Loading...
HomeMy WebLinkAboutShotcreteReport(18-6523.Shotcrete.0015).pdf Client: Chad Salli Town of Vail GROUND 1309 El 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: Jul 5,2018 Work Order No.: 18-6523.Shotcrete.0015;ver: 1 Work Order Date: Jul 5,2018 Reviewed by: Shane Sorensen Shotcrete Placement Contractor: Schnabel Performed by: Chris Leeper Nozzleman: Nick Quantity Placed: 15 yd3 Structure Type, Thickness: Soil Nail Retaining Wall,8 in Weather: Partly Cloudy Finish, Curing Methods: Other,None Placement Location: Sta 2+70 to 3+25(8212'to 8217') Placement Area Conforms Does Not Conform Not Applicable Not Observed Surface/Substrate Condition: ❑ ❑ ❑ ❑ Reinforcing Steel Condition: LI LI LI LI Means and Methods Placement Method: LI LI LI LI Reinforcing Encasement: LI LI LI LI Presence of Voids: LI LI LI LI Sand Pockets or Lamination: 0 ❑ ❑ ❑ Finish and Curing Finish Methods: 0 ❑ ❑ ❑ Curing Methods: 0 ❑ ❑ ❑ On-Site Notifications Name Company Tom Highsmith Haselden Construction Shotcrete Specifications Fresh Properties Hardened Properties 717-Shotcrete Air Content 5 to 9% Average Compressive 4000 min. Shotcrete Strength 717-Shotcrete Slump 2 to 4 inches Conformance Test Age 28 min. Shotcrete Material Material Property Target Casey,8.5 SHOTCR Shotcrete Sampling Sample Quantity Truck Ticket Air Temp Water Number Location (yd3) Number Number Batch Time Test Time (°F) Added (gal) 9 Sta 2+75,8215' 10 150 316745 11:55 AM 1:15 AM 78 0 Physical Properties of Shotcrete Sample Concrete Temp Slump(in) Air Content(%) Volume of Weight of Empty Weight of Full Unit Weight(pcf) Number ( F) Measure(ft) Measure(Ib) Measure(Ib) 9 75 2.5 5.8 .249 7.78 42.67 140.1 Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 1 of 2 Client: Chad Salli Town of Vail GROUND 1309 El 81rn Drive ENGINEERING Red Sandstone Parking Garage Report Date: Jul 5,2018 Work Order No.: 18-6523.Shotcrete.0015;ver: 1 Work Order Date: Jul 5,2018 Reviewed by: Shane Sorensen Shotcrete Photos 4\. i ...„.....,_ _ 4 r --------- __, .. -,,..-.... ■ \,/) . ,,,__ _ ____ � 1 A lit i • IN - .• - Shotcrete Results apply only to the specific items and locations referenced and at the time of testing, observations or special inspections. This report should not be reproduced,except in full,without the written permission of GROUND Engineering Consultants, Inc. www.groundeng.com Englewood I Commerce City I Loveland I Granby I Gypsum Page 2 of 2