Englewood I Commerce City I Loveland I Granby I Gypsum Page 1 of 3
Client: Chad Salli
Town of Vail
GROUND 1309 Elkhorn
81rn Drive
ENGINEERING
Red Sandstone Parking Garage
Report Date: Jul 26,2018 Work Order No.: 18-6523.Shotcrete.0010;ver:3
Work Order Date: Jun 27,2018 Reviewed by: Aaron Loeck
Shotcrete
Shotcrete Sampling
Quantity Truck Ticket Air Temp Water
Sample No. Location (yd') Number Number Batch Time Test Time (°F) Added
(gal)
7 Sta 2+00(8220') 10 134 316590 9:45 AM 11:10 AM 74 5
Physical Properties of Shotcrete
Sample No. Concrete Temp. (°F) Slump(in) Air Cont. (%) Meas. Vol. (ft') Empty Meas. (lb) Full Meas. (Ib) Unit Wt. (pct) Panels Cast
7 80 3 5.2 .249 7.78 42.21 138.3 Yes
Compressive Strength of Shotcrete Cores (ASTM C42 / AASHTO T24)
Sample No.: 7 Laboratory ID: Shotcrete37
Age(d) Conformance Diameter(in) Area(in2) Length(in) L/D Ratio Correction Maximum Corrected
Core Factor Load(lb-f) Strength(psi)
28 Yes 1.97 3.05 4.00 2.0 1.00 26,210 8,590
28 Yes 1.97 3.05 4.05 2.1 1.00 26,520 8,700
28 Yes 1.97 3.05 3.95 2.0 1.00 26,400 8,660
Average Conformance Compressive Strength(psi) 8,650
Compressive Strength of Shotcrete Cores (ASTM C42 / AASHTO T24)
Sample No.: 7 Laboratory ID: Shotcrete43
Age(d) ConformanceCorrection Maximum Corrected
Diameter(in) Area(in2) Length(in) L/D Ratio
Core Factor Load(lb-f) Strength(psi)
7 No 1.97 3.05 3.90 2.0 1.00 18,890 6,190
7 No 1.97 3.05 3.95 2.0 1.00 18,640 6,110
Results apply only to the specific items and locations referenced and at the time of testing,observations or special inspections.This report should not be reproduced,except in full,without the written
permission of GROUND Engineering Consultants,Inc.
www.groundeng.com
Englewood I Commerce City I Loveland I Granby I Gypsum Page 2 of 3
Client: Chad Salli
o
Town f Vail
GROUND
Vail,n of 8165Drive
ENGINEERING
Red Sandstone Parking Garage
Report Date: Jul 26,2018 Work Order No.: 18-6523.Shotcrete.0010;ver:3
Work Order Date: Jun 27,2018 Reviewed by: Aaron Loeck
Shotcrete
Photos
I L
•
1 +t
•
Shotcrete
Results apply only to the specific items and locations referenced and at the time of testing,observations or special inspections.This report should not be reproduced,except in full,without the written
permission of GROUND Engineering Consultants,Inc.
www.groundeng.com
Englewood I Commerce City I Loveland I Granby I Gypsum Page 3 of 3